For Comment Edition of Technical Rept on Matl Selection & Processing Guidelines for BWR Coolant Pressure Boundary Piping, Revision 1
ML19211C137
Person / Time
Issue date: 10/31/1979
From: Cheng C, Gamble R, Taboada A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19211C133 List:
References
REF-GTECI-A-42, REF-GTECI-PI, TASK-A-42, TASK-OR NUREG-0313, NUREG-0313-R01, NUREG-313, NUREG-313-R1, SECY-79-592, NUDOCS 8001100230
Download: ML19211C137 (43)


Text

.

NUREG-0313 Rev.1 For Comment Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping Resolution of Generic Technical Activity A-42 C. Y. Cheng, R. M. Gamble, A. Taboada, B. Turoviin ea Reactor Regulation S Nuclear Regulatory pe nauq s...h -

1736 289 80 01100 a O

NUREG-0313 Rev.1 For Comment Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping Resolution of Generic Technical Activity A-42 Manuscript Completed: August 1979 Date Published: october 1979 C. Y. Cheng, R. M. Gamble, A. Taboada, B. Turovlin Division of Operating Reactors Division of Systems Safety Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

,s a

+

f '.-

1736 290

ABSTRACT This report updates and supercedes the NRC technical positions established in NUREG-0313, " Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping," published in July 1977.

This report sets forth the NRC staff's revised acceptable methods to reduce the intergranular stress corrosion cracking susceptibility of BWR ASME Code Class 1 & 2 pressure boundary piping and safe end.

For plants that cannot fully comply with the material selection, testing, and processing guidelines of this document, varying degrees of augmented inservice inspection and leak detection requirements are presented.

jJ}6 29) iii

i TABLE OF CONTENTS Page ABSTRACT............................................................

iii I.

INTRODUCTION........................................................

1 II.

SUMMARY

OF ACCEPTABLE METHODS TO MINIMIZE CRACK SUSCEPTIBILITY -

MATERIAL SELECTION, TESTING, AND PROCESSING GUIDELINES.............

7 A.

Selection of Materials......

7 1.

Corrosion Resistant Materials....

7 2.

Corrosion Resist nt Safe Ends and Thermal Sleeves.........

8 B.

Testing of Materials........

9 C.

Processing of Materials........

9 III. INSERVICE INSPECTION AND LEAK DETECTION REQUIREMENTS FOR BWRs WITH VARYING DEGREES OF CONFORMANCE TO MATERIAL SELECTION, TESTING, AND I

PROCESSING GUIDELINES.

10 IV.

IMPLEMENTATION OF MATERIAL SELECTION, TESTING, AND PROCESSING l

GUIDELINES...

22 V.

GENERAL RECOMMENDATIONS.

23 APPENDICES APPENDIX A - Task Action Plan A Pipe Cracks in Boiling Water Reactors...................................................

A-1 APPENDIX B - NRC Notice in the Federal Register Requesting Public Comment on NUREG-0531......................................

B-1 APPENDIX C - Summary of Public Comments on NUREG-0531...................

C-1 i736 292 v

t

I.

INTRODUCTION This report is an update of the NRC technical position defined in NUREG-0313,

" Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping," July 1977.

This NUREG report constitutes resolution of subtask C-1 and partial resolution of subtask C-2 of Generic Task No. A-42, " Pipe Cracks in Boiling Water Reactors." Task Action Plan A-42 is attached as Appendix A.

This report revises and supercedes the staff positions stated in NUREG-0313 with the principal differences being:

The guidelines for reducing the intergranular stress corrosion cracking (IGSCC) susceptibility have been extended to cover ASME Code Class 2 piping.

Inclusion of augmented inservice inspection requirements for noncon-forming safe ends.

Updating the inservice inspection sampling schemes to comply with the most recent NRC position.

Identification of NUREG-0531 (1978 Pipe Crack Study Group report, See p. 4) recommendations which cannot be implemented immediately without further NRC evaluation.

}f3b 293 The developmental items identified in this report are for future improve-ments and are not required for the present plant safety or for the resolu-tion of Generic Task No. A-42.

The staff concludes that, pending implementation of the guidelines of this report, IGSCC in BWR pressure boundary piping, while undesirable, will not pose an undue risk to the health and safety of the public.

Leaks and cracks in the heat-affected zones (HAZs) of welds that join austenitic stainless steel piping and associated components in BWRs have been observed since the mid-1960's.

Prior to September 1974, the affected (cfacked) piping was mainly Type 304 stainless steel with diameters of 8 inches or less.

All the cracks were attributed to IGSCC due to the combination of high local stress, sensitization of material, and high oxygen content in the water.

In each case, it was believed that the problem had been corrected or substantially reduced by better control of welding, contaminants, and design.

I During the last quarter of 1974, a number of incidents of IGSCC in weld HAZ of 4-inch diameter recirculation bypass lines and in 10-inch diameter core spray lines were observed.

Following these occurrences, the Nuclear Regulatory Commission (NRC) formed a Pipe Cracking Study Group (PCSG) in January 1975 to (a) investigate the cause, extent, and safety implications of cracks, (b) make an interim recommendation for operating plants, and (c) recommend corrective actions to be taken by future plants.

In 1736 294

_2-

October 1975, the Study Group published its report, NUREG-75/067, " Technical Report, Investigation and Evaluation of Cracking in Austenitic Stainless Steel Piping of Boiling Water Reactor Plants." During the same general time span, the General Electric Company (GE) conducted an independent evaluation of cracking problems and submitted their findings and recommend-ations to the NRC (NEDO-21000, " Investigation of Cause of Cracking in Austenitic Stainless Steel Pipes").

Following staff review of the Study Group's and GE's recommendations, the staff issued an implementation document, NUREG-0313.

This document, based on the information available at that time, sets forth the NRC technical positions consistent with the recommendations of the Study Group.

Since 1975, IGSCC has continued to be detected in recirculation bypass and core spray lines.

Incidence of IGSCC has also been observed in some stainless steel recirculation riser piping up to 12 inches in diameter in Japan and in large diameter (> 20 inches) recirculation piping in Germany.

These incidents, together with the questions concerning the reliability of ultrasonic inspections, led to the formation of a new PCSG by NRC in September 1978.

The new Study Group was specifically chartered to address the following issues:

the signjficance of the cracks discovered in large diameter pipes relative to the conclusions and recommendations set forth in the referenced report and in its implementation document, NUREG-0313; )

b

resolution of concerns raised over the ability of ultrasonic techniques to detect cracks in austenitic stainless steel; the significance of the cracks found in large diameter sensitized safe ends, and any recommendations regarding the current NRC program for dealing with this matter; the potential for stress corrosion cracking in PWRs; and the significance of the safe end cracking at Duane Arnold relative to similar material and design aspects at other facilities.

In February 1979, the Study Group issued a report, NUREG-0531, "Investiga-tion and Evaluation of Stress-Corrosion Cracking in Piping of Light Water Reactor Plants." The principal conclusion of the Study Group is that IGSCC in large-diameter piping, while undesirable, will not be a hazard to public health and safety.

The new Study Group also reaffirmed that the conclusions and recommendations reported in NUREG-75/067 by the previous group and the implementing document, NUREG-0313, are still valid.

In addition, they discussed several additional ways to reduce the potential for IGSCC and also addressed IGSCC in safe ends.

During the same general time span, the General Electric Company conducted an independent evaluation of the recent cracking in large diameter pipes and 1736 296,

submitted their findings and recommendations to the NRC.8 The GE main conclusions are:

(a) IGSCC in Type 304 stainless steel weld HAZs remains to be a non-safety problem in spite of recent cracking in large diameter pipes, and (b) GE approach outlined in NED0-21000 continues to be valid.

Following the issuance of the Study Group report in February 1979, the NRC noticed the availability of the report in the Federal Register and requested interested parties to provide any comments to the NRC by May 15, 1979.

A copy of that Notice is attached as Appendix B.

Comments were requested so that the staff would have the benefit of industry and public comments prior to the development of its revised guidelines targeted for issuances in August 1979.

In response to the staff's request, comments from six organizations and individuals were received.

These comments are summarized in Appendix C.

All these comments were taken into consideration by the staff in developing its position as stated in this report.

The IGSCC occurs in a small percentage of the welds in BWR piping which contains relatively stagnant, intermittent or low flow coolant.

Histori-cally, these cracks have been discovered either by volumetric examination, by visual inspection, or by leakage detection systems.

The growth pattern of the cracks are such that it is unlikely that these cracks would go undetected before they grow to significant size where the pipe function might be compromised.

Further, because of the inherent high material Letter from G. Sherwood to V. Stello, " General Electric Meeting with NRC on 1

IGSCC," September 12, 1978.

1736 297

_S_

toughness of austenitic stainless steel piping, IGSCC is unlikely to cause a rapidly propagating failure resulting in a loss-of-coolant accident.

Although the likelihood is extemely low that these IGSCCs will propagate far enough to create a significant hazard to the public, the occurrence of such cracks is undesirable. Measures should therefore be taken to minimize IGSCC in BWR piping systems and improve overall plant reliability.

It is the purpose of this document to set forth the NRC staff's revised acceptable methods to reduce the IGSCC susceptibility of BWR piping and thus provide an increased level of reactor coolant pressure boundary and engineered safety features systems integrity.

Recognizing that complete compliance with these guidelines may not be practical, or even possible, for all plants, varying degrees of conformance to our guidelines are provided in Part IV.

Corrosion resistant materials for installation in BWR piping system, methods of testing, and processing techniques acceptable to the NRC, are presented in Part II.

For plants that cannot fully comply with the guidelines specified in Part II of this document, varying degrees of augmented inservice inspection and leak detection requirements are established in Part III.

The general recommendations that will lead to either limit the extent of IGSCC or improve the chance of detecting such IGSCC are outlined in Part V.

They are for future improvements and are not required for the present plant safety or for the resolution of Generic Task No. A-42.

1736 298

II.

SUMMARY

OF ACCEPTABLE METHODS TO MINIMIZE CRACK SUSCEPTIBILITY - MATERIAL SELECTION, TESTING, AND PROCESSING GUIDELINES A.

Selection of Materials Only those materials described in 1. and 2., below, are acceptable to the NRC for installation in BWR piping systems.

Other materials may be used when evaluated and accepted by the NRC.

1.

Corrosion Resistant Materials All pipe and fitting material including safe ends, thermal sleeves, and weld metal should be of a type and grade that has been demonstrated to be highly resistant to oxygen-assisted stress corrosion in the as-installed condition.

Materials which have been so demonstrated include ferritic steels, " Nuclear Grade" austenitic stainless steels,2 Types 304L and 316L austeni-tic stainless steels, Type CF-3 cast stainless steel, and Type 308L stainless steel weld metal with at least 5% ferrite content.

Unstabilized wrought austenitic stainless steel without controlled low carbon does not meet this requirement uriless all such piping i These materials have controlled low carbon (0.02% max) and nitrogen (0.1% max) contents and meet all requirements, including mechanical property requirements, of ASME specification for regular grades of Type 304 or 316 stainless steel pipe.

1736 299 including welds is in the solution-annealed condition.

The use of such material (i.e., regular grades of Types 304 and 316 stainless steels) should be avoided.

If such material is used, the as-installed piping including welds should be in the solution-annealed condition. Where regular grades of Types 304 and 316 are used and welding or heat treatment is required, special measures, such as those described in Part II.C., Processing of Materials, should be taken to ensure that IGSCC will not occur.

Such measures may include (1) solutinn annealing subsequent to the welding or heat treatment, and (2) weld cladding of materials to be welded using techniques which have been demonstrated to eliminate sensitization and reduce residual stresses.

2.

Corrosion Resistant Safe Ends and Thermal Sleeves All unstabilized wrought austenitic stainless steel materials used for safe ends and thermal sleeves without controllett low carbon contents (L grades and Nuclear Grade) should be in the solution-annealed condition.

If as a consequence of fabrication, welds joining these materials are not solution-annealed, they should be made between cast (or weld overlaid) austenitic stainless steel surfaces (5% minimum ferrite) or other materials having high resistance to oxygen-assisted stress corrosion.

The joint design must be such that any high stress areas in unstabi-lized wrought austenitic stainless steel without controlled low carbon content, which may become sensitized as a result of the velding process,"is not exposed to the reactor coolant.

Thermal 1736 300,

sleeve attachments that are welded to the pressure boundary and form crevices where impurities may accumulate should not be exposed to a BWR coolant environment.

B.

Tr. sting of Materials For new installation, tests should be made on all regular grade stainless steels to demonstrate that the material was properly annealed and is not susceptible to IGSCC.

Such tests may include Practices A3 and E4 of ASTM A-262, " Recommended Practices for Detecting Susceptibility to Intergranular Attack in Stainless Steels."

The Electrochemical Potentiokinetic Reactivation (EPR) test has not yet been formally evaluated and accepted by the NRC.

C.

Processing of Materials Corrosion resistant cladding with a duplex microstructure (5% minimum ferrite) may be applied to the ends of Type 304 or 316 stainless steel pipe for the. purpose of avoiding IGSCC at weldments.

Such cladding, which is intended to (a) minimize the HAZ on the pipe inner surface, (b) move the HAZ away from the highly stressed region next to the attachment weld, and (c) isolate the weldment from the environment, may be applied under the following conditions:

3 Practice A - Oxalic Acid Etch Test for Classification of Etch Structures of Stainless Steels.

4 Practice E - Copper-Copper Sulfate-Sulfuric Acid Test for Detecting Susceptibiltiy to Intergranular Attack in Stainless Steels. 1736 301

1.

For repair welding and modification to in place systems in operating plants and plants under construction.

When the repair welding or modification requires replacement of pipe, the replacement pipe should be solution-annealea after cladding.

2.

For initial construction, all of the piping should be solution-annealed after cladding.

The joint design of all welds must be such that any high stress areas in the unstabilized wrought austenitic stainless steel, which I

may become sensitized as a result of a welding process, is not exposed to the reactor coolant.

Other processes for minimizing stresses and IGSCC in austenitic stainless steel weldments such as Induction Heating Stress Improvement (IHSI) and Heat Sink Welding (HSW) have not yet been formally evaluated and accepted by the NRC.

l III. INSERVICE INSPECTION AND LEAK DETECTION REQUIREMENTS FOR BWRs WITH VARYING DEGREES OF CONFORMANCE TO MATERIAL SELECTION, TESTING, AND PROCESSING GUIDELINES A.

For plants whose ASME Code Class 1 and 2 pressure boundary piping meets the guidelines of Part II, no augmented inservice inspection or leak detection requirements beyond those specified in the 10 CFR 50.55a(g), " Inservice Inspection Requirements" and the latest NRC Standard Technical Specifications for leakage detection are necessary.

)lb B.

ASME Code Class 1 and 2 pressure boundary piping that does not meet guidelines of Part II is designated nonconforming and must have additional inservice inspection and more stringent leak detection requirements.

The degree of augmented inservice inspection of such piping depends on whether the specific nonconforming piping runs are classified as " Service Sensitive." " Service Sensitive" lines were and will be designated by the NRC and are defined as those that have experienced cracking of a generic nature, or that are considered to be particularly susceptible to cracking because of a combination of high local stress, material condition, and high oxygen content in the relatively stagnant, intermittent, or low flow coolant.

Examples of piping considered to be " Service Sensitive" include but are not limited to:

core spray lines, recirculation riser lines, recirculation bypass lines (or pipe extensions / stub tubes on plants where the bypass lines have been removed), CRD hydraulic return lines, isolation condenser lines, recirculation inlet lines at safe ends where crevices are formed by the welded thermal sleeve attachments, and shutdown heat exchanger lines.

If cracking should later be found in a particular piping run and considered to be generic, it will be designated by the NRC as " Service Sensitive."

Leakage detection and augmented inservice inspection requirements for nonconforming lines and nonconforming, service sensitive lines are specified below:

~

1736 303 I

1.

Nonconforming Lines that are not Service Sensitive a.

Leak Detection:

The reactor coolant leakage detection systems should be upgraded to enhance the discovery of unidentified leakage that may include through-wall cracks developed in austenitic stainless steel piping.

(1) The leakage detection system provided should include sufficiently diverse leak detection methods with l

1 adequate sensitivity to detect and measure small j

leaks in a timely manner and to identify the leakage sources within the practical limits.

Acceptable leakage detection and monitoring systems are described in Section C, Regulatory Position of Regulatory Guide l

1 1.45, " Reactor Coolant Pressure Boundary Leakage i

Detection Systems."

I i

Particular attention should be given to upgrading and calibrating those leak detection systems that will provide prompt indication of an increase in leakage rate.

Other equivalent leakage detection and collection systems will be reviewed on a case-by case basis, i

1736 304..,---

(2) Plant shutdown should be initiated for inspection and corrective action when any of the leakage detection systems indicates, within a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or less, an increase in rate of unidentified leakage in excess of 2 gallons per minute or its equivalent, or when the total unidentified leakage attains a rate of 5 gallons per minute or its equivalent, whichever occurs first.

For sump level monitoring systems with fixed measurement interval method, the level should be monitored at 4-hour intervals or less.

(3) Unidentified leakage should include all leakage other than:

(a) Leakage into closed systems, such as pump seal or valve packing leaks that are captured, flow metered, and conducted to a sump or collecting tank, or (b) Leakage into the containment atmosphere from sources that are both specifically located and known either not to interfere with the operations of unidentified leakage monitoring systems or not to be from a through-wall crack in the piping within the reactor coolant pressure boundary.

1736 305 b.

Augmented Inservice Inspection:

Inservice inspection of the nonconforming, nonservice sensitive lines should te conducted in accordance with the following program:5 (1) For ASME Code Class 1 components and piping, each pressure retaining dissimilar metal weld subject to inservice inspection requirements of Section XI should be examined at least once in no more than 80 months (two-thirds of the time prescribed in the ASME Boiler and Pressure Vessel Code Section XI).

Such examination should include all internal attachment welds that are not through-wall welds but are welded to or form part of the pressure boundary.

(2) The following ASME Code Class plpe welds subject to inservice inspection requirements of Section XI should be examined at least once in no more than 80 months:

(a) all welds at terminal ends 6 of pipe at vessel nozzles; 5 This program is largely taken from the requirements of ASME Boiler & Pressure Vessel Code,Section XI, referenced in the paragraph (b) of 10 CFR 50.55a,

" Codes and Standards."

6 Terminal ends are the extremities of piping runs that connect to structcres, components (such as vessels, pumps, valves) or pipe anchors, each of which acts as rigid restraints or provides at least two degrees of restraint to piping thermal expansion.

1736 306 I

(b) all welds having a designed combined primary plus secondary stress range of 2.45,or more; (c) all welds having a de' sign cumulative fatigue usage factor of 0.4 or more; and (d) sufficient additional welds with high potential for cracking to make the total equal to 25% of the welds in each piping system.

(3) The following ASME Code Class 2 pipe welds which are subject to inservice inspection requirements of Section XI, excluding those in Residual Heat Removal Systems, Emergency Core Cooling Systems and Containment Heat Removal Systems, should be i*nspected at least once in no more than 80 months:

(a) all welds at locations where the stresses under the loadings resulting from Normal and Upset plant conditions including the Operating Basis Earthquake (0BE) as calculated by the sum of Equations (9) and (10) in NC-3652 exceed 0.8 (1.2Sh + b );

A (b) all welds at terminal ends of piping, including 5 ranch runs; 1736 307 (c) all dissimilar metal welds.

(d) additional welds with high potential for cracking at structural discontinuities 7 such that the total number of welds selected for examination equal to 25% of the circumferential welds in each piping system.

(4) The following ASME Code Class 2 pipe welds, subject to inservice inspection requirements of Section XI, in each Residual Heat Removal Systems, Emergency Core Cooling Systems, and Containment Heat Removal Systems should be examined at least once,in no more than 80 months:

(a) all welds of the terminal ends of pipe at vessel nozzles, and (b) at lesst 10% of the welds selected proportionately from the following categories:

' Structural discontinuities include pipe weld joints to vessel nozzles, valve bodies, pump casings, pipe fittings (such as elbows, tees, reducers, flanges, etc., conforming to ANSI Standard B 16.9) and pipe t, ranch connections and fittings.

1736 308 (i) circumferential welds at locations where the stresses under the loadings resulting from g plant conditions as calculated by the sum of Equations (9) and (10) in NC-3652 exceed 0.8 (1.2Sh

  • b )'

A (ii) welds at terminal ends of piping, including branch runs, (iii) dissimilar metal welds, (iv) welds at structural discontinuities, and (v) welds tiat cannot be pressure tested in accordar ce with IWC-5000.

The welds to be examineti shall be distributed approximately equally anong runs (or portions of runs) that aire essentialif similar in design, size, syste n function, anc service conditions.

(5) If examination < f (1), (2), (3), and (4) above, conducted during the first 80 months reveal no incidence of stress corrosion cracking, the examination frequency thereafter 1736 309 can revert to 120 months as prescribed ire Section XI of the ASME Boiler and Pressure Vessel Code.

Sampling plans other than those described in (2), (3),

and (4) above will be reviewed on a case-by-case basis.

2.

Nonconforming Lines that are Service Sensitive a.

Leak Detection:

The leakage detection requirements, described in IIIBla above, should be implemented.

b.

Augmented Inservice Inspection:

(1) The welds and adjoining areas of bypass piping of the discharge valves in the main recirculation loops, and of the austenitic stainless steel reactor core spray piping up to and including the second isolation valve, should be examined at each reactor refueling outage or at other scheduled or unscheduled plant outages.

Successive examination need not be closer than 6 months, if outages occur more frequently than 6 months.

This requirement applies to all welds in all bypass lines whether the 4-inch valve is kept open or closed during operation.

1736 310 1, _

In the event these examinations find the piping free of unacceptable indications for three successive inspections, the examination may be extended to each 36-month period (plus or minus by as much as 12 months) coincident with a refueling outage.

In these cases, the successive examination may be limited to all welds in one bypass pipe run and one reactor core spray piping If unacceptable flaw indications are detected, the run.

remaining piping runs in each group should be examined.

In the event these 36-month period examinations reveal no unacceptable indications for thrse successive inspec-tions, the welds and adjoining areas of these piping runs should be examined as described in III.B.l.b(1) for dis-similar metal welds and in III.B.l.b(2) for other welds.

(2) The dissimilar metal welds and adjoining areas of other ASME Coda Class 1 service sensitive piping should be examined at each reactor refueling outage or at other scheduled or unscheduled plant outages.

Successive examinations need not be closer than 6 months, if outages occur more frequently than 6 months.

Such examination should include all internal attachments that are not through-wall welds out are welded to or form part of the pressure boundary.

(3) The welds and adjoining areas of other ASME Code Class 1 service sensitive piping should be examined using the sampling plan described in III.B.l.b(2) except that the 1736 311 1,.

frequency of such examinations should be at each reactor refueling outege or at other scheduled or unscheduled plant outages.

Successive examinations need not be closer than 6 months, if outages occur more frequently than 6 months.

(4) The adjoining areas of internal attachment welds in recirculation inlet lines at safe ends where crevices are formed by the welded thermal sleeve attachments should be examined at each reactor refueling outage or at other scheduled or unscheduled plant outages.

Successive examinations need not be closer than 6 months, if outages occur more frequently than 6 months.

In the event the examinations described in (2), (3) and (4) above find the piping free of unacceptable indications for three successive inspections, the examination may be extended to each 36-month period (plus or minus by as much as 12 months) coinciding with a refueling outage.

-2 1736 312

In the event these 36-month period examinations reveal no unacceptable indications for three successive inspections, the frequency of examination may revert to 80-month periods (two-t'hirds the time prescribed in the ASME Code Section XI).

(5) The area, extent, and frequency of examination of the augmented inservice inspection for ASME Code Class 2 service sensitive lines will be determined on a case-by-case basis.

3.

Nondestructive Examination (NDE) Requirements The method of examinaiton and volume of material to be examined, the allowable indication standards, and exaInination procedures should comply with the requirements set forth in the applicable Edition and Addenda of the ASME Code,Section XI, specified in paragraph (g), " Inservice Inspection Requirements," of 10 CFR 50.55a, " Codes and Standards."

In some cases, the code examination procedures may not be effective for detecting or evaluating IGSCC and other ultrasonic (UT) procedures or advanced nondestructive examination techniques may be required to detect and evaluate stress corrosion cracking in austenitic stainless steel piping.

Improved UT procedures have been developed by certain organizations.

These improved 1736 313 UT detection and evaluation procedures which have been demc strated to be effective in detecting IGSCC should be used in t9e inservice inspection.

Recommendations for the developtrent and eventual implementation of these improved techniques are included in Part V.

IV.

IMPLEMENTATION OF MATERIAL SELECTION, TESTING, AND PROCESSING GUIDELINES A.

For olants under review, but for which a construction permit has not been :ssued, all lines should conform to the guidelines stated in Part II.

B.

For plants that have been issued a construction permit, all lines should conform to the guidelines stated in Part II unless it can be demonstrated to the staff that implementing the guidelines of Part II would result in undue hardship.

Where the guidelines of Part II are not complied with, additional measures should be taken in accordance with the guidelines stated in Part III of this document.

C.

For plants that have been iscaed an operating license, NRC designated service sensitive lines should be modified to conform to the guidelines stated in Part II, to the extent practicable.

Lines that experience cracking during service and are required to be replaced should be replaced with piping that conforms to the guidelines stated in Part II.

Where the guidelines of Part II are not complied wit., additional 1736 314

measures should be taken in accordance with the guidelines stated in Part III of this document.

I i

V.

GENERAL RECOMMENDATIONS The measures outlined in Part II of this document provide for positive actions that are consistent with current technology.

The implementation of these actions should markedly reduce the susceptibility of stainless steel piping to stress corrosion cracking in BWRs.

It is recognized that j

additional means could be used to limit the extent of corrosion of BWR I

pressure boundary piping materials and to improve the overall system integrity.

These include plant design and operational procedure considera-l tions to reduce system exposure to potentially aggressive environment, improved material selection, special fabrication and welding techniques, and provisions for volumetric inspection capability in the design of weld joints.

The use of such means to limit IGSCC will be reviewed on a case-by-case basis.

Although the items identified below are not required for the present i

plant safety, they may be expected to lead to means of limiting the extent df IGSCC and improving the chance of detecting such IGSCC.

Some of these items have not yet been fully developed (or have recently been developed) and have not yet been accepted by the NRC.

Specifically, areas that require further consideration are:

1736 315 A.

Improved ultrasonic inspection methods.

Such methods should be included in the ASME Code or included in a Regulatory Guide.

B.

Development and implementation of an improved focused inservice inspection program based on stress rule index, material of con-struction, history of cracking, etc.

C.

Improved weld joint design to ensure that required examinations can be performed effectively.

D.

Reduction of oxygen content in reactor coolant during all phases of reactor operation by water chemistry control, de-aeration of systems, etc.

E.

Minimization of stagnant or low flow coolant pressure boundary piping.

F.

Evaluation of newly developed alternate corrosion resistant materials in BWR environment.

G.

Evaluation of improvement of material corrosion resistance by alternate methods such as heat sink welding, induction heating stress improvement, etc. 1736 316

H.

Evaluation of the Electrochemical potentiokinetic reactivation technique for detecting and quantifying the degree of sensitization l

in stainless steel piping.

I.

Continued evaluation and vtrification of leak before break concept.

J.

Evaluation and implementation of leakage detection capability to improve early detection of small leaks.

1736 317 s

u APPENDIX A i

I TASK A-42 1

PIPE CRACKS IN BOILING WATER REACTORS Lead NRR Organization:

Division of Operating Reactors (DOR)

Lead Supervisor:

L. C. Shao, Acting Assistant Director for Engineering Programs Task Manager:

C. Y. Cheng, DOR:EB Applicability:

General Electric Boiling Water Reactors Projected Completion Date:

December 1979 i

t t

1736 318 A-1

1.

DESCRIPTION 07 PROBLEM Leaks and cracks in the heat-affected zones (HAZs) of welds that jo'in austenitic stainless steel piping and associated components in BWRs have been observed since mid-1960s.

Prior to September 1974, all affected piping was Type 304 stainless steel with diameters of eight inches or less.

All the cracks were attributed to intergranular stress corrosion cracking (IGSCC) due to the combination of high local stress, sensitization of material, and high oxygen content in the water.

During the last quarter of 1974, a number of incidents of IGSCC in weld HAZs of 4-inch diameter recirculation bypass lines and in 10-inch diameter core spray lines were again observed.

Following these occurrences, the NRC formed a Pipe Cracking Study Group (PCSG) to (a) investigate the cause of cracks, (b) make an interim recommendation for operating plants, and (c) recommend corrective actions to be taken by future plants.

The stucy Group published its report (NUREG-75/067) in October 1975 which contains several recommendations to reduce the incidence of IGSCC in sensitized stainless steel piping.

Following staff review of the Study Group's recommendations, the staff issued an inplementation document (NUREG-0313) which established staff positions consistent with the recomendations of the Study Group.

The staff has been in the process of implementing these positions over the last couple of years for operating plants and for plants under review for an operating license.

Since 1975, IGSCC has continued to be found in recirculation bypass and core spray lines.

Incidents of IGSCC have also been observed in some stainless steel recirculation riser piping up to twelve inches in diameter and in large diameter (>20 inches) recirculation piping in foreign countries.

Cracks in these large recirculation lines had not been observed prior to 1975.

These incidents, together with the reported questions concerning the reliability of ultrasonic inspections (UT), led to the activation of a new PCSG by NRC in September 1978.

The new Study Group was specifically chartered to reexamine the conclusions and recommendations of the 1975 PCSG report in view of cracks recently discovered in large diameter pipes.

Particular attention was given to the significance of cracking found in large recirculation lines, to evaluate the capability of nondestructive examination (NDE) methods to detect IGSCC and, in addition, to assess the significance of the safe-end cracking at Duane Arnold relative to similar material and design aspects at other facilities.

The 1978 Study Group completed its evaluation and published the NUREG-0531 report in February 1979.

The most important finding of this investigation was that the conclusions and recommendations reached in NUREG-75/067 by the previous PCSG and the implementation document, NUREG-03'.3, are still valid.

The present Study Group not only reaffirmed the conclusions and recommendations reached by the previous group but also presented some new ideas to reduce the potential for IGSCC based on the operating experience since 1975 and the recent pipe cracking in large diameter pipes.

In addition, the present Study Group has addressed IGSCC in safe-ends and has reached conclusions and recommendations concerning them which were not discussed by the previous Study Group.

Because of these new ideas and issues addressed by the 1978 PCSG, the implementation document NUREG-0313*needs to be updated to incorporate the latest recommendations made by the present Study Group.

-1736 319 A-2

2.

PLAN FOR PROBLEM RESOLUTION A.

Approach The problem will be resolved by identifying the new conclusions and re-commendations reached by the present PCSG by carefully studying and com-paring the conclusions and recommendations made in NUREG-75/067, NUREG-0313, and NUREG-0531.

The implementation document NUREG-0313 will then be revised to incorporate those new recommendations which can be implemented imedia tely.

For those new recomendations which will require further study before it can be implemented, a plan for establishing the staff position on each recommendation will be proposed.

B.

End Product The end product of this activity will be a NUREG report documenting the updated staff position on material selection and processing guidelines for BWR piping based on recommendations made by the present PCSG.

This report will be issued approximately in Mid-August 1979.

C.

Tasks C-1.

Revision of NUREG-0313, " Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping" Review and identification of those new conclusions and recommendations in NUREG-0531 which can be implemented immediately.

The specific effort will include updating the implementation document NUREG-0313 to incorporate these new recommendations.

This subtask will be accomplished in Mid-August 1979.

C-2.

Staff Recommendation of Follow-on Efforts to Reduce the Potential for IGSCC in BWR Piping Those conclusions and recommendations of NUREG-0531 which would require further study before the staff position can be established will be identified.

In addition, a plan for establishing such a position will be recomended.

This subtask will also be completed approximately in Mid-August 1979.

However, the technical activities for these follow-on efforts will definitely not be completed within the time span specified for this activity.

3.

BASIS FOR CONTINUED PLANT OPERATION AND LICENSING PENDING COMPLETION OF For new plants or plants under construction and operating plants, we have conclud-ed that, pending completion of this task, continued plant cperation and licensing do not constitute an undue risk to the health and safety of the public for the following reasons:

Although the augmented inservice inspection programs required by NRC cannot detect all IGSCC, it has demonstrated to be effective in locating most instances of IGSCC prior to cracks propagating through.the wall.

A-3 1736 320

The leak detection system employed as a monitoring system has bee-effective in alerting the plant operators of primary system leakage that could result from a through-wall crack.

Sudden failure or significant loss-cf-coolant is not expected from through-wall cracks prior to a period of leakage.

Should a large through-wall crack develop, go undetected by NDE inspections, and by continuous leak detection devices, and subse-quently should a rupture of the line occur causing a loss-of-coolant accident, the design of a nuclear power plant is such that protection is still provided for the public health and safety.

To summarize, the various NRC actions taken to date ensure that IGSCC does not pose an immediate safety problem to operating plants and thus constitute an acceptable basis for continued plant operation and licensing.

4.

NRC TECHNICAL ORGANIZATION INVOLVED A.

Engineering Branch (EB), Division of Operating Reactors, has the oyerall lead responsibility to see this TAP to its completion.

This includes review and evaluation of the subject NUREG reports to establish the implementation guidelines with particular emphasis on operating plants, and final issuance of a NUREG report.

In addition, EB will have the lead responsibility of identifying long-term follow-on efforts and recommending plans for establish-ing the implementing guidelines for thise issues.

Manpower Estimates: 4 man-months FY 1979 B.

Materials Engineering Branch (MTEB), Division of Systems Safety, has the lead responsibility of establishing the implementation guidelines for new plants and plants under construction.

MTEB will have direct input to the revision of NUREG-0313.

MTEB will also identify long-term follow-on efforts and recomrnend plans for establishing staff position on these issues.

Manpower Estimates: 3.5 Man-Months FY 1979 5.

TECHNICAL ASSISTANCE No technical assistance is needed for the present tasks.

However, technical assistance may be required for the identified follow-on efforts.

6.

ASSISTANCE REQUIREMENTS FROM OTHER NRC 0FFICES No assistance from other NRC offices is required for Subtasks C-1 and C-2.

However, some assistance may be needed for the follow-on efforts identified under Subtask C-2.

All research and developmental programs aiming to increase or maintain the integrity of BWRs piping will definitely assist us in establishing the implementation guidelines for the follow-on efforts, Specifically, A.

Office of Standards Development Structures and Components Standards Branch / DES is currently funding EG&G to develop a Regulatory Guide on "UT of Austenitic Stainless Steel Piping."

jJ36 32]

A-4

This guide will provide a UT performance standard or procedure which will significantly increase the detection capability for IGSCC in austenitic stainless steel piping.

B.

Office of Nuclear Regulatory Research Metallurgy and Materials Branch /RES is currently funding the Pacific Northwe Laboratories to study the " Reliability of Non-destructive Examination" aimed to pinpoint the strengths and weaknesses of NDE and recomend the appropriate experimental programs to increase the reliability of flaw detec-tion.

7.

INTERACTIONS WITH OUTSIDE ORGANIZATIONS No major interactions with outside organizations are anticipated for the subtask However, an extensive interaction with outside organizations will be necess for the follow-on efforts.

licensee, GE, industry research institutes, and national labs that a in research and development of methods to reduce the potential for IGSCC or to detect the occurrence of IGSCC.

and inspection organizations is also expected.An information exchange with foreign r 8.

POTENTIAL PROBLEMS No difficulties have been anticipated in achieving this task.

because of the long-term nature of the problem and the interactions with other organizations.

s 1736 322 A-5

i D n [/ g NOTICES gU 14655 yD@l$30 N,L

{

APPENDIX 8 NRC NOTICE IN THE FEDERAL REGISTER REQUESTING PUBLIC COMMENT ON NUREG - 0531

[7590-01-M]

DOMISTic LICEN5tNG CF PRODUCTION AND UTILtI.ATION FACIUTIES lavest;getion end EveWeien af Stess Certeslen Csecking la riping of Light Weter reacter rs.nts AGENCY: U.S. Nuclear Regulatory Commission.

ACTION: Request for public comment on NUREG-0531 " Investigation and Evaluation of Stress Corrosion Crack.

ing in Piping of Light Water Reactor Plants" February 1979.

SUMMARY

On September 14. 1978, the Nuclear Regulatory Commission established a new Pipe Crack Study Group. The Group was to evaluate recent pipe and safe end cracking ex.

perience relatise to previous staff con.

clusions and recommencations. The NRC seeks public comment en the repcrt which summarizes the Group's review and conclusions.

DATES: The public co. ment period exp:res May 15.1979.

POR FURTHER INPORMATION CONTACT:

D: rr ell G. Eisenhut. Deputy Direc.

ter fcr Operating Reacters, Dnision f t:f L AL R EG!$1Et, VOL 44, NO. 5*

TUE5D AY MARCH 13.1979 1736 323 B-1

_m.

MSS 5 NOTICES O

D g[D

\\

n<

0 l

of Operating Rearte-s. Offlee of Nu.

e Pipe Configuration and Stress I

clear Reacter Regulation. U.S. Nu.

24vels b

clear Regulatory Comm!ssion. Wash-e Duane Arnold Safe-End Cracking ington, D C. 20555. (Phone: 301-492 e Methods of Detecting Cracks 72:1) e Significance of Cracks SUPPIr4ENTARY INFORMATION:

tion of IG b Contr 1 d De In 1975, a Pipe Cracking Study Group s u established by the United States The review of these toples in the context of changes occurring since the Nuclear Regulatery Commissten preparation of NUREG-75/067 led to (USNRC) to review intergranular the preparation of specific conclusions stress corToalon crack!ng (!GSCC) In and recomrnendations relevant to the Boi!!ng Water Reactors (BWRs). De current status of IGSCC. the signiff-Group reported its findings eencern-cance of the problem, and the reliabil-trg stress <orrosion cracking in by pass Ity of detection and measures available lines and core spray piping of austen-to correct or minimize ICSCC in exist.

Lic stainless steel in a repcrt. Techni-Ing and future p!tnts. These conclu-ref Repo-1-Intestigation cnd Euctua-slons and recommendat!ons are pre-tien of Crceking in Austenitic Stann*

sented Ln the nes'ly issued PCSG less Steel Pxping cf Botling it'ater Re-7,pn7t, cef o r plc n t.s (NUR EG-75/ 067).

The NRC staff will teriew the Study During 1978. IGSCC was reported Group report and its concluslorJ/ree-fcr the first time in large-diameter ommendations and the public com-p! ping in a BWR. This discovery, to-ments received during this comment gether with cuest!cns conceming the period. Following this review. the staff capability of ultrasonic deteetton alll decide what further actions !!

r:ethods to detect s:nall cracks, led to a.ny, are requi. red for the lleensing and the format!on of a new Pipe Crsck operatton of reactors.

Study Group (PCSG) by USNRC on Requests for a single copy of the September 14.1978, report should be rnade in writing to The charter of the new PCSG was to U.S. Nuclear R~egulatory Commission, specifica.!!y address the ihe folloMng Washington. D.C. 20555. Attentlere Di-questions:

rector. D! vision of Techn.! cal IrJorTea-

    • 1. The significance of the cracks ties and Document Control.

d scovered in ! A.ge-diameter pipes rel-Cers:sents on this report should be atn e to the conclusiens e.nd recom. sent to the Off!ce of Nuclear Reactor mendations set forth in the referrneed Regulation. U.S. Nuclear Regulatory report (NUREG-75/067) and its imple-Commission. Wa.shington. D.C. 20555 mentation document. NUREG-0313:

Attention: Duputy Director. D! vision

2. Resolution of the concerns raised cf Operating Reactors. ne ecmment oser the ab!hty to use ultrasonic tech. period expires May 15,1979. Coples of n: ques to detect tracks in austenitic all comments rece!ved will be available stainless steel:

for exam! nation in the Comrn!ssion's

3. The sign!ficance of cracks found Public Document Room. 1717 H in large4ameter sensitized safe ends Street. N.W Washington. D.C.

and a.ny recom.rnendations rega.rding Dated at Bethesda Md, this 6th day the current NRC prog tm for dealing of Marth.1979.

.T po ert al for stress corrosion Por the Nuclea.r Regulatory Com-0""

eracking in PWRs:

5. Examine the significance of crack.

Vscrom Srz:.s.o.Jr ing in the Inconel safe ends that has Director, Division of Operating been experienced at the Duane Arnold Recetors. O// Ice c/ Nuclecr Re-Operating Paci!!!y. and develop any ccior Reru.!affon.

recomrnendations regarding NRC se-IFR Doc. 79-nos Fwd 3-12-ts. sas am!

tions taken or to be taken."

The PCSG limJted the scope of the study to BWR and PWR pfping and safe ends attached to the reactor pres-sure vessel. The PCSG reviewed exist-ing information-eit her that contained wr tten records (>r that collected Meuch r:eetings in this country and

. fere:g. countries The specific areas

en.s:dered are presei.ted in the chap-

'ers cf

  • h:s report:

eSWR Cra n.ng Esperience and 2:rrect e A:Ucr.s ePWR CrsNng Experience and 17 k

2 ce:.e A:::cns e~

n -d -h w

.3 r.;

e RM. r Cc0Mnt Cher-istry PEetaAt El-clsTER VOL 44, NO. 30-TUEseAY, match 13,1979 B-2

APPENDIX C

SUMMARY

OF PUBLIC COMMENTS ON NUREG-0531 In response to NRC's request, comments on NUREG-0531, " Investigation and Evalua-tion of Stress-Corrosion Cracking in Piping of Light Water Reactor Plants" from the following six organizations and individuals were received.

Their substantive comments are summarized below:

A.

General Electric Company 1.

The use of regular grades of Type 304 and 316 stainless steel in BWR piping systems should be avoided unless carbon centent is restricted to 0.35% or less.

If regular grades without special carbon restric-tions are used, steps should be taken to ensure that IGSCC cannot Such measures may include non-welded applications, solution occur.

annealing, weld cladding, or other measures that have been adequately tested to provide reasonable aasurance of reliable performance during the life of the plant.

(paragraph 4.8) i 2.

The use of IHSI on existing plant welds raises some areas for futher investigation.

The effect of the treatment on existing cracks should b,e determined, as well as any effets of the thermomechanical IHSI cycle.

1736 325 C-1

It is recognized that IH5I provides residual stress reduction in piping of all diameters.

GE-EPRI has planned tests to determine the extent of benefit to be derived from IH5I.

(paragraph 10.5.1) 3.

It is recommended that the recommendations contained in NUREG-0313 continue to be considered for operating plants and plants under review for an operating license or construction permit.

On a case by case basis plans should be developed for in-service inspection which would improve the probability of early crack identification.

These plans should consider differences in stress, carbon content, degree of material sensitization and the frequency of past cracking incidents in other plants as well as other factors related to plant operation and inspection history.

(paragraph 2.11) 4.

Based on the incidence of IGSCC in recirculation-riser piping in the offshore plants, it is recommended that an augmented in-service inspection program considering the above factors be developed for these lines.

(paragraph 2.11) 5.

Further clarification is requested on the second recommendation relative to safe ends on reactor pressure vessels.

General Electric considers that special inspections of uncreviced safe-ends with tur.i g fork designs are not warranted.

(p. 7.4) 6.

To ensure that General Electric is aware of the complete list of NRC icentified field cracking incidents in piping, it is requested that C-2 1736 426

i l

a detailed list be provided of these incidents by plant and line type.

(p. 2.1) i B.

Washington Public Power Supply System (WPPSS) 1.

WPPSS questions whether there is sufficient experience to warrant placing the riser lines in the service sensitive category.

It only requires one minor extension of this logic to place the whole system in this category.

(paragraph 2.11) 2.

Fabrication of Materials-WPPSS feels that more discussion is warrant on the merits and adequacy of ASTM A-262 for acceptance of materials used in environments conducive to stress corrosion cracking.

By using the techniques in ASTM A-262, are we possibly accepting material which is partially sensitized prior to welding?

(paragraph 4.2.3)

C.

Combustion Engineering - Power Systems 1.

There appears to be an error in the specification for Boron concen-trations in Table 5.2, " Summary of PWR Reactor Coolant Chemistry Specifications".

The correct refueling boron concentration should be < 4400 ppm.

1736 327 C-3

D.

Carolina Power and Light Company 1.

There is not sufficient justification for reclassifying the recir-culation - riser piping as nonconforming, service sensitive line.

(Recommendation 2.11.1) 2.

It is not practical to require utilities to reclassify their welded attachments as nonconforming, service sensitive lines.

The welds, in most cases, do not have configurations that will allow ultrasonic inspections.

(Recommendation 7.4.1)

E.

Lawrence Livermore Laboratory 1.

Long term effects of redistribution of stress must be considered when any heating and cooling cycle is superimposed on an existing welding process.

There is the possibility that cracks that occur could propagate without arrest because of the new stress distribution created by IHSI.

(p. 10.4) 2.

The report does not state how the results of A262 A and E compare with the lots of stainless steel which have experienced IGSCC in the BWR environment.

There should be more discussion of electrochemical potentiokinetic reactivation technique (p. 4.3).

3.

Since the critical level of sensitization is probably a critical level of chromium depletion around the carbidas, measuresments which C-4

}[3b 32b

l emphasize these critical parameters should be the basis of regulatory requirements.

(p. 4.4) 4.

Further study is needed on the role of residual stress distribution on crack growth.

The residual stress distribution in circumferential welds tends to promote cracking all around the circumference.

As the crack extends around a significant portion of the inside wall, the residual stresses in the axial direction should increase and accelerate the crack growth.

(p. 6.4) 5.

The tearing modulus concept appears to be still at a research level.

A major comprehensive study of this topic appears to be justified.

(p. 9.1) i l

6.

The relation of leakage rate to crack size should be studied relative to its usage as a criterion for crack detection.

(p. 8.f) 7.

The 3-D presentation of internal defects by acoustical holography certainly warrants consideration as a complementary te-bnique to ultrasonic testing.

F.

Southwest Research Institute (SWRI) 1.

SWRI agrees with Conclusions 1, 2, 3, and 4 of Chapter 8.

However, it should be noted that sizing is not as important as the detection 1736 329 C-5

of IGSCC.

Once a reflector is identified as IGSCC, the area must be repaired under present requirements.

Therefore, there is no need to size the cracts at this time.

(p. 8.7) 2.

It is not SWRI's opinion that all reflectors observed within the HAZ should be classified as IGSCC.

However, all crack-like indications within the HAZ of suspect austenitic welds should be classified as IGSCC.

(p. 8.7) 3.

The technique mentioned in Recommendation 2 of Chapter 8 may serve to reduce radiation exposure.

However, it does nothing to improve the technical adequacy or credibility of the examination.

In fact, this approach may, at times, reduce the adequacy of the examination.

It should be noted that automatic recording and analysis of signal response and positional data for manual examinations will, in the near future, provide improved examinations while reducing radiation exposure to examination personnel.

(p. 8.7) 1736 330 C-6

..~ -

' f,Nc aCau 335 u.s. NUCLE AR REGUL ATORY COMMISSION BIBLIOGRAPHIC DATA SHEET NUREG-0313 Rev. 1 4 TITLE AND SUBTITLE IAad Volume No.. #/approonstel

2. (Leave clank /

Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping 3 RECIPIENT'S ACCESSION NO.

7. AUTHOR G)
5. D ATE REPORT COMPLE TED C. Y. Cheng, R. M. Gamble, A. Taboada, B. Turovlin l YEAR M ON TH August 1979
9. PE RFORMING ORGANIZATION NAME AND M AILING ADDRESS //nclude 2,0 Code /

DATE REPORT ISSUED U. S. Nuclear Regulatory Commission

  • 0 NTH lvE4a Office of Nuclear Reactor Regulation October 1979 Washington, D.C.

20555 6 (Lee e olen*/

8 (Leave blank /

12. SPONSORING ORG ANIZ A'elON N AME AND MAILING ADDRESS (/nclude les Codel
10. PROJE CT/ TASK / WORK UNIT NO
11. CONTR ACT NO.
13. TYPE OF REPORT PE RIOD, COV E RE D //nclus've dates /

Technical Report

15. SUPPLEMENTARY NOTES
14. (Le,,e e/,on/
16. ABSTR ACT 000 words or less}

This report updates and supercedes the NRC technical positions established in NUREG-0313, " Technical Report on Material Sclection and Processing Guidelines for BWR Coolant Pressure Boundary Piping," published in July 1977.

This report sets forth the NRC staff's revised acceptable methods to reduce the intergranular stress corrosion cracking susceptibility of BWR ASME Code Class 1 & 2 pressure boundary piping and safe end.

For plants that cannot fully comply with the material selection, testing, and processing guidelines of this document, varying degrees of augmented inservice inspection and leak detection requirements are presented.

?

7. KEY WORDS AND DOCUMENT ANALYSIS 1

17a DESCRIPTORS 1736 331 176. ICENTIFIE RS OPEN ENDE D TERMS 18 AVAILABIL8TY ST ATEMENT

19. SE CURITY CLASS (This reporr/

21 NO OF PAGES Unlimited Availability 2o SECuRin CL ASS (T/us pawl 22 PRICE Cac rOau ass o.778

,