IE Insp Repts 50-454/79-16 & 50-455/79-16 on 791023-25. Noncompliance Noted:Inadequate Procedure Re Observation of Welding Activities in Unit 1
ML19211A753
Person / Time
Site: Byron  Constellation icon.png
Issue date: 11/06/1979
From: Danielson D, Eric Lee
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19211A744 List:
References
50-454-79-16, 50-455-79-16, NUDOCS 7912200589
Download: ML19211A753 (6)


See also: IR 05000454/1979016

Text

.

U.S. NUCLEAR REGULATORY COMMISSION

.

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report Nos. 454/79-16; 455/79-16

Docket Nos. 50-454; 50-455

Iicense Nos. CPPR-130; CPPR-131

Licensee: Commonwealth Edison Company

P.O. Box 767

Chicago, IL 60690

Facility Name: Byron Station, Units 1 and 2

Inspection At: Byron Site, Byron, Illinois

Inspection Conducted: October 23-25, 1979

/}.I h

"/'NY

Inspector: E. W. K. Lee

Approved by: D. H. Danielson, Chief

[77b <""> ' o T'

'"

'

'

-

Engineering Support Section 2

Inspection Summary: Inspection on October 23-25, 1979 (Reports Nos.

50-454/79-16; 50-455/79-16)

Areas Inspected: Reactor Coolant Pressure Boundary and Safety Related

Piping work activity and welding; quality records and procedures. The

inspection involved a total of 20 inspector hours on site by one NRC

inspector.

Results: Of the six areas inspected, no apparent items of noncompliance

or deviation were identified in five areas, one apparent item of noncom-

pliance was identified in one area (infraction - inadequate procedure,

paragraph 3a).

.

1630

22

7 E12200 5 [f

.

.

DETAILS

.

Persons Contacted

Principal Licensee Employees

  • S. T. Forsha, Structure QA Coordinator
  • T. McIntire, QA Supervisor
  • J. Porter, Mechanical QA Coordinator
  • G. Sorenson, Project Superintendent
  • M. Stanish, QA Engineer
  • R. Tuetkin, Lead Mechanical Engineer

Hunter Corporation

  • J. H. Robertson, Welding Engineer
  • M. Somsag, QA Supervisor

The inspector also contacted and interviewed other licensee and contractor

personnel, including area superintendents and craftsmen.

  • Denotes those present at the exit interview.

Licensee Action on Previous Inspection Findings

,

(Closed) Noncompliance Item (454/79-02-02; 455/79-02-01) - Control of

welding material: The inspector reviewed the randomly selected weld

material issuance slips and determined that returned unused materials

wer' marked on the slips.

(Closed) Unresolved Item (454/79-12-01; 455/79-12-01) - Pipe storage: The

inspector reviewed the pipe storage surveillance report which indicated

that the storage conditions were corrected.

(Closed) Noncompliance Item (454/79-12-01) - Weld data sheet hold point:

The inspector reviewed the nonconformance report and determined it was

properly closed.

(Closed) Noncompliance Item (454/79-12-03; 455/79-12-02) - Control of

Document: The inspector verified that the procedure supplements have

been redistributed. The revised procedure was also reviewed.

Functional or Program Areas Inspected

1.

Peactor Coolant Pressure Boundary Piping - Observation of

Work and Work Activities (Unit 1)

The inspector observed weld end preparation of Safety Injection

System weld No. 122 on Isometric Drawing No. SI-6 and Spool No. SI-1

1630

23

-2-

.

on Isometric Drawing No. SI-1-4. It was determined that work activities

were performed in accordance with the applicable procedures and good

a

construction practices were adhered to.

No items of noncompliance or deviations were identified.

2.

Reactor Coolant Pressure Boundary Piping - Review of Quality Records

The inspector reviewed the Westinghouse Corporation Quality

a.

Release, ASME data Report and Receiving Inspection Report for

the following piping spools:

(1) QR No. 35627 for spool No. CBE-Loop-1-6

(2) QR No. 35628 for spool No. CBE-Loop-2-1

(3) QR No. 35630 for spool No. CBE-Loop-2-6

(4) QR No. 31246 for spool No. CAE-Loop-2-1

(5) QR No. 31244 for spool No. CAE-Loop-3 f

(6) QR No. 35633 for spool No. CBE-Loop-3-6

(7) QR No. 35634 for spool No. CBE-Loop-4-1

(8) QR No. 35635 for spool No. CBE-Loop-4-6

-

It was determined that the documents are legible and acceptable.

b.

The inspector reviewed the pipe storage inspection records for

the period between February 1978, and August 1979. It was

determined that (1) the records are difficult to retrieve; (2)

inspection was performed at the required frequency and (3)

storage requirements were met.

The inspector reviewed the following CECO audit reports:

c.

(1) CECO Audit Reports No. 6-79-201, No. 6-79-215, No. 6-79-180

and No. 6-78-160.

(2) CECO reports of audit performed at Westinghouse Corporation,

Monroeville for years 1977, 1978.

It was determined that the records are acceptable and findings

were closed out in a timely manner. However, the audits at

Westinghouse were performed by CECO home office personnel hence

not all the supporting documents, such as follow-up actions,

checklists used during the audits, were available on site. The

licensee stated those documents can be made available, including

the 1979 audit report, on site. This matter is considered unre-

1630

324

-3-

.

solved pending a review during a subsequent inspection.

(454/79-16-01)

>

No items of noncompliance or deviations were identified.

3.

Reactor Coolant Pressure Boundary Piping - Observation of

Welding Activities (Unit 1)

The inspector observed the followlag welding activities:

a.

(1) Reactor Coolant System, Weld No. 219 on isometric drawing

No. RC-1-1, Welds No. 82 and 83 on isometric drawing

No. RC-1

(2) Safety Injection System, Weld No. 109 on isometric drawing

No.

SI-1.

It was determined that (1) work was conducted in accordince

with traveler; (2) proper welding materials were used; (3)

welding procedure requirements were met; (4) work area was free

of welding rod-stubs; (5) physical appearance was acceptable

and (6) weld end detail for weld No. 219 on isometric drawing

No. RC-1-1 was not specified and accepted by QC inspector based

on no acceptance criteria. This condition is an item of noncom-

pliance identified in Appendix A. (454/79-16-02)

b.

The inspector observed liquid penetrant examination of Safety

.

Injection System, Weld No. 141 on isometric drawing No. SI-5

and weld No. 111 on isometric drawing No. SI-1. It was determined

that: (1) surface condition was acceptable; (2) procedure

requirements were met and (3) personnel were properly qualified.

Except as noted, no items of noncompliance or deviations were identified.

4.

Reactor Coolant Pressure Boundary and Safety Related Piping -

Welding Material Control (Units 1 and 2)

a.

Review of Documents

(1) The inspector established that Hunter Corporation procedure

for welding material control has not been revised since

the last review (IE inspection Reports No. 50-454/79-12

and No. 50-455/79-12, paragraph 3a) except procedure

No. 5.101. The current revision of this procedure is

revision 6. The revision was reviewed.

(2) Receiving Inspection Report, Material Certification and

Purchase Order for ER 308L welding rod with heats No. 741403

and No. 741573 and ERNicr-3 welding rod with heats No. 762453

and No. 760460.

1630 325

-4-

.

It was determined that the above documents met the PSAR, 10 CFR

,

50, Appendix B and the applicable code requirements.

b.

Control of Materials

The inspector toured welding material issuing stations No. 3

and No. 5. It was determined that (1) the welding materials are

properly identified and segregated; (2) the temperature of the

rod oven is maintained; (3) records are properly kept; and (4)

issuance and return of welding materials are controlled in

accordance with approved procedures.

No items of noncompliance or deviations were identified.

5.

Reactor Coolant Pressure Boundary and Safety Related Piping -

Welder Qualification (Unit 1)

The inspector reviewed the following documents:

Ilunter Corporation Site Implementing Procedure No. 5-301,

a.

Revision 6, " Welder Qualification."

b.

Qualification records of welders who performed welding of welds

identified in paragraphs 3a and 7 of this report).

The inspector determined that the above documents met the requirements of

,

ASME B & PV Code Section IX.

No items of noncompliance or deviations were identified.

6.

Safety Related Piping - Observation of Work and Work Activities

(Unit 1)

The inspector observed weld end preparation of Safety Injection System,

Spool No. SI-13-10 on isometric drawing No. SI-13. It was determined

that work activities were performed in accordance with the applicable

procedures and good construction practices were adhered to.

No items of noncompliance or deviations were identified.

7.

Safety Related Piping - Observation of Welding' Activities

(Unit 1)

The inspector observed the following welding activities:

Component Cooling Water System, Weld No. 689 on isometric drawing

a.

No. CC-48, Weld No. 28B on isometric drawing No. CC-1 and Weld

No. 93 on isometric drawing No. CC-5.

b.

Containment Spray System, weld No. 282 on isometric drawing

No. CS-23.

1630 326

-5-

.

c.

Residual Heat Removal System, weld No. 181 on isometric No. RH-7.

,

d.

Safety Injection System, Weld No. 342 on isometric drawing

No. SI-13-13

It was determined that (1) work was conducted in accordance with

traveler; (2) proper welding materials were used; (3) welding proce-

dure requirements were met; (4) work area was free of weld rod-stubs;

(5) physical appearance was aedeptable and (6) weld No. 28B on

isometric drawing No. CC-1 was rejected by the QC inspector because

of bad fit-up.

Unresolved Items

Unresolved items are matters about which more information is required in

order to ascertain whether they are acceptable items, items of noncompliance,

or deviations. Unresolved items disclosed during the inspection are discussed

in paragraph 2c.

Exit Interview

The inspector met with licensee representatives (denoted under Persons

Contacted) at the conclusion of the inspection on October 25, 1979. The

inspector summarized the purpose and findings of the inspection. The

licensee acknowledged the findings reported herein.

.