UNITED STATES NUCLEAR REGULATORY COMMISSION y
g WASHINGTON, D. C. 20555 g
p
- g
/
November 28, 1979 Docket No. 50-346 Mr. Lowell E. Roe, Vice-President Facilities Development Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, Ohio 43652
Dear Mr. Roe:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION - TECHNICAL SPECIFICATION CHANGES We have reviewed your submittals dated March 23 and July 13, 1979, concerning your requests for amendments and Technical Specification changes to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No.
1.
In order to complete our review, we need additional information. You are requested to provide responses to the enclosed request for additional information within 30 days of receipt of this letter. This information has been previously discussed with your Mr. Fred Miller.
Sincerely, J
obert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors
Enclosure:
As stated cc w/ enclosure:
See next page 1597 291 79unso ilI 3
I Toledo Edison Company cc w/ enclosure (s):
Mr. Donald H. Hauser, Esq.
Director, Technical Assessment The Cleveland Electric Division Illuminating Company Office of Radiation Programs P. O. Box 5000 (AW-459)
Cleveland, Ohio 44101 U. S. Environmental Protection Agency
~
Crystal Mall #2 Gerald Charnoff, Esq.
Arlington, Virginia 20460 Shaw, Pittman, Potts and Trowbridge U. S. Environmental Protection Agency 1800 M Street, N.W.
Federal Activities Branch Washington, D.C.
20036 Region V Office ATTN:
EIS C0ORDINATOR Leslie Henry, Esq.
230 South Dearborn Street Fuller, Seney, Henry and Hodge Chicago, Illinois 60604 300 Madison Avenue Toledo, Ohio 43604 Mr. Robert B. Borsum Babcock & Wilcox Ohio Department of Health Nuclear Power Generation Division ATTN: Director of Health Suite 420, 7735 Old Georgetown Road 450 East Town Street Bethesda, Maryland 20014 Columbus, Ohio 43216 President, Board of County Cor:r11ssioners of Ottawa County 1597 292 Port Clinton, Ohio 43452 Attorney General Department of Attorney General 30 East Broad Street Columbus, Ohio 43215 Harold Kahn, Staff Scientist Power Siting Commission 361 East Broad Street Columbus, Onio 43216 fir, Rick Jagger Industrial Commission State of Ohio 2323 ' dest 5th Avenue Colurbus, Ohio 43216 fir. Ted 'iyers Licersing Engineer Toledo Edison Company Edison Dlaza 300 "acisen Avenue Tole :. Onio 43652 P00R BRIGINU
me
~ -. ~ ww -
,y 5 m.
V -
y,
_w.
Enclosure i
Davis Besse Unit 1 m
Docket Number 50-346
(
Request for Additional Infomation Concerning Technical Specification Changes 5
k 1.
Anticipated Reactor Trip - Provide a Technical Specification for the proposed number of acceptable scrams in Table 5.7-1 which addresses the anticipated reactor trips.
2.
RC Seal Injection Alignment - Discussions with B. J. Pumps indicate that f
they feel there is no need for RC seal injection, provided component cooling water flow and temperature are maintained at a satisfactory level. Justify why you feel seal injection is required. Discuss the safety need to maintain these lines in a open condition.
3.
p0RV Operation,,The proposed Technical Specifications do not address station ope' ration with the electromatic relief isolation valve closed or the electromatic relief valve (PORV) otherwise inoperable. In this regard, include reporting requirements in Section 6.9.2 for a special report on the status of a PORY which has been inoperable or isolated for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when in modes 1, 2, or 3.
This report is to be prepared and sub-mitted to the staff within 10 days of PORV inoperability lasting more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
4.
Auxiliary Feedwater Surveillance Requirement - Your surveillance requirements do not include monthly verification for valves in the flow path that are locked, sealed, or otherwise secured in position. Revise your requirements to include a monthly check of these valves to ensure they are locked, sealed, or otherwise secured in their proper position.
5.
Makeup Pump Termination - Provide a list of transients and accidents in the Davis Besse FSAR which currently take credit for the operation of the pressurizer heaters. Assuming the requested Technical Specification change in the makeup pump trip set point is granted by the staff, which l
transients or accidents would still have sufficient pressurizer water L
level displacement to produce a pressurizer heater trip? Propose Technical i
P00R.OR8NAL
"" ~
i597 293
___m..
Specifications for the pressurizer heaters for those modes where credit is taken for the heaters in accident analyses.
6.
Anticipated Trip Testing - Provide appropriate minimum response times for the functional units of Table 4.3-15 and commit to do response time testing at each refueling.
7.
Anticipated Trid Testing - Provide the bases for the bypass set point (15% for turbine trip) for the anticipated reactor trip of Table 3.3-15.
8.
Channel Operability Requirements - Change the action statements 16 and 17 of Table 3.3-15 te "With th6 number of channels OPERABLE one less than required by the minimum channels Operable requirements, be in'at least HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />."
~
1597 294 O