ML19211A369
| ML19211A369 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/07/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19211A370 | List: |
| References | |
| NUDOCS 7912180114 | |
| Download: ML19211A369 (2) | |
See also: IR 05000302/1979043
Text
{{#Wiki_filter:[D neo [ o UNITED STATES g ! NUCLEAR REGULATORY COMMISSION o 3 E REGION 11 4 ., % * * * * * [[ ' 101 MARIETTA ST., N.W., SUITE 3100 o ATLANTA, GEORGIA 30303 NOV 0 71973 In Reply Refer To: RII:AHJ 50-302/79-43 Florida Power Corporation ATTN: W. P. Stewart, Manager Nuclear Operations - P. O. Box 14042, Mail Stop C-4 St. Petersburg, FL 33733 Gentlemen: This refers to the inspection conducted by A. H. Johnson of this office on October 9-12, 1979, of activities authorized by NRC Operating License No. DPR-72 for the Crystal River facility, and to the discussion of our findings held with G. P. Beatty, Jr. , at the conclusion of the inspection. Arets examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. Within the scope of this inspection, no items of noncompliance were disclosed. InaccordancewithSection2.790oftheNRC's"RulesofPractice", Pare 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the applicatica is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room. Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, ll C /b.- - R. C. Lewis, Acting Chief Reactor Operations and Nuclear Support Branch Enclosure: See Page 2 1607 294 7912180 /h
NOV 0 71979 . Florida Power Corporation -2- , Enclosure: Inspection Report No. 50-302/79-43 cc w/ encl: G. P. Beatty, Jr. Plant Superintendent P. O. Box 1240 Crystal River, FL 32629 - 1607 295 }}