SPECIAL REPORT NO. 79-03 INTRODUCTION LACBWR Technical Specifications, Section 4.2.2.22, Action g, requires sampling and analysis for Iodine-131, -133, and -135, as well as gross beta and gamma activity between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> following a thermal power change of greater than 15% of rated thermal power within one hour.
This special report is required to contain the information determined by the analysis plus additional information regarding reactor power history, fuel burnup, cleanup flow history, off-gas activity levels and gross alpha activity levels.
SECTION 1 A reactor scram occurred at 0946 hours0.0109 days <br />0.263 hours <br />0.00156 weeks <br />3.59953e-4 months <br /> on September 28, 1979, due to a scram solenoid burning out on CRD No. 10.
A failed seal in 10 led to water the upper control rod drive mechanism for CRD No.
dripping onto the scram solenoid, which caused it to burn out, resulting in a partial scram.
The reactor was operating at 93%
of rated thermal power (44 MWe) at the time of the scram.
GROSS Sy ACTIVITY AND IODINE ANALYSIS Time of Sample:
1515, 9/28/79 Sample Results:
Gross Sy------ 7. 01 x 10- 1 pCi/ gram 1 1 31 --------- l. 811 x 10- 3 pCi/ gram I l 3 3--
l. 5 x 10 2 pCi/ gram I 13 5------ --- l. 3 8 8 x 10- 2 pCi/ gram ADDITIONAL INFORMATION Reactor Thermal Power Level starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the (1) thermal power change:
0900, 9/26/79 - 0946, 9/28/79 93%
(2)
The appropriate fuel burnup of assemblies in a symmetrical core region is depicted in Figure 1.
(3)
Cleanup Flow History starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the thermal power change:
1 Primary Purification Flow Rate 0900, 9/26/79 - 0946, 9/28/79 40 gpm l
Primary Purification Decontamination Factors (8y) 0303, 9/27/79 1588:1 0047, 10/9/79 192: 1 1592 191 7 912170 2 gi?
SPECIAL REPORT NO. 79-03 (4)
Of f-Gas Activity Levels for 48 Hours Prior to Thermal Power Change:
0900-1700, 9/26/79--------------------------260.70 pCi/sec 17 0 0- 18 0 0, 9 / 2 6 / 7 9- ------------------------- 2 5 4.18 pCi/sec 1800-1900, 9/26/79--------------------------293.30 pCi/sec 1900-2000, 9/26/79--------------------------276.99 pCi/sec 2000-2100, 9/26/79--------------------------325.88 pCi/sec 2100-2200, 9/26/79--------------- ------- --358.46 pCi/sec 2200-2300, 9/26/79-------------------- -----260.70 pCi/sec 2300-2400, 9/26/79 0000-0200, 9/27/79----325.88 pCi/sec 0200-0300, 9/27/79--------------------------278.70 pCi/sec 0300-0400, 9/27/79--------------------------218.04 pCi/sec 0400-0500, 9/27/79------------- ------------223.96 pCi/sec 0500-0600, 9/27/79------------------------ -213.30 pCi/sec 0600-0700, 9/27/79------------- ------------189.60 pCi/sec 0700-0800, 9/27/79--------------------------184.86 pCi/sec 0800-0900, 9/27/79--------------------------194.10 pCi/sec 0900-1000, 9/27/79--------------------------208.92 pCi/sec 1000-1200, 9/27/79--------------------------194.34 pCi/sec 1200-1300, 9/27/79-------- --- -------------233.21 pCi/sec 1300-1400, 9/27/79---------------
189.48 pCi/sec 14 0 0- 15 0 0, 9 / 2 7 / 79-------------------------- 2 4 2. 9 2 pCi/sec 1500-1600, 9/27/79------- ------------------233.21 pCi/sec 1600-1800, 9/27/79--------------------------189.60 pCi/sec 1800-1900, 9/27/79--------------------------184.86 pCi/sec 1900-2000, 9/27/79-------------------- -----182.49 pCi/sec 2000-2100, 9/27/79--------------------------184.86 pCi/sec 210 0- 2 2 0 0, 9 / 2 7 / 7 9-- ----------------------- 18 2. 4 9 pCi/sec 2200-2400, 9/27/79 0000-0700, 9/28/79----184.86 pCi/sec 0700-0900, 9/28/79--------------------------182.49 pCi/sec 0900-0946, 9/28/79--------------------------190.12 pCi/sec (5)
Gross Alpha Acrjvity Level Starting With the Last Sample Taken Prior to che Thermal Power Change:
0303, 9/27/79---------------------------l.76 x 10-7pci/gm 0946, 9/28/79---------------------------Reactor Scram 1158, 10/1/79---------------------------4.75 x 10-7pci/gm i
1592 l92 e'
lf' SPECIAL REPORT NO. 79-03 QUARTER CORE FUEL EXPOSURE ESTIMATION (GWD/MTU)
AN INDICATION OF REGIONAL EXPOSURE AS OF SEPTEMBER 28, 1979.
THE AVERAGE EXPOSURE:
5.996 GWD/MTU.
A B
C D
E F
G H
K L
I onca g
e_ w
_ e e,
e 3
c a.
,.,=L 4
@P'3 12 ron p
5 l
l 9
QL--_7 m W 2CD 0
6 m
W z="
QG.5 4
IC' 94 7
ma n2x zw IP.-- l ll (9) f(
8 cm 2m m
on
- e, 9
2.c ?1 6 154 yovt
/ ZNd 4
/0 rs.s$
IN CORE FLUX MONITORS Q' PLANT NORTH 1592 193
?DDR ORGINAL FIGURE 1 3-I
SPECIAL REPORT NO. 79-03 SECTION 2 A reactor scram occurred at 0255 hours0.00295 days <br />0.0708 hours <br />4.21627e-4 weeks <br />9.70275e-5 months <br /> on November 9, 1979, due to an unexpected restriction in freedom of movement of the turbine-governor initial pressure regulator.
The reactor was operating at 85% of rated thermal power (42 MWe) at the time of the scram.
GROSS By ACTIVITY AND IODINE A!ALYSIS Time of Sample:
0633, 11/9/79 Sample Results:
Gross By------l.43 pCi/ gram I l 31----------l. 8 2 6 x 10- 3 pCi/ gram I l 3 3---------- l.139 x 10 - 2 pCi/ gram I 135---- --- -2.362 x 10-2 pCi/ gram ADDITIONAL INFORMATION (1)
Reactor Thermal Power Level starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the thermal power change:
0300, 11/7/79 - 0255, 11/9/79 85%
(2)
The appropriate fuel burnup of assemblies in a symmetrical core region is depicted in Figure 2.
(3)
Cleanup Flow hisotry starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the thermal power change:
Primary Purification Flow Rate 0300, 11/7/79 - 0255, 11/9/79 40 gpm Primary Purification Det.uimination Factors (BY )
0120, 11/8/79 962:1 0213, 11/12/79 861:1 1592 194 SPECIAL REPORT NO. 79-03 (4)
Of f-G. s Activity Levels for 48 Hours Prior to Thermal Power Change:
0300-1000, 11/7/79--- -----------------------207.67 pCi/sec 1000-1100, 11/7/79---------------------------210.69 pCi/sec 1100-1200, 11/7/79---------------------------207.67 pCi/sec 1200-1300, 11/7/79---------------------------210.69 pCi/sec 1300-1400, 11/7/79---------------------------207.67 pCi/sec 1400-1500, 11/7/79--------------- -----------210.69 pCi/sec 1500-1/00, 11/7/79------------------- -------207.67 pCi/sec 1700-1800, 11/7/79--- -----------------------173.12 pCi/sec 1800-1900, 11/7/79-------------
207.67 pCi/sec 1900-2200, 11/7/79---------------------------210.69 pCi/sec 2200-2400, 11/7/79 0000-0100, 11/8/79----207.67 pCi/sec 0100-0200, 11/8/79---------------------------208.01 pCi/sec 0200-0300, 11/8/79----- ---------------------166.41 pCi/sec 0300-0600, 11/8/79--------------------- -----190.23 pCi/sec 0600-0700, 11/8/79----------------- --- -----187.21 pCi/sec 0700-0800, 11/8/79----- --------- - - - -- --249.61 pCi/sec 0800-0900, 11/8/79--------- --------- - -----214.72 pCi/sec 0900-1000, 11/8/79--- -----------------------208.01 pCi/sec 1000-1100, 11/8/79----------------- ------- -249.61 pCi/sec 1100-1200, 11/8/79---------------------------253.64 pCi/sec 1200-1400, 11/8/79-------------
208.01 pCi/sec 1400-1500, 11/8/79-------- - - --------- ----253.64 pCi/sec 1500-1600, 11/8/79---------------------------286.52 pCi/sec 1600-1700, 11/8/79-------- - ----------------295.91 pCi/sec 1700-2100, 11/8/79---------------------------291.21 pCi/sec 2100-2400, 11/8/79 0000-0100, 11/9/79----249.61 pCi/sec 0100-0300, 11/9/79---- ----------------------274.22 pCi/sec (5)
Gross Alpha Activity Level Starting With the Last Sample Taken Prior to Thermal Power Change:
- 0115, 11/8/79----------------
3.53 x 10-a pCi/gm 0255, 11/9/79------------ ------- --- ----Reactor Scram 0215, 11/12 / 7 9 -------------- ------------- 3. 4 2 x 10 - 7 pCi/gm 1592 195 SPECIAL 1(EPORT NO. 79-0?
QUARTER CORE FUEL EXPOSURE ESTIMATION (GWD/MTU)
AN INDICATION OF REGIONAL EXPOSURE AS OF NOVEMBER 9, 1979.
'IHE AVERAGE EXPOSURE:
6.537 GWD/MTU.
A B
C D
E F
G H
K L
/
t__wm 2
_ /4 l' 9
/<
/T 4
3 6
7-
&C9 4
l l r3 r
e a
e i
e 1
F 5
((','
i c
ec i
e c)r cro etem 2
/3#3 6
4 j f5uq, 73
_ects.
_g;;p?se
_a ge Q3y 2 10 1.1a 7
,@l L_1[7Wng:Q)hr/
0 __J qP_._
7ur lui 8
u_hl ph v.m
~
%7 ys3 '9 4(h.a._
te.n 9
\\
a
.J lo j bd
/N CCRE FLUX MONITORS Q PLANT NORTH l592 196 FIGURE 2 P00R BRIGINAl.
'