ML19211A265

From kanterella
Jump to navigation Jump to search
Forwards Special Rept 79-03 Re Sampling & Analysis Resulting from Thermal Power Changes Greater than 15%
ML19211A265
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/07/1979
From: Linder F, Linder F
DAIRYLAND POWER COOPERATIVE, DUKE POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19211A266 List:
References
REF-GTECI-A-03, REF-GTECI-A-04, REF-GTECI-A-05, REF-GTECI-SG, TASK-A-03, TASK-A-04, TASK-A-05, TASK-A-3, TASK-A-4, TASK-A-5, TASK-OR LAC-6686, NUDOCS 7912170287
Download: ML19211A265 (2)


Text

- j/..

DAlitYLAND POWEIt COOPEIRATIVE Ba Crone, Ohcouan 54601 December 7, 1979 P00at hhlhlh In reply, please U HIMIII refer to LAC-6686 DOCKET NO. 50-409 Mr. J ame s G. Keppler, Regional Director U.

S.

Nuclear Regulatory Commission Directorate of Regulat6ry Operations Region III 799 Roosevelt Road Glen Ellyn, IL 60137

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 SPECIAL REPORT 79-03

REFERENCE:

(1)

LACBWR Technical Specifications Section 4.2.2.22, Action g.

Dear Mr. Keppler:

In accordance with the provisions of Reference (1), a Special Report is submitted covering results of sampling and analysis actions together with additional operational information for two separate occasions when reactor thermal power changed by more than 15% of rated thermal power within one hour while in Operational Condition 1 or 2.

The separate occasions are discussed in Sections as follows:

Section 1 - September 28, 1979 Section 2 - November 9, 1979 Each section provides a summary of operating data and radio-logical data for the time period prior to the thermal power change along with the results of the additional sampling required.

1592 189 791217025$P[

Mr. James G.

Keppler, Regional Director LAC-6686 U.

S. Nuclear Regulatory Commission December 7, 1979 If there are any questions cor.cerning this report, please contact us.

Very truly yours, DAIRYLAND POWER COOPERATIVE Frank Linder, General Manager FL:LSG: abs ATTACHMENTS CC:

Director, Office of Inspection and Enforcement (30)

U.

S.

Nuclear Regulatory Commission Washington, D. C.

20555 Director, Office of Management, Information, and Program Control (3)

U.

S. Nuclear Regulatory Commission Washington, D. C.

20555 BCC:

SRC E. Tremmel D.

Milos Shimshak Parkyn Boyd/Kelley/SS Raffety Angle Towsley 1592 190 Nowicki/ Gray /Bly Krajewski Goodman Files:

Reading A10, F3, H1, T5N 2-

-