ML19210E791

From kanterella
Jump to navigation Jump to search
Forwards LER 79-095/03L-0
Date released: 08/12/2019 Download: ML19210E791


LER 79-095/03L-0:on 791110,during Relief Valve Test,Pump Relief Valve Lifted at 1,250 Psig.Caused by Scuffing on Stem Guide Bushing Id & on Stem Od.Scuffing Cleaned & Surfaces Polished Smooth
ML19210E792
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/10/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19210E792 (2)
Forwards LER 79-095/03L-0
ML19210E790
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/10/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19210E790 (1)