ML19210E661

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-327/79-53 & 50-328/79-28 on 791002-05.No Noncompliance Noted
ML19210E661
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/25/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19210E662 List:
References
NUDOCS 7912050486
Download: ML19210E661 (2)


See also: IR 05000327/1979053

Text

N'M

eYhY

7

.

pn neo

(

UNITED STATES

gg, , .

8

NUCLEAR REGULATORY COMMISSION

.

o

-

c,

$

E

REGION 11

g'f

101 MARIETTA ST

N.W., SUITE 3100

o,

'

ATLANTA, G EORGIA 303o3

OCT t 51979

In Reply Refer To:

RII:MJG

50-327/79-53

50-328/79-28

Tennessee Valley Authority

Atta:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by M. J. Gouge of this office on

October 2-5, 1979 of activities authorized by NRC Construction Permit Nos.

CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant facility, and to the

discussion of our findings held with G. G. Stack (site) and R. M. Pierce

(Knoxville) at the conclusion of the inspection.

Areas examined during the iaspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative reccrds, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

spplication must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

1494

005

79n050

27 6

m

.'

d

OCT 2 51979

Tennessee Valley Authority

-2-

'

-

Should you have any questions concers if this letter, we will be glad to discuss

them with you.

Sincerely,

e

C. E. Murphy,' Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-327/79-53

and 50-328/79-28

cc w/ enclosures:

G. G. Stack, Prrject Manager

Post Office Box 2000

Daisy, Tennessee 37319

J. M. Ballentine

Plant Superintendent

Post Office Box 2000

Daisy, Tennessee 37319

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, Tennessee 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, Tennessee 37401

E. G. Beasley

l494 QQ6

Tennessee Valley Authority

309 Grant's Building

Knoxville, Tennessee 37902