Notice of Violation from Insp on 790820-24,31,0904-07,14-14, 17-21 & 24-28
ML19210E600
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/30/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19210E596 List:
References
50-346-79-25, NUDOCS 7912050354
Download: ML19210E600 (1)


Text

.

Appendix A NOTICE OF VIOLATION Toledo Edison Company Docket No. 50-346 s

Based on the inspection conducted on August 20-24, 31, September 4-7, 10-14, 17-21, and 24-28, 1979, it appears that certain of your activities were in noncompliance with NRC requirements, as noted below..This item is a noncompliance of the deficiency level.

TS 3.3.8 requires in part that. with one or more of the fire detection instrument (s) shown in table 3.3-14 inoperable, a fire watch patrol to inspect the accessible zone (s) with'the inoperable instrument shall be established within I hour and at least once per hour until the instrument is restored to operable status.

Alarm point F-056 includes several instruments shown in Table 3.3-14.

Contrary to the above:

On April 9, 1979, at 1450 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.51725e-4 months <br /> an alarm was received on alarm point F-056.

It remained in the alarm state until April 10, 1979, at 1245 without a fire watch being established.