Forwards IE Insp Repts 50-313/79-21 & 50-368/79-20 on 790909-1005 & Notice of Violation
ML19210E581
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/23/1979
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanagh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19210E582 List:
References
NUDOCS 7912050326
Download: ML19210E581 (2)


See also: IR 05000313/1979021

Text

e

/ /C_

.

.

UNITED STATES

R Recg*

d'

NUCLEAR REGULATORY COMMISSION

D

REGloN IV

7 l

o

611 RYAN PLAZA DRIVE, SUITE 1000

5 .,*h,_

s j

ARLINGTON, TEXAS 76012

%9

October 23, 1979

,o

.....

In Reply Refer To:

Docket Nos. 50-313/79-21

50-368/79-20

saxansas Power and Light Company

ATTN:

Mr. William Cavanaugh III

Vice President of Generation

and Construction

P. O. Box 551

Little Rock, Arkansas

72203

Gentlemen:

This refers to the inspection conducted under the Resident Inspection Program

by Mr. W. D. Johnson of this office covering the period of September 9 -

October 5, 1979, of activities authorized by NRC Facility Operating License

Nos. DPR-51 and NPF-6 for the Arkansas Nuclear One, Units 1 and 2, and to the

discussion of the findings by the inspector with members of your staff at the

conclusion of each segment.of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

During the inspection it was found that one of your activities was not con-

ducted in full compliance with NRC requirements, as set forth in the Notice of

Violation, enclosed herewith as Enclosure (1). This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to

submit te this office, within 20 days of your receipt of this notice, a written

statement or explanation in reply including:

(1) corrective steps which will be

taken by you, and the results achieved; (2) corrective steps which will be taken

to avoid further noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If the

1494

149

b

7912G50

9

.

.

Arkansas Power and Light Company

-2-

October 23, 1979

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement of the

reasons why it is claimed that the information is proprietary. The application

should be prepared so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

will also be placed in the Public Document Room. If we do not hear from you

in this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

6

G. L. Madsen, Chief,

Re.tctor Operations and

Nuclear Support branch

"~

Enclosures:

-

1.

Notice of Violation

2.

IE Inspection Report Nos. 50-313/79-21

50-368/79-20

-

cc w/ enclosures:

Arkansas Nuclear One

ATTN:

J. P. O'Hanlon, General Manager

P. O. Box 608

Russellville, Arkansas

72801