o
UNITED STATES
/
NUCLEAR REGULATORY COMMISSION
n
.
-
.e
REGION 11
o$g
8
101 MARIETTA ST
N.W., SUITE 3100
ATLANTA, GEORGIA 3o303
.....j
Report No. 50-369/79-32
Licensee: Duke Power Company
422 South Church Street
Charlotte, North Carolina 28242
.
Facility Name: McGuire Nuclear Station Unit 1
Docket No. 50-369
License No. CPPR-83
Inspection at Cornelius, North Carolina and Company Offices,
Charlotte, North Carolina
Inspected by: M[
1ec4s
/OMf/ff
-
_.
M. C. Ashenden
Date Signed
Yudu_ 4
io/uh4
E. J. Ford
W
Date Sign'ed
Approved by: Tde
. b/1sl%
R. H. Wessman, Acting Section Chief, RONS Branch
Date Signbd
SUMMARY
Inspected on September 24-27, 1979.
Areas Inspected
This routine announced inspection involved 48 inspector-hours onsite and at
company offices in the area of previously identified quality assurance items.
Results
Of the one area inspected, no apparent items of noncompliance or deviations were
identified.
'
..
1437
226
7911800
fQ
.
.
.
.
DETAILS
1.
Persons Contacted
Licensee Employees
.
- J. O. Barbour, QA Manager, Operations
- W. H. Barron, Operating Engineer
- W. H. Bradley, QA Manager, Engineering
- J. M. Curtis, QA Manager, Vendors
- G. A. Figueroa, Planning Engineer
D. M. Franks, QA Specialist
- J. M. Frye, Senior QA Supervisor, Audits
- G. D. Gilbert, Operating Engineer
- R. F. Johnston, Licensing Engineer
- D. B. Lampke, Licensing Engineer
- T. L. McConne?l, Technical Services Superintendent
- M. P. McIntosh, Station Manager
- D. J. Rains, Station Maintenance Superintendent
- R. P. Ruth, Station Senior QA Engineer
- W. M. Sample, Project and Licensing Engineer
- J. R. Wells, QA Manager, Corporate
R. J. Wilkinson, Station Administration Superintendent
Other licensee employees contacted included technicians, document control,
and office personnel.
- Denoted those present at the corporate office exit interview.
- Denotes those present at the McGuire Station exit interview.
2.
Exit Interview
The inspection scope and findings were summarized on September 26, 1979,
with plant personnel and on September 27, 1979, with Company office per-
sonnel. Those persons indicated in paragraph 1 above attended one of these
exit interviews. The licensee acknowledged the findings without comment.
3.
Licensee Action on Previous Inspection Findings
'
Not inspected.
4.
Unresolved Items
,
Unresolved items were not identified during this inspection.
5.
Inspection of Previously Identified Items
(Closed) Item (369/78-39-01); Defining Organizations. The inspector
reviewed QA procedure 500, Operations Division Surveillance Program,
1 07
227
.
-
t
2
Revision 13, dated 9/79, which required the program to be reviewed at each
station periodically, and no less frequently than annually by the Station
Senior Quality Assurance Engineer. The purpose of this review will be to
revise the surveillance frequencies as necessary, assure adequate scope,
and revise attributes to be examined if needed. Results of this review
will be documented.
The inspector additionally reviewed a Planned Audit scheduled for
October 1979, in which the Quality Assurance Department will be audited by
a Joint Utility Management Group. Based on the above, the inspector deter-
mined the controls in place meet the requirements of Criterion II. This
item is closed.
(Closed) Items (369/78-39-02), Consumable /Expendables Items Interior to
Structures and (369/78-39-03) Consumable / Expendable Items Exterior to
Structures, Systems, and Components. The inspector reviewed the McGuire
Nuclo r Station Nuclear Safety Related Structures, Systems and Components,
Revision 3, dated 9/79, which established the criteria for designation of
.
Consumable / Expendable items.
In Table 1 of that document several
consumable / expendable items were identified and classified, including items
interior and iteL' exterior to safety related structures, systems and
components.
This item is closed.
(Closed) Item (369/78-39-04) Guidance Versus Requitement in QCK-1. The
inspector reviewed OCK-1, " Control of Nonconforming Items", Revision 10
dated 4/79 and verified the word "should" has been replaced with the word
"shall".
This item is closed.
(Closed) Item (369/78-39-05) Cross-Reference Index.
The inspector reviewed
the Administration Policy hanual for Nuclear Station, revised 9/79 to
include a comparison chart of ANSI N18.7 1976, requirements versus
Administration Policy Manual for Nuclear Stations.
The above mentioned
chart meets the requirements of an index for cross-reference. This item is
closed.
(Closed) Item (369/78-39-06) Drawing Control Program. An audit of con-
trolled drawings was conducted and discrepancies found were corrected by
the licensee.
This area was reinspected by a review of methods used to
audit the drawing control program implementation. After discussing the
audit with licensee personnel and reviewing objective evidence that the
audit had taken place, the inspector verified corrective action by in-
. . -
specting forty (40) different sets of drawings in three separate locations.
Based on the inspector's review of this area, this item is closed.
(Closed) Item (369/78-39-07) Vendor Instruction Manual Control. The in-
spector reviewed a licensee commitment letter dated September 26, 1979,
which indicated that a cover sheet accompanying manual changes was to be
placed in' the front of each manufacturer's instruction manual. The cover
sheet was to contain the following information; instruction manual number
and its document control data, document control data of insertion, list of
pages to be removed and list of pages to be inserted. Also, each new sheet
107
228
-
.
.
-3-
to be inserted will be stamped with the document control date to verify
that it is the latest issue. A licensee review of vendor manuals to insure
placement of revision pages was in progress, to be completed prior to
1/1/80, as determined by observation of objective evidence. Based on the
inspectors review of the above, this item is closed.
(Closed) Item (369/78-39-08) Maintenance Scheduling. The inspector veri-
,
fied that the licensee has implemented a Computer Program to schedule
maintenance. The computer program contained such information for safety-
related structures, systems and ccmponents as name of component, designa-
tion, frequency and type of maintenance. This item is closed.
(Closed) Item (369/78-39-09) Preventive Maintenance. The inspector veri-
fied that, Station Directive 3.2-1, Revision 3, dated 7/79, Identification,
Scheduling and Performance of Plant Testing contained the requirement that
testing following maintenance insured that functional capability of com-
ponents is not impaired following maintenance and that all safety-related
components will receive a functional verification prior to returning the
component to service. This item is closed.
(0 pen) Items (369/78-39-10), (369/78-39-11) and (360/78-39-12), Design
Change Requirements. The inspector, in discussion with the licensee,
determined that the Administration Policy Manual for Nuclear Station
(ADM/NS) Section 3.3 was under revision to meet the requirements of ANSI
N45.2.11 - 1974Property "ANSI code" (as page type) with input value "ANSI</br></br>N45.2.11 - 1974" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process. and had not been approved. Until such time as Section 3.3
of the ADM/NS is approved and reviewed by the NRC, these three (3) items
remain open.
(Closed) Item (369/78-39-13), Surveillance Testing.
In discussion with
Project Inspectors, it was determined that an inspection is scheduled which
will address Surveillance Testing. The inspector reviewed a Periodic Test
Summary Steet which identified 283 periodic test procedures of which 127
were approved as of 9/5/79. This item is closed; however, the surveillance
testing program will be inspected at McGuire Station prior to the issuance
of an Operating License.
(0 pen) Item (369/78-39-14) Calibration Control. The inspector reviewed a
computer program which identified instruments required to verify Technical
Specification requirements. The inspector discussed calibration with the
licensee and determined that the program did not meet the requirement of
Duke Power Company QA Topical Report, Duke - IA, Section 17.2.12(c) in that
, , -
tags which showed the date the next calibration is due were not being used
on instruments and other measuring and test devices affecting the proper
functioning of nuclear safety-related structures, systems and components.
Until such time as the licensee amends the QA Program Duke-1A or implements
the requirements of the program, this item remains open.
1437
229
-
.
4
-4-
.
(0 pen) Item (369/78-39-15) Inconsistency between Procedures and Commitments
in Topical QA Program. This item consisted of three parts which are dis-
cuased separately below:
The inspector reviewed MHP3.1, Storage Methods and Areas, Revision 3,
-
dated 4/79, and verified all words "should" have been replaced with
the word "shall".
This part is closed.
.
-
The inspector reviewed OCG-1, Receipt, Inspection and Controls of
Materials, Parts, and Components Important to Nuclear Safety Except
Nuclear Fuel, Revision 11, dated 4/9/79, and verified that the pro-
cedure contained detailed shipping damage inspection instructions to
meet the requirements of the accepted QA program. This part is closed.
-
The inspector was informed that the detailed requirements for the
marking of items given in Appendix A, Section 3.9 of ANSI N45.2.2-1972,
were not being implemented at McGuire Station. Until the licensee
amends the QA program or implements the requirements of the program,
'
this part is open.
(Closed) Item (369/78-39-16) Control of Limited Shelf-Life Items. The
inspector reviewed sufficient documentation such as computer program gen-
erated work requests that were issued for the removal of batteries from
stock, and for the checking of expiration of shelf-life of numerous items.
In addition to the computer program, the inspector reviewed Enclosure 3.9.6
of the Chemistry Manual, which requires a verification of reagent's validity
pEior to performing an analysis. This item is closed.
(Closed) Item (369/78-39-17) Shipping Damage Inspector's Qualifications.
The inspector reviewed QCG-1, Receipt Inspection and Controls of Materials,
Revision 11, dated 4/79, which assures that personnel performing inspec-
tions are QA Inspector Qualified. The inspector reviewed six (6) quali-
fication records and determined the records contained the required
information. This item is closed.
(Closed) Item (369/78-39-18) Adequacy of Periodic Inspection Plans of the
Licensee.
The inspector reviewed QCG-3, Inspection of Items in Storage,
dated 4/79, which meets the requirements of Section 6.2 and 6.4.1 of ANSI
N45.2.2Property "ANSI code" (as page type) with input value "ANSI</br></br>N45.2.2" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process..
Additionally the inspector reviewed six(6) inspection reports of
Items in Storage, Form QCG-3A. This item is closed.
47 '
(Closed) Item (369/78-39-19) Conflict Between Procedures QCG-1 and MHP 5.3.
The inspector reviewed the above procedures and determined that OCG-1,
Receipt Inspection and Control of Materials, Parts, and Components Important
to Nuclear Safety except Nuclear Fuel, Revision 11, dated 4/79, and been
revised to remove the conflict with MHP 5.3, Material Handling Procedure.
This item is closed.
(Closed) Item (369/78-39-20) Warehouse Items Not in Correct Storage
Locations. The inspector interviewed warehouse personnel and determined
that an annual update of all storage locations had been accomplished as
1437
230
-
.
.
-
-5-
indicated by review of objective evidence such as stickers in storage
locations.
The inspector then randomly selected shelf items to determine
if their location was accurately reflected on the computer listing; he then
randomly selected listed items to verify their correct shelf locations.
This later technique revealed a pattern of discrepancies concerning items
which had recently been moved. The licensee then conducted a review of
over 1500 items recently moved and discovered 50 errors representing a
error rate. An analytical breakdown revealed that at least 1.5% of tLe %
error rate could be achieved by greater attention to filling out input
forms correctly. This retraining was satisfactorily conducted and dis-
covered errors corrected. Based on the preceeding licensee actions in this
area, this item is closed.
- (Closed) Item (369/78-39-21), Periodic Inspection of Handling Equipment.
The inspector reviewed Station Directive 3.3.3, Control of Slings and
Lifting Devices, approved 6/76, which requires an inspection of slings each
day a sling is used.
If a sling is used more than one shift per day or
subject to other severe service requirements it shall be inspected prior to
its use.
The results of the inspection are documented on a Plant Work
Order. This item is closed.
(Closed) Item (369/78-39-22), Rodent /Small Animal / Ire.act Control. The
inspector reviewed an approved Requisition, dated 9/75, for a contractor to
provide Rodent and Pest Control for Mcbaire Station effective November 1979.
This item is closed.
(Closed) Items (369/78-39-23) and 369/78-39-24), Record Storage at Company
Office, Record Storage at McGuire Stttion. The inspector found that at the
Company Offices, the Quality records were either in storage at the vault or
had been transferred to McGuire Station Master Files. The record storage
facilities were reinspected and in discussion with the licensee, it was
determined that the licensee has opted to follow NFPA 232-1975 as allowed
by the committed QA Program (Regulatory Guide 1.88). Chapter 5, Section
5242.b of NFPA-232, allows the degree of protection for Class 1 records by
housing them in a standard fire resistive vault or in safes, or record
protection equipment having a fire rating comparable with the maximum fire
hazard to which they may be exposed. The inspector determined that the
Master Files at McGuire did not have installed fire-door dampers where the
ventilation ducts penetrate the facility, but did provide the provision of
a complete shutdown of all air handling equipment in the building in event
of a fire detection / protection system alarm. The inspector informed the
'
licensee the NRC may reinspect the record storage facility if further
guidance was received. These items are closed.
(Closed) Item (369/78-39-25) Failure to Establish Master Calibration
Schedule. The inspector verified that the licensee had established a
master surveillance schedule for the test and measurement equipment. The
inspector interviewed a health physicist and determined the schedule was
1437
231
..
.
-6-
.
complete and up to date for the amount of equipment in use. hheremaining
equipment was scheduled for calibration for the first quarter of 1980.
This item is closed.
(Closed) Item (369/78-39-26), Standards and Testing Facility Recordkeeping.
The inspector reviewed Sections 7.1.6, 7.1.7, and 7.1.8, of the Standard
and Testing Facility Manual, Revision 8, dated 6/79, and verified during
the inspection that the licensee's commitment to the Duke Topical QA Program
,
in the recordkeeping area were implemented as described in the above men-
tioned Manual. This item is closed.
(Closed) Item (369/78-39-27) Standards and Testing Facility - Out of
Calibration Controls. The inspector reviewed Section 13.5.2 of the
Standard and Testing Facility Manual Revision 7, dated 12/78, and
determined that adequate controls are in place to assure that out of
calibration and/past due for calibration instruments are not used for
safety-related work. This item is closed.
(Closed) Item (369/78-39-27) Standards and Testing Facility - Trend
Analysis. The inspector reviewed Sections 15.5.1, 15.5.2 and 15.5.3
Revision 7, dated 12/78, and determined by the review and a discussion that
adequate Trend Analysis is being performed at the facility. This item is
closed.
(Open) Item (369/78-39-29), McGuire Station Trend Analysis. The inspector,
in discussion with the licensee, determined that McGuire Station had not
yet implemented a system by which trend analysis of safety-related equip-
ment failures could be performed.
The Administration Policy Manual for Nuclear Stations additionally does not
sufficiently describe the trend analysis requirement. The above informa-
tion was discussed with the licensee and the inspector was informed that
the Admiristration Policy Manual would be revised to describe the requirement.
Until the licensee has established a program to implement trend analysis
of safety-related equipment failures, this item remains open.
(Closed) Item (369/78-39-30) Housekeeping. The inspector reviewed OCD-1,
Housekeeping During the Operations Phase of Nuclear Stations, Revision 4,
dated 4/79, which requires inspections to be performed on a scheduled basis
to assure the adequacy of cleanness and housekeeping practices in work
=s
"
areas with designated zones / levels. The inspections are documented by the
Station Senior QA Engineer. This item is 21osed.
.