ML19210D406
| ML19210D406 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/15/1979 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML19210D407 | List: |
| References | |
| NUDOCS 7911270038 | |
| Download: ML19210D406 (2) | |
See also: IR 05000445/1979027
Text
??C
-
.-
e 8c0
UNITED STATES
a
- g
9'o,$
NUCLEAR REGULATORY COMMISSION
O%
REGION IV
N l M
o
611 RYAN PLAZA DRIVE, SUITE 1000
% M.gv ij
ARLINGTON, TEXAS 76012
!h
8
0
November 15, 1979
,,,,,
In Reply Refer To:
RIV
Docket No. 50-445/79-27
50-446/79-26
Texas Utilities Generating Company
ATTN:
Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas
75201
Gentlemen:
This refers to the inspection activities performed by our Resident Inspector,
Mr. R. G. Taylor, of activities authorized by NRC Construction Permits No.
CPPR-126 and 127 for the Comanche Peak Steam Electric Station, Units 1 and 2,
and to the discussion of the findings by the inspector with members of your
staff on November 7, 1979.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with Part 50, Title 1C, of the Code of Federal
Regulations. The item of noncompliance and references to the pertinent
requirements are identified in the enclosed Notice of Violation.
Details of
this item will be included in an inspection report to be issued in the near
future and identified as Inspection Report No. 50-445/79-27; 50-446/79-26.
This notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 30 days of your
receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance; and
(3) the date when full compliance will be achieved.
.
[400 3M
7911270 @v
-
Texas Utilities Generating
Company
-2-
November 15, 1979
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
Y
/
,
W. C. Seidle, Chief
Reactor Co's ruction and
Engineering Support Branch
Enclosure:
Appendix A, Notice of Violation
cc: w/ enclosure
Texas Utilities Generating Company
ATTN:
Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas
75201
) l\\.00