ML19210B673
| ML19210B673 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/16/1975 |
| From: | Arnold R Metropolitan Edison Co |
| To: | Nelson P NRC Office of Inspection & Enforcement (IE Region I) |
| Shared Package | |
| ML19210B671 | List: |
| References | |
| GQL-1163, NUDOCS 7911110140 | |
| Download: ML19210B673 (2) | |
Text
......____..___. _..__ _ _ ____ _........
.. f.... ?,ll ;r;'LT
~
'x,
~a in x m s
ML_
)POLITAN EDISON COMPANY
.:!n.ar or ac:.rnm.~uwe vriur:..vmmw-OFFICE BOX b42 RE ADING. PENNSYLVANI A 19G03 TELEPHONE 215 - 929 3601 June 16, 1975 GQL 1163
=-
k'.b_..
Mr. Paul R. Nelson, C.hief
=;-
Radiological Environ = ental Protection Branch U. S. Nuclear Regulatory Co==ission, Region 1 631 Park Avenue
=.
King of Prussia, Pennsylvania 19h06
Dear.Mr. Nelson:
Three Mile Island Nuclear Station Units 1 & 2 Licenses DPR-50 and CPPR-66 Inspection Nos. 50-289/75-06 and 50-320/75-04 lis letter and the acco=panying enclosure are in response to your Anspection letter of May 22, 1975, concerning Dr. Gallina's inspection-of our Three Mile Island Nuclear Station Units 1 and 2 and the resul-
+-
tant findin6s of that inspection.
Sincerely, 4
R. C nold Vice President RCA:RSB:eg File 20.1.1/7.7 3.5 1 Enclosure - Response to Inspection Letter 4+
o V911110/70 O
ENCLOSURE r
)
\\u/
Metropolitan Edison Company Three Mile Island Nuclear Station (TMI)
Licenses Nos. DPR-50 and CPPR-66 Inspection Nos. 50-289/75-08 and 50-320/75-Oh
- _== 3
--i._
Response to Descriution of Antarent Violation 4
Atuarent Violation Contrary to Sections 6.2.1 and 6.2.3 of your Technical Specifications 3
and Health Physics Procedure 1670.12, "E:ergency Equipment Readiness Check," emergency equipment was not checked and inventoried fror. April j
through November of 197h.
=
Response to Atuarent violation A record of inventories of emergency equipment is not available for the period of April through November 197h due to the fact that implementing
'rocedural guidance for performing and documenting invent, dure (H.P.1778) ories did not xist prior to November 197h. A specific inventory proce
- - ~.
'vas implemented in November 197h, and all subsequent quarterly inventory records are available at the TMI site.
Recent revision to the emergency equipment inventory procedure has been incorporated to insure that instru-mentation is checked for calibration and that any equipment deficiency 1
corrections are thoroughly documented.
Further, procedure requir'es this to be done quarterly.
As full co=pliance has been achieved, no further actions are planned.
r
1506 079 Q
.