Insp Repts 50-289/72-04 & 50-320/72-01 on 720309. Nonconformance Noted:Failure to Color Code Portion of Cable Between Control Room Console & Terminal Strips in Cable Spreading Room Per FSAR
ML19210B599
Person / Time
Site: Crane  Constellation icon.png
Issue date: 04/14/1972
From: Folsom S, Howard E, Varela A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19210B596 List:
References
50-289-72-04, 50-289-72-4, 50-320-72-01, 50-320-72-1, NUDOCS 7911110034
Download: ML19210B599 (8)


See also: IR 05000289/1972004

Text

..

-

_ _ = . ._. . . _ _

_ _ . _ . _ -

m.;

..._m-

. . .

. . .

. . _ _

_%__._._.

_

'

.

.

,

.

.

.

\\

~

'

-

U. S. ATOMIC ENERGY COMMISSION

DIVISION OF COMPLIANCE

REGION I

-

.

.

CO Inspection Report No. 50-289/72-04 and 50-320/72-01

Subject:

Metropolitan Edison Company

.

Three Mf?.e Island Units 1 and 2

License Tc. CPPR-66

1location: Near Middletown, Pennsylvania

Priority

Unit t-B

Category Unit 2 - A

_

Type of Licensee:

PWR, 2535 (B&W)

Type: of fInspectf.on: Special, Announced

'D' tes of. Inspection:

March 9, 1972

a

-

Dates of' Previous Inspection:

February 16, 1972

Me

[ / 7 7 7.__.

Pi-incipal Idspector:

.) cr

/ Date

-

S.IA..:Folsom, Reactor Inspector

Accompanying. Inspectors:

eb

/l[ Q

A..A.

Varela, Reactor Inspdctor

/ Dat'e

^ '

--

_ . - - - . _ _ _ _ . _ _ .

. . . _ .

__. _ __

_

- - - - -

-.

- - -_ _ __. _

. _ _

_ _ .

Date

H. E. H. Schierling (DRL)

Other Accompanying Personnel:

D. F. Sullivan (DRS) __.

__

R. L. Cudlin (DRL)--------

-

Date

f

._

__

- Reviewed By:

, M, Myur:::44

g.fg.72

E. M. Howard, Se*1 Lor Reactor Inspector

Date

  • NONE

Proprietary Infor=ation:

1566

287

-

7911110G37

-

..

- . _

. _ .

.

--

- * .

.-, ---.. -

7

. . .

_

_

i

'.

.

.

.

m

-2-

~

s . .-

SECTION I

.,

Enforcement Action

'

The applicant hus failed to conform to the Unit No.1 FSAR require-

,

ments governing cable routing and channel identification of redundant

engineered safeguard and reactor protective system cables between

the control' room console and the cable spreader room, and also in the

'

.

.

ESF actuation cabinets.

(Section II, Paragraphs 2 and 3)

-

~

Licensee Action on Previously Identified Enforcement Matters

,

,

None

,

Unresolved Items

' '

'l

A.

Several. lighting fixtures of doubtful seismic integrity were sus-

pended directly over the batteries in the battery rooms.

(Section II, Paragraph 4)

B.

Cadwelding. on the. Unit i containment ring girder exhibited numerous

defects.

(Section II, Paragraph 5 and Section III, Paragraph 5)

.

Status of Previously Reported Unresolved Items

A1 The review off the dynamic stress analyses on the main steam and

pressurizer relief ~ valves is in progress and nearing completion.

This: item remains -unresolved.

'

H.

The applicant is pursuing the documentation of valve wall thick-

ness information.

Discrepancies of an unspecified nature are

currently being investigated. This item remains unresolved.

C.

The repair work on Unit 1 containment ring girder is still in

progress, with four out of an estimated 22 concrete placements

-

completed.

(Section III, Paragraphs 1-5)

Design Changes

1566

288

None

Unusual Occurrences

None

.

.-

.

,-=+-e

e gn

.-e

.-

. . . .

..

~

~ ~ ' . T

.- ...

^ T. . ~- . . - : '~~

'

~

.

.

. - - -

-

. - - -

- - - -

._...

!^

-

r

I

.

,

I

-;

C

-3

i

.

.

Fersons Contacted

-'

-

-

.

Metropolitan Edison Company /GPU

.

Mr. R. W. Heward, Jr., Project Manager *

Mr. B. G. Avers, QA Manager *

,

-

Mr. J. R. Thorpe, Licensing Engineer *

'

-

Mr. T. E. Hreczuch, Resident Mechanical Engineer *

_ ' '

Mr. J.

H-.

Wright, Resident Civil Engineer *

'

',

Mr. D. .H.

Reppert, Safety and Licensing Health Physicist *

'

Mr. W. F. Schmauss, Electrical Engineering Manager *

Mr. W. T. Gunn, Project Engineer, Unit 1*

i

.

United Engineers and Constructors (UE&C)

..

Mr. G. Ferguson, Project Superintendent *

y

-

Mr. R. W. Liscom, QC Electrical Engineer *

Mr. J; C. McKee, Assistant Project Superintendent, Unit 2

Mr. W. Ecugen, Ring Girder Repair Supervisor

,

Mr. R. Moyer, QC Supervisor

'

Mr. H. Finlan, QC Welding

Mr. P. Dailey, QC Structural

,

Babcock & Wilcox (B&WT

l

Mr. J; E. Hill *

!

Gilbert Associates (GAI)

.

'

Mr. W. F; Sailer, Project Manager *

Mr. E. Stauffer, Electrical Design Supervisor *

-

Mr. J. M. Smith, Project Electrical Engineer *

,

Mr. V. H. Williams, Instruments Engineer *

Management Interview

The following items were discussed on March 9, 1972:

A.

The inspector requested information on the status of the review of

the dynamic stress analyses on the main steam and pressurizer safety

and relief valves on Units 1 and 2.

The applicant stated that the

review was underway and nearing completion.

1566

289

  • Attended Management Interview

.

,

-

.

-=e

..

-

_

_ , _ _

. . _ . .

.__

-

,

. . . __ . . _ . , ,

.

, _ . .

._

.

.

.

.

.

.

'

s

B '. The itispector stated that la i.he exainlaatica of the Unit 1

electrical installation the following items 'ere observed:

1.

There is no evidence of color coding ta ensure redundant

channel separation in that portion of the cable installation

between the control room and the cable spreading area in the

~

room below.

(Section II, Paragraph 2)

,

-

2.

There was no evidence of three color coded separate channels

feeding from the three sensors to the ESF logic cabinets.

(Section II,_ Paragraph 3)

3.

Fluorescent lighting fixtures of questionable seismic integrity

had been observed directly above the batteries in the battery

room.

The applicant acknowledged the inspector's cotaments, and stated

.that each item would be examined and corrective action taken

~'

_

where required.

C.

The inspector stat'ed that several instances of apparently unsatis-

fsetory cadwelding had been observed on the ring girder repair

^

(

work. Excessive voids were observed at the sleeve ends.

In other

instances, metal was extruded an inch or more outside the sleeve,

indicating improper packing. The applicant stated that a number

- of.the deficiencies observed by the inspector had already been

identified as rejectable by the constructor's inspectors.

Some

difficulty in maintaining desired cadwelding quality was acknowledged,

but the applicant agreed to review the cadwelding quality control

program for adequacy.

(Section II, Paragraph 5)

.

~

T566

290

.

e

e

.

e

me -

e me e .

-e

n

-- -

.

  • *

--

.

-

- . - - . - _ _ _ . . . _ . _ . - - -

. _ _ .

- _ . .

-

_..

_

- _ . , . _ _

.

. . . , . . .

. . .

_.

. . . . .

. ..

. .

.

- . _ _ . . . .

.

.

r

(

-5-

Q_

-

-.

.

,

-- . . . . . .

. . - _ .

-

Erepared by:

S. A. Folsom

Additional Subiects Inspected, Not Identified in Section I. Where No

-

Deficiencies or Unresolved Items Were Found

1. . General

.

Status of Construction

The applicant reported the following:

Unit 1

Unit 2

.

Construction Percent Completion

78

19

-

Start of;P~re-op Testing

3/72

No estimate

Fuel' Loading

2/73

7/74

Start of Commerical Operation

7/7/73

11/29/74

Electrical: Cabling Percent Completion

35

---

/

Details of Subjects Discussed in Section I

21. Wiring. from the control console to the cable spreading area below is

vir vertical cable runs, thereby eliminating horizontal runs within

the.consolb. There was no evidence of site QA review of the separa-

tion oflthe redundant system cables in these vertical runs. No

col'or. coding was seen in the bundles of wires between the console

and the terminal strips located in the cable spreader room. There

appeared to be w idespread co-mingling of redundant wires in this

-

area.

By contrast, thera appeared to be adequate scpar,tfan of

redundant cables both within the console and in the sprsader room

cable trays.

3.

The ESF actuation cabinets exhibited a lack of implementation of

the color coding and separation of the redundant instrument signal

wiring which should have had three distinct color coded sets of

conduits. At the exit interview, the applicant claimed that certain

of the containment pressure switch logic (two out of three) was

installed exterior to the ESF panels, leaving only two redundant

signals- (train A and 31 appearing at the cabinet. This statement

was not consistent with the statement that the logic for the re-

maining signals was installed in the cabinets; therefore, three

sets of conduit should have been observed.

1566

291

. . . .

.

.

.

-_

.

.

,

.

..

.

.m_

.

.

. _ . . _ _ _ .

.- . _ . ._.

._ ._

,

-

.

.

. .

  • .

.

D**]D *]Dfllf

(

'

-6-

o m jg a jg J[J.Y

-

.,

,

-

Ane applicaut agreed to pursue This mattar cnd tc cicrify

--

which channels are actually being installed in these cabinets.

.4

Fluorescent lighting fixtures, each weighing 60' pounds,'were

seen to be sespended directly over the batteries in each

~

battery room. The seismic integrity of these lighting fixtures

appeared questionable, presenting the possibility of their

damaging the batteries in the event of a seismic incident. The

applicant's architect-engineer stated th.at the fixtures had been

deened satisfactory to meet the seismic requirements, but agreed

to re-examine the design.

,

Si cadwelding on the Unit 1 containment ring girder was observed to

-

include a number of defects.

Instances of misalignment and ex-

cessive voids at sleeve ends were in evidence. Two sets of sister-

spliced rebars which were laying on the dome apparently in readi-

ness for movement to the testing laboratory exhibited excessive

sleeve-end voids. Three cadwelds had metal extruded an inch or

more beyond the sleeve due to improper or inadequate packing.

In most instances the iron workers'

foreman and the cadweld in-

spector claimed that these were known rejects, although they were

not marked as such.

'

The applicant admitted that difficulty had been experienced in

maintaining . required cadweld quality and agreed to take the

,

- necessary action to correct the condition.

-

Subsequent (o.the inspection, on March 13, 1972, the inspector

was informed that a Cadweld Rebar Splices Company representative

had been call'ed to the jobsite to provide necessary cadwelding

.

re-training, and a full-time cadwelding inspector had been as-

signed by the applicant.

.

1566

292

.

_

.

.

,.T.1.

_ . . _ _ .

. _.

__E

. _ . . . . _ _ _ . . _ _ . . _ . . ~ . . . . _ . .

_..

. _ . .

.1. ~ ..

.2_.

. . . ~ . . _ . _ _

.

~

'

,

.

.

,

.

-

. .

,C

7

.

. . ,

,

.

-

.p

-

S;0TICM III

Prepared By:

A. A. Varela

.

s

.[

Additional Subjects Inspected, Not Identified in Section I, Where No

,

-l

D'eficiencies or Unresolved Items Were Found

.

None

l

Details of Subjects Discussed in Section I

~

j

Ring Girder 180 North Repair

i

l'. . construction Status

i

Four concrete placements out of 22 total have been completed.

Their

locations are as follows:

6

Segment

Azimuth Location

Lifts Placed

-

I '. 15

1080

93

2 of 2

-

II 30

63

33

1 of 3

-

- II . 15 '

3030

288

1 of 3

-

.

No excavation or repairs have been undertaken on any Segment III

-

area. Excavation in these areas is expected during April after

work on Segments I and II is completed. The first Segment III

~

concrete placement is expected by the licensee to be made in May.

2.

Rebar Weld Repairs - Estimate Precentage Nicks Recaired

As of February 22, 1972, the licensee estimated percentage of nick

weld repairs on all bars was 2.227. and 0.427. on structural bars

excluding shear bars. At this inspection (3/9/72), based on total

number of critical bars covered and the number of nick-weld repairs

completed, the projection for entire repair area is as follows:

a..

Percentage of total nick-weld repairs - 1.577.

b.

Percentage of total nick-weld repairs (not including shear

bars) - 0.647.

~

1566

293

'

.

e-

.

-..:

... -

.

. . -

.

.. -

.

..

.n

.

,

.

.

.

.

..

,

/

-8-

N

J

~

~

'

3.

Summary o'f Repairs in C'omoleted 150

~

Seement J.

D218/62'24

The total number of cadwelds .nade are 147 ef which 122 were in

Lift No.1 and-25 in Lift No. 2.

One bar n a nick-weld repaired

and eight butt weld rebar replacements wete performed.

Of the

latter, radiographic examination showed porosity in excess. of

Weld Procedure No. 25 requirements on five of them.

Review of

,

records indicates that all eight butt welds were either replaced

with full length bars or cadweld spliced. No nick repair or butt

welds occur in Lift No. 2.

Five of seven dome tendon spirals

damaged in concrete excavation were removed and replaced with

one-inch square hoops of ASTM A441 material.

4.

Observation of Work Performance

i

Work was observed in concrete excavation, ca dwelding splicing,

-

grounding wire installation on trumplates, hoop welding for

-

spiral replacement and moist cure of fresh concrete.

All work

observed appeared in conformance to Repair Procedure CCP-9.

5.

Record Review

A review of documentation for areas where concrete was placed

indicated conformance to Ring Girder Repair Procedure CCP-9 and

continuance of filing system identified in CO Report No. 50-289/72-03,

-- Paragraph 4,Section II.

Certain details on cadweld inspection

-

reports were found different from the records reviewed at the

latt inspection. The identification of cadweld splice location

on work performed after February 17, 1972 lacked elevations. This

was spoken of in the management interview.

.

1566

294

.

G

.-

,

-