.._ _ _
6 UNITED STATES
~
- l. # M. ',k ATOMIC ENERGY COMMISSION D
DIVl31oN oF COMP 1.lANCc 201 G45 10
{'
REGloNI t
97o BROAD STREEr 3g e,
nnwAnn. x:= :ne e or:c:
APP.1 -i 19N Metropolitar ".dison Cenpany Docket No. 50-320, Attention:
- c. J. G. Miller de ~1 #1 71ce President P. O. Box 542 acading, Pennsylvania 15003 D,m D
D
.,3
, }
b.
ao Gentlemen:
a This refers to the inspection conducted by Mr. Folson & Mr. Varela of this office on March 9, 1972 of construction activitics authorized by AEC Conceruction Permit Nos. CPPR-40 and CPPR-66 and to the discussions of our findings held by Mr. Folson with Messrs. Ecward, Avers and Thorpe of your staff at the conclusion of the inspection.
Arcas exanined during the inspection included electrical cable installation, battery rooca, diesel generators, instru:tentation, and progress on the ring girder repair program. Within these areas, the inspection consisted of selective es:aninations of procedures O
and representative records, intervicus with plant personnel, and observations by cur inspectors.
During this incpection, it was found that one of your activitics appeared to be in nonconformance with the Unit No. 1 Final Safety Analysis Report. The iten and references to the pertinent requirecent are listed in the enclosure to this letter. Please provide us within 30 days, in writing, with your cornents concerning this iten, any steps that have been or vill be taken to correct it, any stops that have been or will be taken to prevent recurrence, and the date all corrective ection or preventive ncasures verc or vill be completed.
Should you have any questions ccucerning this inspection, we vill be pleased to discuss then with you.
Very truly yours, Jancs P. O'Reilly 1566 284 Director
Enclosure:
Description of Kcnconfornsuce Item bec:
L. Kornblith, C0 J. 3. Henderson, CO Local PDR R. E. Engelken, C0 J. G. Keppler, C0 NSIC P. A. Morris, DM
O File 3 T. Laughlin.
DR Central Files DTIE 7911110 @
,M DESCRIFTION OF EONC0!.TO:U'JJiCE ITHI Metropolitan EJison Company 0 A*D
- D'T Docket Ros. 30-2E9 and 50-320
' y'(
ee c
License Nos. CPPR-40 cud CPPE-66 An item appears to be in nonconfer"7ce with the stater.ents made in the Unit No. 1 Final Safety Analysis Report (FSAR) as identified belcu:
The FSAR A=endment 15, page 8-7, states in part, " Wire and cables related to engineered safeguard and reactor protectiva systems are being routed and installed in such a manner as to maintain the integrity of their respective redundant channels and protect then from physical da= age.
Circuits, trays, conduit, and electrical equipment which are Clacs I from the public safety stand-point are being color' coded to help ensure the co::plete maintaining of power, centrol, and instrunent channel integrity."
g Contrary to the above, no color coding vas in evidence in that portion of the cable. installation betucon the control reca console and the terminal strips in the cabic spreading Tho. cabling in the Engineered Safety Fcatures (EST) roc =.
cabincts also edibited a lack of the required color coding.
1566 285 i
.me
-