ML19210B185
| ML19210B185 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/02/1974 |
| From: | Moore V US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| References | |
| NUDOCS 7911040113 | |
| Download: ML19210B185 (2) | |
Text
.e.
'a t t*
DISTRIBUTION:
\\ pocket LWR 2-3 Rdg VAMoore Docket "o. 50-289 DEisenhut RWKlecker RMBernero EIGoulbourne (2)
Metropolitan Edison Conpany ACRS (16)
ATTN: Mr. Robert C, Arnold 1 extra cpy Vice President P. C. Box 542 Reading, Pennsylvania 19603 Centlemen:
Amend:sents to the Cocmission's regulations (10 CFR 50.59) which relates to the manner in which proposed changes in the technical specifications for facility operating licenses are to be requested and acted upon, became effective on April 22, 1974. The purpose of this letter is to call this to your attention and point out that all requests for technical specification changes to facilities with operating licenses must be submitted in the form of an application for a license amendment in accordance with the applicable provisions of Parts 2 and 50 of 10 CFR Chapter I.
~ Mote that section 50.30(b) of 10 CFR Part 50 requires that applications be executed in three signed originals by the applicant or duly authorized officer thereof under oath or affirmation. In addition to the three signed originals, 37 conformed copies of all portions of those applications requesting technical specification changes for power and test facilities, and 19 conforned copies of all portions of those for research and critical facilities should be filed.
Sincerely, Original Signed by m
[ Voss A. Moore, Assistant Director for Light Vater Reactors, Group 2 Directorate'of Licensing ces: See next page 1507 lt0 PPPI o ric = *
. LWR 2-3..
_.. LWR
-3...
- L:
.. 2-3.. L:33 LWRs.2 EIGol;0.
ne: ;mf.RMB rn
.AS hW ncer_.
.VAM e..
.uan===*
7/...[../747/._.[.../74...._/_l..../74.(/.4
/74
\\
o.n *
'orm AEC 31s (Rev. 9.S5) AECM 0240 1lt u. ii. eovsamassar paintime orrecsa son.sas soe 4911040//3 O
i e,
7!r. Robert C. Arnold ces: GPU Service Corporation Richard W. Ucvard, Project : tanager Thomas li. Cri:unins, Jr., Safety and Licensing Manager 260 Cherry Hilf Road Parsippany, Ucv Jersey 07054 Pennsylvania Electric Company Vice President, Technical 1001 Eroad Street Johnstown, Pennsylvania 15907 George F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge 910 - 17th Street, N. W.
Washington, D. C.
20006 Mr. Weldon B. Archart, Chairman Board of Supervisors of Londonberry Township 2148 Foriana Road Middletown, Pennsylvania 17057 Mr. Charles P. Hoy, Chaiman Board of County Consnissioners of Dauphin County Dauphin County Courthouse P. O. Box 1296 Harrisburg, Pennsylvania 17018 Miss Ifary V. Southhard, Chairman Citizens for a Safe Environment P. O. Box 405 I!arrisburg, Pennsylvania 17108 1587 lui omas >
eun=aesa >
oare >
4 318 (Rev. 9-53) ABCM 0240 W ua sa sovunumsar paintime orriers sera.sae-see
- g. y Robert C. Arnold 2-JU.4 g ggy cc: George F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge 910 17th Street, NW Washington, D. C.
20006 En7 lu?
su u
or rec s >
eung aus h DAfo W Form AEC.)IS (Rev. 9 53) A?.CM 0240 W u. s. eovannusur en.ntine opricas s er.sze.ies
r
/ L) /< _
/
/
/R! ng;]
?
i
/
VM,
=;;"L"'"
,/
/
/
METROPOLITAN EDISON COMPANY e > mu.u,
r vnumr em.ute-
/
)ST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-3G01 TM/ I '/1974 Dr. D. F. Knuth, Director Directorate of Regulatory Operations United States Atomic Energy Co==ission Washington, D. C.
20545
Subject:
Three Mile Island Nuclear Station Unit 1 Docket No. 50-289 License No. DPR-50 Inspection of Reactor Internals After Hot Functional Testing
Dear Dr. Knuth:
The inspections and investigations reported in Mr. J. G. Miller's letter cf April 26, 1974, to Dr. D. F. Knuth have been ccepleted.
A detailed inspection of the entire reactor internals package, reactor vessel, and closure head by Quality Control indicated that no damage was caused by the nut and that the nut was not part of the reactor components.
The reactor coolant system and associated systems were reviewed by GPU Service Corporation.
It is concluded that the nut was of foreign origin and was not a part of these systems or the components of these systems (i.e., valves, pucps, motors).
An AEC-DRO Inspector examined the " Addendum to Inspection Record B-9, IFI-ll5", dated May 2, 1974, which documented the results of the reactor internals foreign material investigation and considers this item resolved per Inspection No. 50-289/74-22 dated May 8, 1974.
Very truly yours, r,
e
- q
'b
('( w; R. C.
rnold Vice President-Generation
\\cc7
- lua, brh J G 7
CC:J. P. O'Reilly
/
J G
O q#