Text
-
jr
. a m.
September 19, 1977 DISTRIBUTION: /
Docket Filev' NRC PDR L PDR Docket No.: 50-289 ORB #4 Rdg RReid RIngram GZwetzig ittropolitan Edison Company TJCarter ATTH: Mr. J. G. Herbein Attorney, OELD Vice President 0I&E (3)
P. O. Box 542 DEisenhut Reading, Pennsyhania 19603 IEX TBAbernathy JR8uchanan Gentlemen:
ACRS (16)
Gray File RE:
THREE HILE ISLAND UNIT NO.1 The Nuclear Regulatory Comnission has reviewed the infomation that you are required by your technical specifications to sue 11t as part of ~ an Annual Operating Report and has concluded that much of the infomation now included in the Annual Operating Report can be deleted and still meet the desired t!RC objectives. Therefore, we are planning to delete the requirements for an Annual Operating Report provided that certain information presently in the Annual Operating Report continues to be reported.
The purpose of this letter is to reouest that you submit a proposal to delete the requirement in your technical specifications for an Annual Operating Report. There is, however, one portion of your Annual Operating Report that must be retained in the Technical Specifications. The tabulation of occupational exposure data is needed by HRC and must continue to be subnitted on an annual basis. This tabulation may be submitted along with any report of facility changes, tests or experiments required pursuant to 10 CFR 50.59(b), or as a separate submittal if you wi sh.
In addition, we request that you concurrently modify the content of your required Monthly Operating Report. You presently nay De using three
- eport formats contained in " Reporting of Operating Infomation - Appendix A Techr.fcal Specifications" Regulatory Guide 1.16 as your monthly report.
The ' Average Daily Unit Power Level" format rmains the same and should continue to be used. The other two fomats, " Operating Data Report" and " Unit Shutdowns and Power Reductions", along with their associated instructior.s for completing the fomats, have been revised slightly.
These revised fomats should be used starting with your monthly rrport for January 1978. Twelve copies of each of the current formats and the associated instructions are enclosed for your use. Additional copies may be obtained from our Office of Management Informatic,o and Progran Control. Along with the three recort fomats that provide much of the q
1492 010 7010300 ( Q
/
y i
Petropolitan taison Ccepany.
needed monthly operating information, we request that you provide a "Harrative Summary of Operating Experience" tnat describes the operation of the facility, including major safety-related maintenance, foe the monthly report period. Tne surr.;ary should be of the style and cetail sinflar to that previously prepared for inclusion into the Annual Operating Report.
This reauested "Harrative Summary of Operating Experience" is to cover each one-nonth period only and is part of the Monthly Operating Report which should be submitted by the tenth of the month following the calendar nonth covered by the report to the Director, Office of Management Infomation You should state your intentions with respect to and Progran Control.
providing this revised Monthly Operating Report when you submit a proposal to delete the Annual Operating Report.
In lieu of the 1977 Annual Operating Report, the NRC will cmpile, fron previcusly submitted reports, that information now judged necessary.
This empilation of operating data will De transmitted to each licensee for validation and addition of any missing data. Additionally, a separate, one-time only, "Harrative Surnary of Operating Experi1nce" will ce required to cover the transition perica (calendar year 1977) because the narrative of operating experience was not submitted with previous Monthly Operating Reports nor will there be an Annual Operating Report which would have contaired the narrative.
We request that you (1) propose $ change to your technical specifications that would delete the requirement for an Annual Operating Report, (2) modify the content of your montnly report, (3) provide any missing data in the summary caspilation which will be prepared and transmitted to you by NRC, and (4) provide a narrative of operating experience for the year 1977. We believe that this new reporting program will represent a significant paperwork reduction, provide core timely infomation and eliminate unnecessary infomation. We reauest that you make a submittal as soon as possible, but no later than kovceber 1,1977, so we may celete the requirerent for the suomittal of an Annual Operating Report by March 1,1978.
Sincerely, p
r 3%%.
b
/
Robert W. Reid, Chief Operating Reactors Branch 94 Division of Operating Reactors
Enclosures:
i m 01j Monthly Report Fomats and Instructions (12) cc w/ enclosure (1): See next page g--g C-0R5NdR
/
ORB #
/Dg
/
o,,ic E,
h3Reid GZwetzig:rm TJCarter d
9//f/77
_ 9/d/77 t
9/14/77 ft u. s. aoVERM4ENT PMlNTTNG OFFICEa 107,.-em NRC PCsX 31s (9 76) NRCM 0240
e Metropolitan Edison Company cc:
G. F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge 1800 M Street, N. W.
Washington, D. C.
20036 GPU Service c-.,
ation Richard W. Heward, Project Manager Thomas M. Crimmins, Jr Safety and Licensing Manager 260 Cherry Hill Road Parsippany, New Jersey 07054 Pennsylvania Electric Company Mr. R. W. Conrad Vice President, Generation 1001 Broad Street Johnstown, Pennsylvania 15907 Mr. Weldon B. Arehart, Chairman Board of Supervisors of Londonderry Township RFD#1, Geyers Church Road Middletown, Pennsylvania 17057 Miss Ma ry V Southard, Chairman Citizens for a Safe Environment P. O. Box 405
<arrisburg, Pennsylvania 17108 Government Publications Section State Library of Pennsylvania Box 1601 (Education Building)
Harrisburg, Pennsylvania 17126 1492 012
OPERATING DATA REPORT DOCKET NO.
DATE COMPLETED BY TELEPHONE.
OPERATING STATUS
- 1. Unit Name:
- 2. Reporting Period:
- 3. I.icensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
This Month Yr..to.Date Cumulative
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.rnd Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMEPCI AL OPERATION 149 013
<alv>>
INSTRUCLNS FOR COMPLETING OPERATING DATA REPORT Ihs report should be furmshed each month by licensees. The n a..e and
'pnone number of the preparer should be provided in il.e.!cwnated 'spases. The mstructions below are prouded to assist hce:'
.n reportma the data consistently. The number of the m>trucuon corresponds to the item number of the report format.
AQ G'ry f
/P "
h WW]W
=
1 UNIT NAME. Self. explanatory.
or of commercial operation whichever comes last, to the end of the penod or decommissionmg. wluchever comes
- 2. REPORTING PERIOD. Designate the month for which first. Adjustments in ^'ock hours should be made in ll : data are presented.
wluch a change fr - nandard to daybght.savmgs time (or Ylee Versa) Occurs.
- 3. LICENSED THERMAL POWER t MW 1is the maximum t
thermal power. expressed in megawatts, currentiv auth.
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL.
on/ed by the Nuclear Regulatory Cemmission.
Show the total number of hours the reactor was critical dunng the gross hours of the repc. ting penod.
- 4. N AMEPLATE RATING (GROSS MW,). The nameplate power designation of the turbme-generator m megavolt
- 13. REACTOR RESERVE SHUfDOWN HOURS. The total amperes (MVA) times the nameplate power factor of the numb. of hours durmg the ~ross hours of reporting turhme generator.
peno. hat the reactor wa-oved from service for admir..strative or other rem... but was avadable for
- 5. DESIGN ELECTRICAL RATING tNET MW ) is the e
operadon.
nommal net electrical output of the unit specified by the utility and used foi the purpose of plant design.
- 14. HOURS GENERATOR ON LINE.
Also called Service Hours. The total number of hours expresad to the near-
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MW )
e est tenth of an hour dunng the gross hours of the re-is the gross electrical outpt.t as n'asured at the output porting period that the unit operated with breakers termmals of the turbine generator during the most closed'to the station bus. These hours. plus those listed re-strictive seasonal conditions.
in Umt Shutdowns for the generatcr outage hours, should equal the gross hours in the reportmg period.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MW
).
e Maximum dependabh capacity (gross) less the normal
- 15. UNIT RESERVE SHUTDOWN HOURS. The total num-station service loads.
ber of hours expressed to the nearest tenth of an hour S. Self explanatory.
dunng the gross hours of the reporting period that the unit was remosed from service for economic or similar E"'
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MW,).
Note that this item is applicable only if
- 16. GROSS THERMAL ENERGY GENERATED (MWil).
restrictions on the power level are m ef fect. Short term (less than one month) limitations an power level need The thermal output of the nuclear steam supply system not be presented in this item.
dunng the gross hours of the reporting period, e'xpressed in megawatt hours (no decimals).
Smee this information is used co develop figures on capa-eity lost due to restrictions and because most users of the
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH).
" Operating Plant Status Report ' are pnmanly interested The electneal output of the unit measured at the output in energy actually fed to the distnbution system, it is termmals of the turbine-generator dunng the gross hours requested that this figure be expressed m MWe-Net in of the reportmg pened, expressed in megawatt hours (no spite of the fact that the figure must be denved from decimals).
MWt or percent power.
- 18. NET ELECTRICAL ENERGY GENERATED (MWH).
- 10. REASONS FOR RESTRICTIONS. IF ANY. If item 4 The gross electncal output of the unit measured at the is used, item 10 should explam why. Bnef narrative is output termmals of the turbine-ger.erator minus the nor-acceptable. Cite references as appropnate. Indicate mal station service loads during the gross hours of the whether restnetions are self-imposed or are regulatory reporting penod, expressed m megawatt hours. Negative requirements. Be as specific as possible withm space..mi-quantities should not be used. If there is no net positive tations. Plants in startup and pcwer assension test phase value for the period. enter zero (no decimals).
should be identified here.
- 11. HOURS IN REPORTING PERIOD. For umts m power "O' umts stdl m the startup and power ascension test ascension at the end of the penod, the gross nours from
- 23. phase, items 19 23 shou,d not be computed. Instead, enter the begmning of the penod or the first e!ectneal produc.
N/A in the current month column. These tive factors inm. whiche'ver corm iast. to the end of the penod.
shou!d be computed startmg at the time the umt is de-e!ared to be in sommercial operanen. The cumulative For unit. in commeraal operanon at the end of the figures m the second and third columns snould be based penod, the gross hours frem the becmmng of the penod on comn.eraal operation as a staron2 date.
1492 014
- 08% C2p am
9 m
M oO -
a&
g
,.M.
.Z. 2 I#- -
j
-j ^
v
$4-E
.a y
s s
O "o
fWW>=W j.2
.3 5. e ""
z2M Z
-;E
- t.
. <$=0 Ci'd t-
- 25
[Z-WF
$2%
=
2H 93 45-er-:~
4 L
U<
=
yA W
g
- T = e a
2 cc
=
g3 C== y m
w q
u a. a i. O N'
'w
?
-t Z
Z
=
0
~
R ~-
)4%
3 #..
y IUOtiCd100J
,- yp O
Z u.i q;Y -
M
~} = 2 C
==a t 3D5]
. SS uee<.
'dI$l$ %
2 -. Ng d. T Ca.
m
=
es see 7
m Y
d z
"=-
5 u
~GE C,
2
.'. 3 '
. u m a.
y a.m A
.c
=
- /1 as
[
. jog T@y (l.W(
Z
.hntings
?.
a h4 I $
s-
=-
ed
=
g>
g w -
- j -
j d
W a
g
'O*e
=w
- =
I-g7*
9 9 - :
.;., 9
% '; d 9
li30llI 3 $, so.f_22; 7
=
y -
J O f3-lit 'llf ill()
- - u
._' 2 = q "
2
=
= =.== c=u u
_.s
=
s
y
% - -s y a :m--
15
- 3d il
$<EXMC<CO a,c_
e, V
1 e
? ' :
= 2,
- [a 6
7 r;
T-1492 015 AQ n}D f D
D o ut J
J ooJ m
UNIT SHUTD0%NS AND POWER REDUCTIONg A @ q Pg n(W) y I.
2 INSTRUCTIONS c
This report should desenbe all plant shutdowns during the in accordance with the tab! appeanng on the report form.
report penod. U addition. it should be the source of explan.
If category 4 must be used, supply bnef comments.
anon of significant dips m average power levels. Each signi.
thant reduction in power level (greater than 20"c reduction LICENSEE EVENT REPORT *. Referer":e the appbcable m average daily power level for the precedmg 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) reportable occurrence pertaming to the outage or power should be noted, even though the unit may not have been reduction. Enter the first four parts (event year, sequential shut do".n corapletely. For'such reductions in power level, upon numler. occurrence code and report type) of the Ove l
the duration should be listed as zero. 'he method of reduction part designation cs desenbed in item 17 of Instructions for should be hsted as 4 (Other), and the Cause and Corrective Preparation of Data Entry Sheets for Licensee Event Report Action to Prevent Recurrence cclumn should explam. The (LER) File (NUREG 0161). This information may not be Cause and Corrective Action to Prevent Recurrence column immediately evident for all such shutdowns, of course, since should be used to provide any needed explanstion to fully further investigation may be required to ascertam whether or describe the etreumstances of the outage or power reduction.
not a reportable occurrence was involved.) If the outage or power reduction will not result in a reportable occurrence.
NUMBER. Thas coLmn should mdicate the sequential num-the positive indication of this lack of correlation should be ber assigned to each shutdown or signt6 cant reduction m power noted as not applicable (N/A).
for that calendar year. When a shutdown or significant power SYSTEM CODE. The system m which the outage or power reduction beCns m one report penod and ends m another, an entry should be made for both report penods to be sure reduction originated should be noted by the two digit code of all shutdowns or sigmficant power reductions are reported.
Exhibit G - Instructions for Preparation of Data Entry Sheets Until a unit has achieved its first power generation, no num-f r Licensee Event Report (LER) File (NUREG-0161).
ber should be assigned to each entr).
Systems that do not fit any existmg code should be des)na-ted XX. The code ZZ should be used for those events where DATE. This column should indicate the date of the start a system is not applicable.
of each sht.tdown or sigmriesnt power reduction. Repor.
as year. month, and day. August 14.1977 would be reported COMPONENT CODE. Select the most appropnate component as 770814. When a shutdown or significcnt power reduction from Exhibit I instructions for Preparation of Data Entry beginsin one report period and ends in another, an entry should Sheets for Licensee Event Report (LER) File (NUREG-0161 L be made for both report periods to be sure all shuthwns using the following critieria:
or significant power reductions are reported.
TYPE. Use "F" or "S" to mdicate either " Forced" or " Sche-duled." respectively, for each shutdown or significant power B.
If not a component failure, use the related component reduction. Forced shutdt *ns include those reqmred to be e g., wrong valve operated through error; list valve as imtiated by no later than the weekend following discovery component.
of an off-normal condition. It is recognized that some judg.
ment is required in categonzmg shutdowns in tlus way. In C.
If a cham of failures occurs, the first component to mal-general a forced shutdown is one that would not hase been function should be listed. The sequence cf events. includ.
completed m the absence of the condition for which coractive ing the other components which fail, should be desenbed action was taken.
under the Cause and Corrective Action to Prevent Recur-rence column.
DURATION. Self-explanatory. When a shutdown extends beyond the end of a report penod. count only the time to the Components that do not fit any existmg code should be de.
signated XXXXXX. The code ZZZZZZ should be used for end o' the report pencd and pick up the ensumg down time events where a component designation is ret applicable.
m the followmg report penods. Report duration of outages rounded to the nearest tenth of an hour to facihtate summation.
CAUSE & CORRECTIVE ACTION TO PREVENT RECUR.
The sum or ti e total outage hours plus the hours the genera-RENCE Use the columa in a narrative fashion to amphf> or tor was on ime should equal the poss hours in the reportmg P'""d explain the circumstances of the shutdown or power reduction.
The column should incluce the specific cause for each shat-down or stemticant power reduction and the immediate and REASON. L.ategon/e ns lenei demnanon in accordance with the table appearme un the report form. If eategory H contempiated long term corrective action taken, if appropn.
This column should also be used for a description of the ate.
must N used. surri) boet s"mment t maior safety.related corrective maintenance performed dunng METHOD OF SHUTTING D0%N THE REACTOR OR the outag or power reduction including an idennfication of REDUCING POWER.
Caicennee m number designation the entical pa:h acunty and a report of any smgle release et radioactivity or eccle radiation exposure spe ifically assoco I%ie that this ditters trom the LJison L'ectne Institute ated with the outage which accounts for more than 10 persent WEh defininons of "Forsed Parnal Outase" and "Seb, of the allowable annual values.
e aled Partial Outage.
F oi these:c w iII uso a shange or For long textual reports contmue narrative on separate paper
.0 MW a3 the nreak pomt I. i fanze: pow e: reactors. 30 M%
anJ. 'e:ense the shutdown or power redustion ion tho
- s to > unall a shanze to a mant t spianaltom na rratise 1492 016 c
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL iMWe-Net)
(MWe-Neti i
17 2
18 3
19 4
20 5
21 6
22 7
23 8
24 9
25 10 26 II 27 12 28 13 29 14 30 15 31 16 INSTRUCT 10NS On this format.!:sr the averace daily unit power lesel in MWe Net for each day in the reportine month. Compute to the nearest whole megawait.
p>! 7 3 1492 017
- 19. UNIT SERVICE FACTOR. Compute by dividmg hours the generator was on hne tium 14) by the gross heurs m the reporting period (item 11). Express as percent to the nearest tenth of a percent. Do not include reserve shut-down houis in the calculation.
- 20. UNIT AVAILABILITY FACTOR. Compute by dividing the unit available hours litem 14 plus item 15) by tne gross hours in the reporting period (item 11). Express as percent to the nearest teath of a percent.
- 21. UNIT CAPACITY FACTOR (USING SIDC NET). Com-pute by disiding net electrical energy generated litem IS) by the product of maximum dependable capacity titem
- 7) times the gross hours in the reporting period Iitem 1I).
0 Express as percent to the nearest te' nth of a percent.
O
- 22. UNIT CAPACITY FACTOR (USING DER NET). Com-pute as in item 21. substituting design electrical rating (item 5) for maximum dependable capacity.
- 23. UNIT FORCED OUTAGE RATE. Compute by disidmg the total forced outage hours (from the table in Umt Shutdowns and Power Reductions) by the som of hours generator en line (item 14) plus total forced outage hours (from the table in Unit Shutdowns and Pov.er Reductionst.
Express as percent to the nearest tenth of a percent.
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 SiONTHS (TYPE. DATE. AND DURATION OF EACH). Include type (refueling. mamtenance. other), proposed date of start of shutdown. and proposed length of shutdown.
It is recognized that shutdowns may be scheduled between reports and that this item may not be allinclusive. Be as accurate as possible as of the date the report is prepared.
This item is to b( prepared each month and updated if appropnate until the actual shutdown occurs.
- 25. Self. explanatory.
- 26. Self-explanatory. Note however, that this mformation is requested for all umts m startup and power ascension test status and is not required for umts already in com-mercial opeianon.
TEST STATUS is der.ned as that period followmg ini-tial entieahty during which the unit is tested at succes-snely higher outputs. culminating with operation at full power for a sustamed penod and complet.on of war-rant) iuns.
Fol!owing t!us phase. the unit is generaih conudered hv the utihty to be available for commerual operation INe of CO%tNtERCIAL OPERATION is defined as the date that the unit was declared by the utthty owner to be available for the regular prod:.etion of electricity.
usually related to the satisfactory completion of quaii-tication tests as specirled m the pur.hase contract and to the accountme poke:es and prac ices of the unht) 1492 OW