ML19210A233
| ML19210A233 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/30/1975 |
| From: | Arnold R METROPOLITAN EDISON CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML19210A234 | List: |
| References | |
| GQL-1557, NUDOCS 7910240947 | |
| Download: ML19210A233 (1) | |
Text
.
E JR' JF /Jd!0RMAL OCCURRENCE /J:D,
. :10Eur NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL (TEMPORARY FORM)
CONTROL NO: 10473 FILE: II;0IDE!TE REPO'T FI!
FROMietrocolitan Edison Co.
DATE OF DOC DATE REC'D LTR TWX RPT OTHER Urno 9-30-75 10-3-75 XXX T0:
ORIG CC OTHER SENT AEC PDR XXX XXX NRC 1 Sioned 0
SENT LOCAL PDR CLASS UNCLASS PROP lNFO INPUT NO CYS REC'D DOCKET NO:
XXX 1
Sn-29n DESCRIPTION: Letter Re. their letter on 9-9-75 ENCLOSURES:
Letter trans the following.....
lonroutine 30-Day Report 4 75-07(Follow-Vo) on 3-15-75, Concerning the seismic adequacy of two amergency feedwater valves and two maih steam
/al ves.......
(1 Copy Enclosure Received)
PLANT NAME:
Three Mile Island #1 FOR ACTION /INFORT ATIO$
SAB 10-7-75 BUTLER (L)
SCHWENCER (L) ZIEM ANN (L)
REG AN (E) Azid W/ Copies W/ Copies W Copies W/ Copies W/a c.c)iss CLAR K (L)
STOLZ (L)
DICKER (E)
LE AR (L)
W/ Cooics W/ Cocies W/ Copies W/ Copies PAR R (L)
VASSALLO (L' KNIGHTON (E)
SPELS DO NOT RE3IOT.7 W/ Copies W/ Copies W/ Copics W/ Copies KNIEL (L)
PURPLE (L)
YOUNGB LOOD (E)
ACKNCE.~LEDGED W/ Copics U/ Copics W/ Copics W/ Cop.ies INTERNAL DISTRIBUTION M GFit0 TECH REVIEW DENTON LIC ASST A/T IN D
)OGC PCOM P-506A pSCHROEDE PI " GRIMES R. DIGGS (L)
B R AITM AN NiiC P0:4 f
- MACCARY GAMMILL H. GE ARIN (L)
SALTZMAN GOSSICK/ST AF F KNIGHT K ASTN E R E. GOULBOURNE (L)
ME LTZ CASE PAWLICKI BALLARD P. KREUTZER (E) f G! AM BUSSO SHAO SPANGLER J. LEE (L)
PLANS BOYD
- /STELLO M. RUSrG20CK (L)
MCDONALD MOORE (L)
- HOUSTON ENVIRO S. REED (E)
CHAPMAN
- f NOVAK MULLER M. SERVICE (L)
DUBE (Ltr)
DEYOUNG (L) f SKOVHOLT (L)
ROSS DICKER S. SHEPPARD (L)
E. COUPE GOLLER (L) (Ltr) lPPOLITO KNIGHTON M. SLATER (E)
PETERSON f
P. CO L LIN S
/TEDESCO YOUNGBLOOD H. SMITH (L)
HARTFIELD (2)
DENISE J. COLLINS REGAN S. TEETS (L)
KLECKER REG OPR LAIN AS PROJECT LOR G. WILLI AMS (E)
EISENHUT
/'I'll E & REGION (2)
BENAROYA V. WILSON (L)
- WIGGINTON MC/PE p)
,VOLLMER H AR LESS
/R. INGRAM (L)
F. WILLI /.MS
.r STEELE M. Din *CAN G)
- li " r "
EXTERNAL DISTRIBUTICN
.e1 - L O C A.
pl - TIC (ABERNATHY) (1)(2)(10) - N ATION AL LABS 1 -- PD R SAN /L A/MY l - NSIC (BUCHAN AN) 1 - W. PENNINGTON. Rm E 201 GT 1 - BROOKH AVEN NAT LAG f
1 - G. U LRiKSON. O RN L 1 - ASLB 1 - CONSU LTANTS 1
Neston Anderson NEWM ARK /B LUM E/AG B ABI AN
.1 - AGMED (RUTH GUSSM A:
7 f
Rm B 127 GT pc-ACRS
$E:Tr TO LIC.'.SST R Ingma
--P 1 - J. D. RUNKLE'S, Rm E 201
^
- SEND ONLY TEN DAY REIORTS 29toz(o%ya 1476 278
OfU W..
" %:-r 3
1_
este no nuorss 4,
.]
METROPOLITAN EDISON COMPANY Dest OFFICE BC'* 542 RE ADING, PENNSYLV ANI A 19603 TELEPHONE 215 - 929-3601 September 30, 1975 GQL 1557'@ Q f ' %'
\\
Cc s
Director jij* !qh O pv (dp fff
\\
b U. S. Nuclear Regulatory Cc==issicn
/
4,,
Mgh3/ff.
C Division of Reacter Licensing Washington, D.C.
20555 7 '
8 pgA,.G. l
/,
g
, f /ps',
4
.s q
~.a.,,
,w.
7.,A M Y3
.D "'
b %
Mr. J. P. O'Reilly Office of Inspection & Inforce=ent, Regien l'
_/ -7 631 Park Avenue I'
N s,
King of Prussia, Pernsylvania 19hC6
Dear Sirs:
Three Mile Island Nuclear Station Unit 1 (M-1)
Operating License No. DPR-50 Docket No. 50-289 Nonroutine 30-Day Report 75-07 (Follev-Up)
As stated in our report dated September 9, 1975 please find enclosed Nonroutine 3C-Day Repcrt 75-07 (Follev-Up). Please note that cur previcus report of Septe=ber 9,1975 was incerrectly designated 75-C6.
This follev-up report deals with the seismic adequacy of two emergency feedvater valves and two main steam valves.
Sincerely, 0
/
/h R. C. a_nold Vice President RCA:CWS:tas
Enclosure:
Nenreutine 30-Day Report 75-07 (Follow-Up)
File:
20.1.1 7.7.3.6.1
, 6,c79 1
~7.J h[h