Forwards IE Insp Repts 50-321/79-26 & 50-366/79-30 on 790704-0803.No Noncompliance Noted
ML19209C996
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/30/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19209C997 List:
References
NUDOCS 7910180562
Download: ML19209C996 (2)


See also: IR 05000321/1979026

Text

d

.

  • ***%'o

.$c j y

UNITED STATES

-

8

NUCLEAR REGULATORY COMMISSION

EM

g

c,

g

r

REGION il

o

101 MARIETTA ST., N.W., SUITE 310o

. . . . . g

ATLANTA, GEORGIA 3o3o3

i

In Reply Refer To:

gg 3 01979

,

s

RII:RFR

50-321/79-26

50-366/79-30

Georgia Power Company

Atta:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

,

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by R. F. Rogers of this office

on July 4 through August 3, 1979 of activities authorized by NRC License

Nos. DPR-57 and NPT-5 for the Hatch facilities, and to the discussion of

our findings held with M. Hanry periodically during the inspection

interval.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice".

Part 2, Title 10, Code of Federal Regulations, a copy of this leti..:r and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe te be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document. If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Rcom.

I177

283

,

P

7910180

2

.

.

Georgia Power Company

-2-

gg 3 o 1979

Should you have any questions concerning this letter, we will pe glad to

discurs them with you.

Sincerely,

k.

R. C. Lewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

'

Inspection Report Nos. 50-321/79-26

and 50-366/79-30

cc w/ enclosures:

M. Manry, Plant Manager

Post Office Box 442

Baxley, Georgia 31513

C. E. Belflower

Site QA Supervisor

Post Office Box 442

Baxley, Georgia 31513

W. A. Widner

Manager-Nuclear Operations

Georgia Power Company

Post Office Box 4545

Atlanta, Georgia 30303