ML19209C996
| ML19209C996 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/30/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19209C997 | List: |
| References | |
| NUDOCS 7910180562 | |
| Download: ML19209C996 (2) | |
See also: IR 05000321/1979026
Text
d
.
- ***%'o
.$c j y
UNITED STATES
-
8
NUCLEAR REGULATORY COMMISSION
g
c,
g
r
REGION il
o
101 MARIETTA ST., N.W., SUITE 310o
. . . . . g
ATLANTA, GEORGIA 3o3o3
i
In Reply Refer To:
gg 3 01979
,
s
RII:RFR
50-321/79-26
50-366/79-30
Georgia Power Company
Atta:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
,
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by R. F. Rogers of this office
on July 4 through August 3, 1979 of activities authorized by NRC License
Nos. DPR-57 and NPT-5 for the Hatch facilities, and to the discussion of
our findings held with M. Hanry periodically during the inspection
interval.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice".
Part 2, Title 10, Code of Federal Regulations, a copy of this leti..:r and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe te be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document. If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Rcom.
I177
283
,
P
7910180
2
.
.
Georgia Power Company
-2-
gg 3 o 1979
Should you have any questions concerning this letter, we will pe glad to
discurs them with you.
Sincerely,
k.
R. C. Lewis, Acting Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
'
Inspection Report Nos. 50-321/79-26
and 50-366/79-30
cc w/ enclosures:
M. Manry, Plant Manager
Post Office Box 442
Baxley, Georgia 31513
C. E. Belflower
Site QA Supervisor
Post Office Box 442
Baxley, Georgia 31513
W. A. Widner
Manager-Nuclear Operations
Georgia Power Company
Post Office Box 4545
Atlanta, Georgia 30303
1177