Forwards IE Insp Repts 50-445/79-19 & 50-446/79-19 on 790809-10 & 13-16 & Notice of Violation
ML19209C976
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/07/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19209C977 List:
References
NUDOCS 7910180537
Download: ML19209C976 (2)


See also: IR 05000445/1979019

Text

fQg

-

'J nc

UNITED STATES

E I . s, [,3

NUCLEAR REGULATORY COMMISSION

i C

j

REGION IV

.j

S ,,%#% . . . . ,,c',5

611 RYAN PLAZA cRIVE, SulTE 1000

ARLINGTON, TEX AS 76012

epte e r 7, 1979

In Repl-

h. _#a_-_ To:

y

RIV

Docket Nc.

30- M5/79-19

30-415/79-19

1

T a -- "

'-d i 4 *4 as Gena- **g Co=pany

h

g

Jl

W

A'- -

R. .'. Gary, Executive Vice

l

"-

Presiden and General Manager

2001 1- u Tower

Da i ' " . Texas

75201

Gentle en:

This ref 2:s to the inspection conducted by Mr. L. D. Gilbert and other

me=bers of our staff coring the period August 9, 10 & 13-16, 1979, of

activutias authorized by NRC Construction Permits No. CPPR-126 and 127

for the Cc=anche Peak factility, Units No. I and.2, and to the discussion

of our findings with Mr. R. G. Tolson and other members of your staff at

the cenclusion of the inspection.

Areas examined during the inspection and out findings are discussed in

the enclosed inspection report. Within these areas, the inspection con-

sisted of selective exa=in tion of procedures and representative records,

interviews with personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your

license appear to be in nonco=pliance with Appendix B to 10 CFR 50 of

the NRC Regulations, " Quality Assurance Criteria for Nuclear Power Plants."

The ites of noncompliance and references to the pertinent requirements

are identified in the enclosed Notice of Violation.

This notice is sent to you pursuant to the provisions of Section 2.201

of the. NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office, with-

in 30 days of your receipt of this notice, a written state =ent or expla-

nation in reply including:

(1) corrective steps which have been taken by

you, and the results achieved; (2) corrective steps which will be taken

to avoid further noncompliance; and t3) the date when full compliance

will be achieved.

1177

H 6

_

9

._

_ . _ . . _ _ _ _ _ . _ _ _ _ _

,

Texas Uti'4 ties Generating

Compan-

2

September 7,1979

We ha.e also an-4 ed the actions you have taken with regard to a previously

iden-d#" s insp ec-' -

  1. '

"d

g.

The status of this item is identified in

para -

- 2 of the enclosed report.

Cna new ur:resolv= 2 '-=- is identified in paragraph 6.

In a--- + - e with Section 2.790 of the NRC's " Rules of Practice," Part

2,

' ~= 10. Code of Feh 1 Regulations, a copy of this letter and the

enclose "-=pe-

repor vill be placed in the NRC's Public Document

-#

' = report contains any information that you believe to be

Roc-

p rop ri- -

j , it is necessary that you submit a written application to

this c"'"-a, vi-'d - 20 days of the date of this lette.r, requesting that

such ' = - tien be withheld from public disclosure. The application must

include a full statement of the reasons why it is cl _imed that the

iafor:ation is proprietary. The application should be prepared so that

any prop-ietary information identified is contained in an enclosure to

the a-Ocation, since the application without the enclosure will also be

place in che Public Document Roc .

If we do not hear from you in this

regard vi:hin the specified period, the report will be placed in the

Public "socumenc Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

/L'

'

s __

W. C. Seidl

Chief

Reactor Cons-ruction and

Engineering Support Eranch

Enclosures:

1.

Appendix A, Notice of Violation

2.

IE Inspection Report No. 50-445/79-19

. <. y'a

hi;

50-446/79-19

D 6' h gdh % y@$iik

V S $ $

LA B

cc: w/ enclosures

1

Texas Utilities Generating Company

Atta:

Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas

75201

1177 ll7