Text
>* * *0v9'o h
UNITED STATES x,,,
g NUCLEAR REGULATORY COMMISSION
..r REGION 111 o,
f 799 ROOSEVELT ROAD 6
b GLEN ELLYN. ILLINOIS 60137 o
4u' e,u 6
Docket No. 50-546 Docket No. 50-547 Public Service of Indiana ATIN:
Mr. S. W. Shields Vice President - E'ectric System 1000 East Main Street Plainfield, IN 46168 Gentlemen:
The enclosed IE Circular No. 79-20, is forwarded to you for information.
No written response is required. Should you have any questions related to your understanding of this matter, please contact this office.
Sincerely, CL_, A g M ames'G. Kep ler Director
Enclosure:
IE Circular No. 79-20 cc w/ enc 1:
Mr. R. M. Brown, Construction Project Superintendent Central Files Director, FRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC LeBoeuf, Lamb, Leiby & MacRae Mr. Dave Martin, Office of the Attorney General li 034 e'
4910110
~
i
Accession No.: 7908220118 SSINS No.: 6830 UNITED STATES NUCLEAR REGULATORY COMMISSION Y
[]
~ K yJ]!
k-0FFICE OF INSPECTION AND ENFORCEMENT 6,
WASHINGTON, D. C.
20555 Septsaber 24, 1979 IE Circular No. 79-20 FAILURE OF GTE SYLVANIA RELAY, TYPE PM BULLETIN 7305, CATALOG 5U12-11-AC WITH A 120V AC COIL Description of Circumstances:
During inspection of relays'in the Engineered Safeguards Actuation S.gstem a Metropolitan Edison Three Mile Island Nuclear Station Unit #1, reby 62X2B/RCIA failed to drop out when the coil was deenergized. The failed relay would not prevent component starting but would have reduced the 2 of 3 coincidence logic to 2 of 2, affecting Decay Heat Closed Cooling Pump A and Nuclear Services Closed Cooling Pump A or B.
The cause for failure was attributed to a notch in the armature operating rod. The notch occurs where the rod vibrates against the magnet assembly due to coil hum. A review of the history of this component indicates that similar relays failed during 1977 through 1979 at least one of which was attributed to notching.
An inspection of forty-eight (48) relays by this licensee indicated that twenty-five (25) of th3 relays had detectable notches ranging from 0.001 to 0.003 inches deep.
Recommended Actions for Licensees' Consideration:
1.
Ensure thh all GTE Sylvania Relays Type PM Bulletin 7305, with a 120V AC Coil used in or affecting the operation of safety-related equipment are examined to ensure that the armature operating rod is not notched and is operating freely.
2.
Relays found with detectable notches on the operating rod should be corrected.
If correction cannot be accomplished then administrative controls should be initiated to assure demonstrated operation until the relay condition is corrected.
No written response to this Circular is required.
If you require additional information regarding this subject, contact the Director of the appropriate NRC Regional Office.
Enclosure:
List of IE Circulars
.- Issued in the Last 6 Months L
1 l'
i 035
IE Circular No. 79-20 Enclosure September 24, 1979 Page 1 of 2
~
LISTING OF IE CIRCULARS ISSUED IN LAST SIX MONTHS Circular Subject Date of Issued to po.
Issue 03 Inadequate Guard Training-2/23/79 All Holders of Qualification and Falsified and applicants Training Records for Special Nuclear Material Licenses in Safeguards Group I 79-04 Loose Locking Nut On 3/16/79 All Holders of Limitorque Valve Reactor OLs or cps Operators 79-05 Moisture Leakage In 3/20/79 All Holders of Stranded Wire Conductors Reactor OLs or cps 79-06 Failure to Use Syringe 4/19/79 All Holders of and Bottle Shields in Medical Licensees Nuclear Medicine except teletherapy licensees 79-07 Unexpected Speed Increase 5/2/79 All Holders of of Reactor Recirculation BWR OL's or CP's MG Set Resulted in Reactor Power Increase 79-08 Atten.,)ted Extortion - Low 5/18/79 All Fuel Facilities Enriched Uranium Licensed by NRC 79-09 Occurrences of Split or 6/22/79 All Materials Punctured Regulator Diaphragms Priority I, Fuel In Certain Self Contained Cycle and Operating Breathing Apparatus Reactor Licensees 6/26/79 All Power Reactor 79-10 Pipefittings Manufactured from Unacceptable Material Licensees with a CP ar.d/or OL 79-11 Design / Construction 6/27/79 All Applicants Interface Problem for, and Holders of Power Reactor cps MWf'ljd$
11~1 036
IE Circular No. 79-20 Enclosure September 24, 1979 Page 2 of 2 LISTING OF IE CIRCULARS ISSUED IN LAST SIX MONTHS Circular Subject Date of Issued to ho.
Issued 79-12 Potential Diesel Generator 6/28/79 All Power Reactors Turbocharger Problem Operating Facilities and all Utilities having a CP 79-13 Replacement of Diesel 7/10/79 All Power Reactor Fire Pump Starting Operating Facilities Contactors End all Utilities hving a CP 79-14 Unauthorized Procurement and 7/13/79 All Medical Licensees Distribution of XE-133 except Teletheraphy Medical Licensees and to all Radiopharmaceu-tical Suppliers 79-15 uursting of High Pressure Hose 8/8/79 All Materials Priority I, and Malfunction of Relief Fuel Cycle and Operating Valve "0" Ring in Certain Self-Power Reactor Licensees Contained Breathing Apparatus 79-16 Excessive Radiation Exposures 8/16/79 All Radiography To Members Of The General Public Licensees And A Radiographer 79-17 Contact Problem in SB-12 8/14/79 All Power Reactor Switches on General Electric Licensees with a CP Company Metalciad Circuit and/or OL Breakers 79-18 Proper Ir sta11ation of 9/10/79 All Holders of a Target Rock Safety-Relief Power Reactor OL Valves or CP 79-19 i.oose Locking Devices on 9/13/79 All Power Reactor Ingersoll-Rand Pumps Operating facilities and all utilities having a CP MLME
\\,
\\