ML19209B906
| ML19209B906 | |
| Person / Time | |
|---|---|
| Site: | Bailly |
| Issue date: | 09/24/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shorb E NORTHERN INDIANA PUBLIC SERVICE CO. |
| References | |
| NUDOCS 7910110133 | |
| Download: ML19209B906 (1) | |
Text
7 /C am'o, UNITED STATES
^ 'n NUCLEAR REGULATORY COMMISSION
<aE REGION 111 o
-v[e#
799 ROOSEVELT ROAD g
GLEN ELLYN. ILLINOIS 60137 g
Docket Nc. 50-367 Northern Indiana Public Service Company ATTN:
Mr. Eugene M. Shorb Senior Vice Pres.ident 5265 Hohman Avenue Hammond, IN 46325 Gentlemen:
The enclosed IE Cirtu.ar No. 79-20, is forwarded to you for information.
No written response is required. Should yca have any questions related to your understanding of this matter, ple;; se contact this office.
Sincerely, James G. Kepp er Lirector
Enclosure:
IE Circular No. 79-20 cc w/ encl:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General 7910110 / h q
1'~1 013
Accession No.: 7908220118 5 SINS No.: 6830 UNITED STATES
-q n$
NUCLEAR REGULATORY CORiISSION i
OFFICE OF INSPECTION AND ENFORCEMENT w
'a J L6 WASHINGTON, D. C.
20555 September 24, 1979 IE Circular No. 79-20 FAILURE OF GTE SYLVANIA RELAY, TYPE PM BULLETIN 7305, CATALOG SU12-11-AC WITH A 120V AC COIL Description of Circumstances:
During inspection of relays'in the Engineered Safequards Actuation System at Metropolitan Edison Three Mile Island Nuclear Station Unit #1, relay 62X2B/RCIA failed to drop out when the coil was deenergized. The failed relay would not prevent component starting but would have reduced the 2 of 3 coincidence logic to 2 of 2 affecting Decay Heat Closed Cooling Pump A and Nuclear Services Closed Cooling Pump A or B.
The cause for failure was attributed to a notch in the armature operating rod. The notch occurs where the rod vibrates against the magnet assembly due to coil hum. A review of the history of this component indicates that similar relays failed during 1977 through 1979 at least one of which was attributed to notching. An inspection of forty eight (48) relays by this licensee indicated that twenty-five (25) of the relays had detectable notches ranging from 0.001 to 0.003 inches deep.
Recommended Actii ns for Licensees' Consideration:
1.
Ensure that all GTE Sylvania Relays Type PM Bulletin 7305, with a 320V AC Coil used in or affecting the operation of safety-related equipment are examined to ensure that the armature operating rod is not notched and is operating freely.
2.
Relays found with detectable notches on the operating rod should be corrected.
If correction cannot be accomplished then administrative controls should be initiated to assure demonstrated operation until the relay condition is corrected.
No written response to this Circular is required.
If you require additional information regarding this subject, contact the Director of the appropriate NRC Regional Office.
Enclosure:
List of IE Circulars
. Issued in tne Last 6 Months i
L l1 014 i
IE Circular No. 79-20 Enclosure September 24, 1979 Rage 1 of 2 LISTING 0F IE CIRCULARS ISSUEC IN
)D M LAST SIX HONTHS dJ a QB Circular Subject Date of Issued to yo.
Issue 03 Inadequate Guard Training-2/23/79 All Holders of Qualification and Falsified and applicants Training Records for Special Nuclear Material Licenses in Safeguards Group I 79-04 Loose Locking Nut On 3/16/79 All Holders of Limitorque Valve Reactor OLs or cps Operators 79-05 Moisture Leakage In 3/20/79 All Holders of Stranded Wire Conductors Reactor OLs or CPc 79-06 Failure to Use Syringe 4/19/79 All Holders of and Bottle Shields in Medical Licensees Nuclear Medicine except teletherapy licensees 79-07 Unexpected Speed Increase 5/2/79 All Holders of of Reactor Recirculation BWR OL's or CP's MG Set Resulted in Reactor Powar Increase 79-08 Attempted Extortion - Low 5/18/79 All Fuel Facilities Enriched Uranium Licensed by NRC 79-09 Occurrences of Split or 6/22/79 All Materials Pnnctured Regulator Diaphragms Priority I, Fuel In Certain Self Contained Cycle and Operating Breathing Apparatus Reactor Licensees 6/26/79 All Power Reactor 79-10 Pipefittings Manufactured from Unacceptable Material Licensees with a CP and/or OL 79-11 Design / Construction 6/27/79 All Applicants Interface Problem for, and Holders of Power Reactor cps
) ',
\\0
IE Circular No. 79-20 Enclosure September 24, 1979 Page 2 of 2
%gI O
LISTING OF IE CIRCULARS ISSUED IN
.L N,
LAST SIX MONTHS a
Circular Subject Date of Issued to ho.
Issued 79-12 Potential Diesel Generator 6/28/79 All Power Reactors Turbocharger Problem Operating Facilities and all Utilities having a CP 79-13 Replacement of Diesel 7/10/79 All Power Reactor Fire Pump Starting Operating Facilities Contactors and all Utilities having a CP 79-14 Unauthorized Procurement and i/13/79 All Medical Licensees Distribution of XE-133 except Teletheraphy Medical Licensees and to all Radiopharmaceu-tical Suppliers 79-15 Bursting of !!igh Pressure Hose 8/8/79 All Materials Priority I, and Malfunction of Relief Feel Cycle and Operating Valve "0" Ring in Certain Self-Power Reactor Licensees Contained Breathing Apparatus 79-16 Excessive Radiation Exposures 8/16/79 All Radiography To Hembers Of The General Public Licensees And A Radiographer 79-17 Contact Problem in SB-12 8/14/79 All Power Reactor Switches on General Electric Licensees with a CP Company Metalclad Circuit and/or OL Breakers 79-18 Proper Installation of 9/10/79 All Holders of a Target Rock Safety-Relief Power Reactor OL Valves or CP 79-19 Loose Locking Devices on 9/13/79 All Power Reactor Irgersoll-Rand Pumps Operating facilities and all utilities having a CP
\\z
\\
D\\6