Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J3141999-10-15015 October 1999 Requests Emergency Publication of Document Entitled South Carolina Electric & Gas Co;Vc Summer Nuclear Station,Environ Assessment Transmitted on 991015 to Ofc of Fr for Publication ML20217J3281999-10-15015 October 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re Application for Exemption from Requiremets of 10CFR50,Section 50.60(a) for VC Summer Nuclear Station ML20217F8851999-10-0808 October 1999 Forwards Insp Rept 50-395/99-06 on 990801-0911.One Violation Occurred Being Treated as NCV RC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models1999-09-28028 September 1999 Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models RC-99-0181, Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment1999-09-21021 September 1999 Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment ML20212C5091999-09-15015 September 1999 Forwards Anticipated Schedule for Operator Licensing Exams for Sce&G.Util Requests That NRC Prepare Exams on Encl RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety1999-09-15015 September 1999 Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211Q8911999-09-0101 September 1999 Sumbits Summary of Training Managers Conference on Recent Changes to Operator Licensing Program.Meeting Covered Changes to Regulations,Exam Stds,New Insp Program & Other Training Issues.List of Attendees Encl RC-99-0177, Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.111999-08-31031 August 1999 Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.11 RC-99-0173, Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr1999-08-31031 August 1999 Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr ML20211L5181999-08-30030 August 1999 Forwards Insp Rept 50-395/99-05 on 990620-0731.One Violation Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20211H2481999-08-25025 August 1999 Forwards Four Controlled Copies of Amend 43 to Physcial Security Plan. Summary of Plan Changes, Are Included as Part of Each Controlled Copy.Encls Withheld Per 10CFR73.21 05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet1999-08-24024 August 1999 Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed RC-99-0171, Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors1999-08-23023 August 1999 Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors RC-99-0152, Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G1999-08-19019 August 1999 Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G RC-99-0164, Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)1999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d) ML20210Q4851999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at VC Summer.Requests Info Re Individuals Who Will Take Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML20210R5501999-08-0505 August 1999 Ack Receipt of 990707 Response to NCVs Identified on 990607 Re Activities Conducted at VC Summer.Informs That After Consideration of Basis for Denial of NCV 50-395/99-03, Concluded,For Reasons Stated,That NCV Occurred RC-99-0156, Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm1999-08-0404 August 1999 Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-19881999-07-26026 July 1999 Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 ML20210B7451999-07-22022 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1 & Rev 1,suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210E3771999-07-16016 July 1999 Forwards Insp Rept 50-395/99-04 on 990509-0619.One Violation Being Treated as Noncited Violation RC-99-0127, Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-021999-07-0707 July 1999 Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-02 RC-99-0129, Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist1999-07-0707 July 1999 Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld1999-07-0707 July 1999 Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld ML20210B7111999-07-0606 July 1999 Provides Summary of 990701 Meeting with Sce&G in Atlanta, Georgia Re Recent Virgil C Summer Refueling Outage & Other Items of Interest.List of Meeting Attendees & Licensee Presentation Handouts Encl RC-99-0114, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation1999-06-30030 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation ML20195H5861999-06-0707 June 1999 Confirms 990604 Telcon Between J Proper & R Haag Re Meeting Scheduled for 990701 in Atlanta,Ga,To Discuss Plant Refueling Outage & Items of Interest ML20207H5241999-06-0707 June 1999 Forwards Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207D1881999-05-28028 May 1999 Informs That Effective 990524,K Cotton Assigned as Project Manager,Project Directorate II-1,for Virgil C Summer Nuclear Station 05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)1999-05-17017 May 1999 Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) RC-99-0104, Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy1999-05-13013 May 1999 Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy RC-99-0105, Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station1999-05-13013 May 1999 Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station 05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components1999-05-12012 May 1999 Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components ML20206L5121999-05-11011 May 1999 Informs That NRC Reorganized,Effective 990328.Reorganization Chart Encl ML20206P5771999-05-0707 May 1999 Informs That During 980519 Telcon Between T Matlosz & G Hopper,Arrangements Were Made for Administration of Licensing Exam at Virgil C Summer Nuclear Station During Wk of 990927 RC-99-0080, Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective1999-05-0606 May 1999 Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective RC-99-0097, Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.111999-05-0606 May 1999 Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.11 RC-99-0092, Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI1999-05-0303 May 1999 Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI RC-99-0090, Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b1999-04-29029 April 1999 Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b ML20206E1681999-04-29029 April 1999 Informs That FERC & NRC Will Conduct Category I Svc Water Pond (Swp) Dam Insp at Facility on 990610 ML20206P5021999-04-26026 April 1999 Forwards Insp Rept 50-395/99-02 on 990214-0327.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR 05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl1999-04-12012 April 1999 Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl ML20205T2311999-04-0909 April 1999 Informs That on 990318,A Koon & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Schedules for Wk of 000807 for Approx Eight Candidates ML20205G4181999-04-0101 April 1999 Advises That 970725 Application & Affidavit Which Submitted, WCAP-14932, Probabilistic & Economic Evaluation of Reactor Vessel Closure Head Penetration Integrity for Plant, Will Be Withheld from Public Disclosure,Per 10CFR2.790(a)(4) RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)1999-04-0101 April 1999 Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models1999-09-28028 September 1999 Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models RC-99-0181, Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment1999-09-21021 September 1999 Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment ML20212C5091999-09-15015 September 1999 Forwards Anticipated Schedule for Operator Licensing Exams for Sce&G.Util Requests That NRC Prepare Exams on Encl RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety1999-09-15015 September 1999 Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety RC-99-0177, Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.111999-08-31031 August 1999 Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.11 RC-99-0173, Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr1999-08-31031 August 1999 Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr ML20211H2481999-08-25025 August 1999 Forwards Four Controlled Copies of Amend 43 to Physcial Security Plan. Summary of Plan Changes, Are Included as Part of Each Controlled Copy.Encls Withheld Per 10CFR73.21 05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet1999-08-24024 August 1999 Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed RC-99-0171, Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors1999-08-23023 August 1999 Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors RC-99-0152, Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G1999-08-19019 August 1999 Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G RC-99-0164, Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)1999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d) RC-99-0156, Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm1999-08-0404 August 1999 Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-19881999-07-26026 July 1999 Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 RC-99-0129, Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist1999-07-0707 July 1999 Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld1999-07-0707 July 1999 Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld RC-99-0127, Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-021999-07-0707 July 1999 Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-02 RC-99-0114, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation1999-06-30030 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation 05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)1999-05-17017 May 1999 Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) RC-99-0104, Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy1999-05-13013 May 1999 Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy RC-99-0105, Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station1999-05-13013 May 1999 Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station 05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components1999-05-12012 May 1999 Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components RC-99-0097, Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.111999-05-0606 May 1999 Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.11 RC-99-0080, Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective1999-05-0606 May 1999 Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective RC-99-0092, Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI1999-05-0303 May 1999 Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI RC-99-0090, Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b1999-04-29029 April 1999 Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b 05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl1999-04-12012 April 1999 Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)1999-04-0101 April 1999 Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) RC-99-0066, Submits Rept of Status of Decommissioning Funding (RR-1950), for Vsns Per 10CFR50.751999-03-31031 March 1999 Submits Rept of Status of Decommissioning Funding (RR-1950), for Vsns Per 10CFR50.75 ML20205B9981999-03-29029 March 1999 Informs That Authority & Sce&G Has Ownership Interests of one-third & two-thirds,respectively in VC Summer Nuclear Station.Operating License Scheduled to Expire in 2022.Rept Addresses Decommissioning Cost Estimates & Financing RC-99-0054, Forwards Rev 2 to VC Summer Nuclear Station Training Simulator Quadrennial Certification Rept,1996-99, Per 10CFR55.45(b)(5)(ii)1999-03-22022 March 1999 Forwards Rev 2 to VC Summer Nuclear Station Training Simulator Quadrennial Certification Rept,1996-99, Per 10CFR55.45(b)(5)(ii) RC-99-0053, Requests That Implementation Date of Proposed TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear (Beacon) Be Extended. Util Requests 120 Day Time Frame to Perform Initial Beacon Calibrs During Cycle 121999-03-22022 March 1999 Requests That Implementation Date of Proposed TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear (Beacon) Be Extended. Util Requests 120 Day Time Frame to Perform Initial Beacon Calibrs During Cycle 12 RC-99-0048, Informs That Util Has Implemented Policy That Requires All Personnel Granted Unescorted Access to Vsns Satisfactorily Complete Test on Site Specific Info1999-03-10010 March 1999 Informs That Util Has Implemented Policy That Requires All Personnel Granted Unescorted Access to Vsns Satisfactorily Complete Test on Site Specific Info ML20207J5661999-02-16016 February 1999 Requests That Proprietary Rev 1 to WCAP-14932 Re Rv Closure Head Penetrations Integrity for VC Summer Nuclear Plant,Be Withheld from Public Disclosure,Per 10CFR2.790(b)(4) RC-99-0026, Provides Response to NRC RAI Re TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear1999-02-0505 February 1999 Provides Response to NRC RAI Re TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear RC-99-0023, Informs That in Response to GL 97-06,SCE&G Informed NRC of Plan to Perform Secondary Side Examination Scheduled for Refueling Outage RF-11.SCE&G Has Decided to Defer Secondary Side Insp of Sg.Reasons for Change of Plan Listed1999-02-0101 February 1999 Informs That in Response to GL 97-06,SCE&G Informed NRC of Plan to Perform Secondary Side Examination Scheduled for Refueling Outage RF-11.SCE&G Has Decided to Defer Secondary Side Insp of Sg.Reasons for Change of Plan Listed 05000395/LER-1998-009, Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated1999-01-28028 January 1999 Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated RC-99-0015, Forwards Amend 16 to Training & Qualification Plan,Per 10CFR50.54(p).Summary of Changes,Encl1999-01-22022 January 1999 Forwards Amend 16 to Training & Qualification Plan,Per 10CFR50.54(p).Summary of Changes,Encl RC-99-0005, Responds to 980908 RAI Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations1999-01-15015 January 1999 Responds to 980908 RAI Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations RC-98-0225, Forwards Rev 41 to EP-100, Radiation Emergency Plan. List of Changes by Page Number Affected by Rev 41 Also Encl1998-12-14014 December 1998 Forwards Rev 41 to EP-100, Radiation Emergency Plan. List of Changes by Page Number Affected by Rev 41 Also Encl RC-98-0226, Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl1998-12-14014 December 1998 Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl RC-98-0216, Requests Extension of Response Period to 990115 to Respond to NRC 980908 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Util Intends to Utilize Industry Generic RAI Response1998-12-0404 December 1998 Requests Extension of Response Period to 990115 to Respond to NRC 980908 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Util Intends to Utilize Industry Generic RAI Response RC-98-0189, Provides Assessment Results of GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition, Per 10CFR50.54f1998-11-24024 November 1998 Provides Assessment Results of GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition, Per 10CFR50.54f RC-98-0207, Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment1998-11-11011 November 1998 Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment RC-98-0177, Informs That Sce&G Will Classify as Moderate Any Stratification Condition That Results in Total Cuf,Based on Design Basis Values Plus Any Contribution from Stratification,Of Between 0.1 & 0.71998-11-0909 November 1998 Informs That Sce&G Will Classify as Moderate Any Stratification Condition That Results in Total Cuf,Based on Design Basis Values Plus Any Contribution from Stratification,Of Between 0.1 & 0.7 RC-98-0194, Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs1998-11-0202 November 1998 Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs RC-98-0202, Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1998-10-30030 October 1998 Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions RC-98-0186, Expresses Appreciation for Opportunity to Present Topical Rept TR-104965, On-Line Monitoring of Instrument Channel Performance1998-10-26026 October 1998 Expresses Appreciation for Opportunity to Present Topical Rept TR-104965, On-Line Monitoring of Instrument Channel Performance RC-98-0185, Forwards non-proprietary Trs,Including Rev 0 to WCAP-15101, Analysis of Capsule W from Sce&G VC Summer Unit 1 Rv Radiation Surveillance Program & Rev 0 to WCAP-15103, Evaluation of PTS for VC Summer Unit 11998-10-0909 October 1998 Forwards non-proprietary Trs,Including Rev 0 to WCAP-15101, Analysis of Capsule W from Sce&G VC Summer Unit 1 Rv Radiation Surveillance Program & Rev 0 to WCAP-15103, Evaluation of PTS for VC Summer Unit 1 RC-98-0182, Responds to 980402 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs1998-10-0808 October 1998 Responds to 980402 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs RC-98-0178, Provides Comments on SALP Insp Rept 50-395/98-99.Util Ack That Station Can Enhance Future Performance Further with More Focus & Attention on Change Mgt Practices Re Plant & Procedure Changes1998-10-0505 October 1998 Provides Comments on SALP Insp Rept 50-395/98-99.Util Ack That Station Can Enhance Future Performance Further with More Focus & Attention on Change Mgt Practices Re Plant & Procedure Changes 1999-09-28
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059K4071990-09-17017 September 1990 Advises That Author Succeeded Os Bradham as vice-president, Nuclear Operations,Effective 900915.All Correspondence to Util Should Be Sent to Listed Address ML20059J9141990-09-14014 September 1990 Responds to Violations Noted in Insp Rept 50-395/90-21. Violation Occured,However Description of Violation in Error. Corrective Action:Valve XVT02803B Placed in Proper Position & Verification of Emergency Feedwater Sys Lineup Completed ML20059E2821990-08-30030 August 1990 Advises That Programmed Enhancements Per Generic Ltr 88-17 Re Loss of DHR Implemented & Mods Operable ML20059D6911990-08-29029 August 1990 Forwards Technical Rept 90-02, Seismic Activity Near VC Summer Nuclear Station for Apr-June 1990 ML20059B9541990-08-28028 August 1990 Forwards Semiannual Effluent & Waste Disposal Rept for Jan-June 1990, Per 10CFR50.36a & Sections 6.9.1.8 & 6.9.1.9 of Tech Spec ML20056B4901990-08-22022 August 1990 Discusses NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Decision on Future Insp Frequency &/Or Sys Mods Should Be Deferred Until Internal Components Could Be Inspected ML20059A2041990-08-16016 August 1990 Forwards First Semiannual fitness-for-duty Rept from 900103- 0630.Util Pleased W/Program,However,Concerned About Incorrect Test Results for Blind Performance Specimens Received from Roche Labs ML20058P6581990-08-15015 August 1990 Forwards Monthly Operating Rept for Jul 1990 & Rev 13 to ODCM for Virgil C Summer Nuclear Station.Rev Implements Changes Necessary to Permit Removal of Radiological Effluent Specs from Tech Specs as Recommended by Generic Ltr 89-01 ML20058P7681990-08-13013 August 1990 Forwards Mods to 900516 Tech Spec Change Request Re Pressurizer Code Safety Valve Setpoint Tolerance & Mode 3 Exception,Per 900713 Telcon.Changes Do Not Affect Technical Intent of 900516 Submittal Nor Alter Safety Evaluation ML20058N6961990-08-10010 August 1990 Responds to Violations Noted in Insp Rept 50-395/90-18. Corrective Action:Personnel Counseled on Procedural Compliance & Importance of Independent Verification in Maintaining Proper Sys Alignment ML20056A3441990-08-0101 August 1990 Responds to NRC Request for Further Justification Re Relocating Emergency Operations Facility to Corporate Headquarters ML20059A3691990-07-30030 July 1990 Ack Receipt of SALP Rept 50-395/90-11 & Forwards Comments on Rept ML20056A0201990-07-27027 July 1990 Provides Notification That All Actions Re Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment, Completed ML20055H9821990-07-20020 July 1990 Forwards Amend 28 to Physical Security Plan.Amend Withheld (Ref 10CFR73.21) ML17305B7681990-07-19019 July 1990 Responds to NRC NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Transmitters Identified in Item 1 from Suspect Lots Identified by Rosemount ML20044B0241990-07-11011 July 1990 Responds to Violations Noted in Insp Rept 50-395/90-15. Corrective Actions:Relay Rewired & Verified Against Design Drawings ML20055F3631990-07-10010 July 1990 Forwards Rev 1 to Plant Core Operating Limits Rept Cycle 6, as Result of Typo ML20055E0341990-07-0505 July 1990 Forwards Technical Rept 90-1, Seismic Activity Near VC Summer Nuclear Station for Period Jan-Mar 1990 ML20055D4661990-07-0303 July 1990 Forwards Amend 4 to Updated Virgil C Summer Nuclear Station Fire Protection Evaluation Rept, Effective 900301 ML20058K4421990-06-29029 June 1990 Forwards Response to Generic Ltr 90-04 Re Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions ML20043F6621990-06-0707 June 1990 Requests for Change in QA Program 10CFR50.54 & FSAR Biennial Reviews of Plant Procedures Based on Justification Contained in Proposed Change to FSAR.SAP-139 Will Be Revised Immediately Following Approval of Request ML20043D5861990-06-0101 June 1990 Forwards LERs 90-004 & 90-006 Which Respond to Violation Noted in Insp Rept 50-395/90-12.Corrective Actions:Training Conducted & Tech Spec Instruments Evaluated for Adequate Testing ML20043C5001990-05-29029 May 1990 Forwards marked-up Pages to Util 900410 Tech Spec Change Request Indicating Location of Incorrect Std Refs,Per 900419 Telcon W/Jj Hayes ML20043B7351990-05-23023 May 1990 Forwards Rev 0 to Core Operating Limits Rept,Cycle 6. ML20043A9181990-05-17017 May 1990 Forwards List Detailing Tubes in Which F* Criteria Applied During Steam Generator Tube Insp Subsequent to Fifth Inservice Eddy Current Exam.Location of Degradation Measured from Tube End on Hot/Cold Leg Up to Degradation ML20043G4621990-05-0303 May 1990 Advises That Util Will Control Operations to Abide by More Restrictive Required Shutdown Margin Curve While Awaiting NRC Approval to Place Revised Curve in Tech Specs ML20042G4741990-05-0101 May 1990 Special Rept Spr 90-003 Listing Number of Steam Generator Tubes Plugged or Repaired During Fifth Refueling Outage ML20042E1931990-04-11011 April 1990 Forwards Seismic Activity Near VC Summer Nuclear Station, Oct-Dec 1989. Several Seismic Monitoring Stations Inoperable During Reporting Period & Also During First Quarter 1990 ML20012F3551990-04-0303 April 1990 Withdraws 900321 Request for Relief from Testing RHR Containment Isolation Valves Xvg 08701 A/B at Frequency Specified in ASME Section XI Code.Meeting Requested to Discuss Util Interpretation of Testing in 10CFR50,App J ML20012E9061990-03-23023 March 1990 Submits Supplemental Response to Station Blackout Re Proper Documentation & Consistent Implementation of NUMARC 87-00 Guidance.Plant Currently Maintains Targeted Emergency Diesel Generator Reliability by Ensuring Compliance W/Tech Specs ML20012E0431990-03-23023 March 1990 Forwards Corrected Pages to Rev 26 to Radiation Emergency Plan. ML20012D9691990-03-23023 March 1990 Forwards, Sante Cooper 1989 Annual Financial Rept, South Carolina Gas & Electric 1989 Annual Financial Rept Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Plant ML20012E5881990-03-21021 March 1990 Forwards Corrected Slide to Clarify Util Current Plans Re Steam Generator Insp Plan,Per 900312 Meeting W/Nrc ML20012D8271990-03-21021 March 1990 Requests Relief from Testing RHR Containment Isolation Valves Xvg 08701 A/B at Frequency Specified in ASME Section XI Code.Valves Will Be Tested at Frequency Specified for Type a Valves in 10CFR50,App J ML20012D0371990-03-19019 March 1990 Responds to Generic Ltr 89-19 Re Design of Steam Generator Overfill Protection.Util Does Not Plan to Implement Physical Mods or Administrative Changes Since Overfill Protection Sys Meets or Exceeds Guidance in Generic Ltr ML20012D4781990-03-16016 March 1990 Forwards First Annual ECCS Evaluation Model Revs Rept,Per 881017 Rev to 10CFR50.46.Rept Identifies Several Mods to Large & Small Break LOCA Evaluation Models Used at Facility & Provides Estimated Effects of Changes on ECCS Analyses ML20012C0661990-03-0909 March 1990 Forwards Addl Info Re Natural Circulation Evaluation Program Rept,Per 900208 Telcon Request ML20012A0921990-03-0101 March 1990 Forwards Response to Generic Ltr 90-01,consisting of Completed NRC Regulatory Impact Survey Questionnaire Sheets Containing Estimates of Time Spent by Managers on Insps & Audits ML20006E3411990-02-0606 February 1990 Forwards Proprietary Addl Info,Per NRC 900104 Request,Re Util Tech Spec Change Request for Elimination of Resistant Temp Detector Bypass Manifold sys,marked-up Tech Spec Pages & Block Diagrams.Encls Withheld ML20006D1241990-02-0101 February 1990 Requests Approval,Per 10CCFR50.55a,for Use of Alloy 690 Matl in Fabricating/Use of Steam Generator Plugs During Upcoming Refueling Outage.Alloy 690 Currently code-approved Matl for Steam Generator Tubing Based on Corrosion Resistance ML20011E1211990-01-31031 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Util Currently Performs Visual Insps & Dredgings of Svc Water & Circulating Water Intake Structures Once Each Refueling Cycle ML20006D2951990-01-26026 January 1990 Forwards WCAP-12464, VC Summer Nuclear Station Natural Circulation Evaluation Program Rept. Rept Provides Info to Resolve Branch Technical Position Rsb 5-1, Design Requirements for RHR Sys for Facility,Per 890719 Telcon ML20006B1211990-01-24024 January 1990 Forwards Technical Rept 89-3, Seismic Activity Near VC Summer Nuclear Station for Period Jul-Sept 1989. ML20006A7191990-01-19019 January 1990 Provides Update of long-term Corrective Action for 890711 Loss of Offsite Power.Installation of Voltage Regulator on 230/7.2 Kv Emergency Auxiliary Transformer Neither Required Nor Any Appreciable Benefit Derived from Installation ML20006A5521990-01-16016 January 1990 Advises That Util Will Validate Adequacy of Any Sys Used for Periodic Inservice Insp & Will Upgrade,As Required,Eddy Current Test Methods Used as Better Methods Developed & Validated for Commercial Use,Per 900111 Discussion ML20005H0791990-01-12012 January 1990 Advises That Response to NRC Request for Addl Info Re L* Implementation Will Be Submitted by 900801 Due to Refueling Outage Schedule ML20005F1191990-01-0505 January 1990 Forwards Description of F* Application at Plant & Sample Eddy Current Lissajous Figures for 12 Steam Generator Tubes, Per 891218 Request for Extension of Application of F* Tube Plugging Criterion for Life of Steam Generators ML20005G4921990-01-0505 January 1990 Responds to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations. Bulletin & Core Shuffle Procedure Will Be Discussed Among Core Engineering Personnel in Documented Training Session ML20005F4531990-01-0404 January 1990 Forwards Application for Approval to Incinerate Oil Contaminated W/Very Low Levels of Licensed Radioactive Matls within Site Boundary of Facility ML20005F0601990-01-0303 January 1990 Forwards Justification for Continued Operation Re Pressurizer Surge Line Thermal Stratification,Per NRC Bulletin 88-011.Util Believes That Plant Can Continue Operation for at Least 20 Addl Heatup/Cooldown Cycles 1990-09-17
[Table view] |
Text
.
south CAROLINA ELECTalC & GAS COMPANY
.,,, a n ,e . . a . . . .
CotuMaiA,Sourn CAnouMA 29288 M.C.JoMMSGM
..a..o............m....
. ... u .o. .. . ~ u.
September 27, 1979 U. S. Nuclear Regulatory Commission ~~
Attn: Mr. James P. O'Reilly Director Region II 101 Marietta Street, NW Atlanta, Georgia 30303 Subj ect: V. C. Summer Nuclear Station ,'
Unit #1
- . Reported Items in Accordance with 10CFR50.55(e)
Gentlemen:
, , . . The purpose of this letter is to provide a written report of six, either
'I potential or reportable items in accordance with 10CFR50.53(e), that have been communicated to the NRC since August 31, 1979. It will also provide an up-date of previously reported items.
The report of new items is as follows:
- 1. On August 31, 1979, SCE&G identified to Region II concerns relative to Incorrect Cable Tray Solice Plates. In late September 1978, QC personnel discovered that vertical " riser" splice plates were being 7 utilized by construction to splice horizontal runs of cable tray. The cause of the problem stemmed from arbitrary substitution of the vertical splice plates for the horizontal ones on the part of construction personnel, due to the lack of horizontal plates on Site when needed.
To compound the problem, the physical configuration of the two types of splice plates are similar, with the dif ference being the horizontal plates having rolled edges for additional strength.
When discovered, a Site Nonconformance No tice (NCN) uns generated to document the problem. During the evaluation process, Engineering noted that there was not much dif ference in the two types of splice plates and suspected the use of vertical plates on horizontal runs may have provided sufficient strength. The tray manufacturer was contracted i13S 342 A
Y'p\ o
~
7910100 3 3
hr. Jases P. O'Reilly Page 2 ,
September 27, 1979 to perform tests to establish the strength of the vertical splice plates in a horizontal run. The test results were analyzed and the resulra concluded that using vertical plates in horizontal runs did not provide adequate strength. Da this basis, Engineering dispositioned the NCM on April 24, 1979, to replace the existing incorrect plates with correct ones, or add an additional vertical plate to incorrect applica-tions to provide strength.
At the time of finai disposition, the NCN was determined not to constitute a significant deficiency as it appeared the QC program adequately detected the deficiency even though the safety of operations of the Plant could have been af fected had the condition gone uncorrected.
However, during the execution of the disposition, it became apparent that a hign quantity of splice plates (approxi=ately 300) were involved in the changeout program. Thie fact became known in August, 1979, and ,
predicated SCESG actions of revaluating the discrepancy as a reportable item. The revaluation concluded that the detection of the condition by the QC program may not have been ti=ely and cay have constituted a breakdown. As such, the item was reported on August 31, 1979.
The status of this ites, at present, shows tha: the deficiencies are . totally documented by the site nonconformance control system and
_._u' "
that actions-to' correct the problem have been determined and nearing- -
completion. Based on this status, SCESG considers this report a final report for this iten.
- 2. On September 7,1979, SCESG identified to Region II a concern relative to 480 Volt Switchgear Lightning Arrestors. During a routine =eggering of a 430 volt switchgear unit before re-energi ing on 8/11/79, it was discovered that the reading was not in the 100 megohs range as reconmended by the switchgear =anufacturer. Further investigation revealed the problem was generic of all similar safety related switchgear and the causa of the probles was traced to low = egger readings of the lightning arrestors supplied to the manuf acturer by a sub-vendor. A Site Start-up Field Report (SFR) was initiated to document the nonconformance and obtain a correction. Engineering disposition of the S?2 on 8/14/79, deter =ined that the arrestors would have to be returned to the canufacturer for evaluation as to their acceptability and impact on the safety of operation of the Plant. At the point of SFR disposition, not enough information was available to conclude a reportable iten' defined in 10CFR30.55(e) enisted. The lightning arrestors .:ere raturned to the manufacturar on 8/15/79 and 9/5/79. The Region II Resident Inspector was knowledgea' ole of activities taking place relative to the arrestors and SCE&G elected to formally notify Region II on 9/7/79 that this item was potentially reportable.
The lightning arrestors were received by the manufacturer, confirmed to megger low, and forvarded to the sub-vendor for fu'ther test and evaluation. SCE&G Engineering is tentatively planning to monitor sub-vendor activities during testing and obtain results in early October, 1979.
1i35 343
Mr. James P. O'Reilly Page 3 J September 27, 1979 The test results will enable conclusions to be cade relative to problem cause, relevancy as a 10CTR50.55(e) reportable item, and corrective actions to resolve whatever problems enist. Based on the cc: rent status, this report is considered interim. A final report will be provided reflecting the conclusions drawn af ter testing the arrestors.
- 3. On September 12, 1979, SCESG identified to Region II concerns relative to ASCO NP-1 Solenoid Valves. During installation, a valve was observed to have a tag noting that the valve should not be used in applications where it would be exposed to oil base substances. Installation specifi-cations specify the use of Fel-Pro N-1000 thread lubricant which has an oil base. Construction requested on 9/ 3/79, an Engineering evaluation of solenoid valve applications predicated on the tag information and specification requirements. EEgineering personnel contac".i ASCO and *-
learned that the subject valves utillza ethylene propylet i elastomars as standard equipment. This ethylene propylene expands or swells when contacted by oil, possibly causing the . valve to fail. A determination was made to send eome Fel-Pro to ASCO for a deter =ination of its affect on the valves, and to notify the Rec,ian II Residant !aspector of a potential significant deficiency. SCESG Engineering is pursuing the results of the
~ tests, 'and -in the interimf has ~ directed Construction on 9/17/79', to dis ' '
continue the use of Fel-?ro in instrument air syste=s uith solenoids.
3ased on present status of determining whether the safety of plant operations would have been affected had this condition gone uncorrected, this report is considered interim. A final report will be provided reflecting further evaluation.
- 4. On September 13, 1979, SCESG identified to Region II concerns relative to Feedwater Check Valve and Pipe 3reak, that could have af fected the saf e operations of the Plant, had it gone uncorrected.
The evaluation of this ite: was initiated when SCELG's Architect Engineer received co=munications from the NSSS supplier on December 13, 1978. This co=nunication, based on a Rockvell Valve report, identified possible problems with a pipe rupture in the feedwahac line followed by a check valve slaa; a situation uhtch would produce a large pressure peak that could danage the integrity of the piping system. The Architect Engineer and valve supplier for SCE&G feedwater check valves (Anchor Darling), were chartered to review existing analysis and develop new data for the SCELG Plant based on the MSSS supplier inF armation. A review of the analysis on September 12, 1979, reflected problems with the SCE5G Plant in this area. The _ Region II Resident Inspector was P00R D U M i 13S $44
Mr. James P. O'Reilly ,
Page 4 September 27, 1979 notified at this point that a reportable item in accordance with .
10CFR50.55(e) existed.
Present ;tntus is that Anchor Darling is re-analyzing their
. valve perfor=ance using new parameters,and may reco= mend modifica-tions to their valve to help decrease the pressure peak. The Architect Engineer will be using the new data to do a final redesign of the piping support system. Since a course of action is established, and the design control system is to be used to perform the desiga and translate it to the field by programmatic means (Engineering Change No tice) , this report is considered a final report on this subject.
- 5. On September 13, 1979, SCELGidentifiedtoRegionIIconcernsrelative l-to Welded Hilti Bolts. At present, this item is considered potentially reportable as inspection programs are under way to identify the extent of the problem. The inspection progracs evolved because of certain specific nonconformances (documented by NCN's), that arose in recent _
nonths as follows.
. . . . =...... :: C.-_- :. : -- :- _ . ... .
a) Based on an allegation,' a Hilti bolt was discovered in a piping
~
support to have been wedged by a piece of a file. Construction QC had not detected the condition, but Engineering evaluation determined that for this specific, strength of the support was not affected and there was no af fect on the safety of operations to the Plant. The condition was docust ated for correction on DCC NCN No. 722 dated 4/25/79, and determined not reportable.
A NRC Construction Inspector on Site at the time of this occurrence
~
(Mr. 'W. Swann) was apprised of this situation (reference NRC Report 79-14). -
b) A Hilti bolt was found in a piping support, welded to the base plate and documented on DCC NCN No. 717, dated 4/23/79. This condition was detected during the normal course of inspection by the constructors QC organication and was not considered a 10CFR50.55(e) reportable item since no quality program breakdcun occurred. Mr. Swan of Region II was also apprised of this situation.
c) SCESC/QA conf arred with SCEOG/QC based on the DCC/QC finds in a) and b) above, and SCESC/QC randomly re-inspected some electrical support Hilti bolt installations. A bolt was found welded to a plate that uas not detected by prior QC inspections and a SCELG NCN No. c31, dated 6/21/79, was initiated to docu=ent the condition for correction.
At thin time, Engineering evaluation determined this item was not report:ble for the same reasons given in a) above.
BL . James P. O'Reilly -
Page 5 r September 27, 1979 The results of the three nonconformances indicated the need for further evaluation for extent. To accomplish the re-inspections, the dispositions of DCC NCN 722 and SCOLG NCN 831E, directed the Construction QC and SCE&G/QC orgar.l.:at;cas to establish re-inspection programs for piping supporcs and electrical supports respectively.
The cause of the problem has been " established as arbitrary violation of procedures to provide apparently acceptable installations in lieu of correcting problems encountered during installation. The re-inspection programs at the time this itam was reported as a potential 10CFR50.55(e) to the Region II Resident Inspector, revealed no additional welded bolts in piping supports, and si.-: welded Hilti bolts in electrical supports. The re-inspection programs are still in progress and the results will receive an Enginee' ring evaluation to determine tha aff ect on ^-
the safety of operations of the Plant, had the conditions gone uncorrected.
Basad on present status, this is an interim report. A final report will be provided upon completion of re-inspection and Engineering evaluations.
- 6. On Septamber 18, 1979, SC2iG identified to Region II concerns with 430 Voit Motor Tarmination T2pire. During inspection of a 480 volt motor in the process of termination, a QC Inspector determined'that an
~
unqualified insulating tape was being used. The tape specified was Bishop Biseal No. 3, which was purchased as safety related in 1 " wide rolls, while the tape being used was 3/4" wide. The condition was documented on a SCE5G NCN No. 770E, dated 4/9/79. The cause of the problem stemmed from the fact that the 3/4" wide Bishop 31 seal No. 3 tape was procured for Site use on non-saf ety related applications and was inadvertantly being used for this safety related application.
Efforts were made in the interim period prior to reporting to Region II to attempt to obtain qualification data on he 3/4" wide tape. This data could not be obtained. As a result, records were checked to determine if the 3/4" wide tape was ever used previous to the time it was discovered. Records could not establish usage and visual inspection was of no use since the tape on previously terminated mators had molded togeth2r. The date the 3/4" vide tape was delivered to the Site was determined, and records did establish which terminations were made between that date and the date of discovery. It was determined that four mo tors had the potential of having unqualified tape used for terminations. The NCN was dispositioned on August 29, 1979, to reterminate the suspect motors and in the interim, the 3/4" wide tape was removed from the field.
1135 546
Mr. Jaces P. O'Reilly .
Page 6 September 27, 1979 Engineering evaluation as to whether the condition could have af fected the saf ety of operations of the Plant was considered in-deter =inate since there was no means to conclude the unqualified tape would have failed. Based on this conclusion, the Region II Resident Inspector was notified.
Due to the present status of this problem, and the fact that the four questionable actor terminations are being reworked within the QA program, this is a final report of this item.
Our update of previously reported items is as follows:
- 1. Pioe Hanger and Succort Welding NochangeinthestatusrehortedAugust 31, 1979.
- 2. 7300 Series Process I & C Cards
- 21.:SCESGehas--physically verified thatt does not possess any of the faulty process cards identified in the 10CFR21 report by Westinghouse -
As su :h, a reportable item did not exist and this is the final report on this item.
- 3. Condensate Storage Tank No change in the status reported August 17, 1979.
- 4. Containment Airlock
~
No change in status reported August 17, 1979, except that the codifications have been tentatively rescheduled for November,1979 in lieu of September 1979.
- 5. Steam Generator Level Indication No change in the status reported July 10, 1979.
- 6. Pipe Succort Loadings, Velan Valves No change in the status reported August 17, 1979.
7.- RT Film Deficiencies ._
No change in che status reported June 13, 1979.
!l3S j4/
Mr. James P. O'Reilly Page 7 September 27, 1979 Documentation associated with the above items is available for NRC review during inspections at the Site. If any additional information is deemed necessary, please feel free to contact us.
Very -tp vours ,
59&UAVa} l
/,
\
\
r
~
DRM/MCJ/jls -
cc: C. J. Fritz -
G. C. Meet e 6
Inspection & Enforcement b*ashington, D C.-
bec: V. C. Su=mer E. H. Crews, Jr.
T. C. Nichols, Jr.
H. T. Babo .
O. W. Dixon, Jr.
E. Wielkopolski R. J. Hoffert NPCF/Dixon H. Radin A. A. Snith, Jr.
J. F. Algar M. B. Jones C. C. Wagoner W. L. West C. K. Brown J. M. Woods / PRS J. Skolds File 113S 348