ML19209A130

From kanterella
Jump to navigation Jump to search
Amend 18 to License DPR-70 Revising Tech Specs Re Diesel Generator Trips
ML19209A130
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/08/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19209A131 List:
References
NUDOCS 7910020604
Download: ML19209A130 (5)


Text

.

[ p **c,' \\'

u UNITED STATES Ij

,' i NUCLEAR REGULATORY COMMISSION 1- (

M E

WASHINGTON, D. C. 20555

/\\

t NM[f s, s..

PUBLIC SERVICE ELECTRIC AND GAS C0f'PANY PHILADELPHIA ELECTRIC CGl'.PAi.Y,

DELfGRVA POWER AND LIGHT C0f;PANY ATLANTIC CITY ELECTRIC C0f:P/.f.y DOCKET NO. 50-272 SALE!' NUCLEAR GENERATING STATION, UNIT N0. 1 Af'ENDf'ENT TO FACILITY OPERATING LICENSE Anendment No. 18 License No. DPR-70 1.

The fiuclear D.egulatory Connission (the Commission) has found that:

A.

The application for amendnent by Public Service Electric and Gas Conpany, Philadelphia Electric Company, Delmarva Power and Light Conpany and Atlantic City Electric Company (the licensees) dated June 14, 1979 conplies with the standards and requirenents

]f the Atonic Energy Act of 1954, as anended (the Act) and the Connission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in i onformity with the application, the provisions of the Act, an. the rules and regulations of the Connission; C.

There is reasonable assurance (i) that the activities authorized by this anendnent can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conductea in compliance with the Connission's regulations; D.

The issuance of this amendnent will not be ininical to the connon defense and security or to the health and safety of the publi'c; and E.

The issuance af this anendment is f.

accordance with 10 CFR Part 51 of the Comicsion's regulations and all applicable requirenents have been satisfica.

910020b.h 1.136 167

. 2.

Accordingly, the license is anended by changes to the Technical Specifications os indicated in the attachnent to this license anendnent, and paragraph 2.C.(2) of Facility Operating License No. DPR-70 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as r evised through Anendment No.18, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specific 3tions.

3.

This license anendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY C0!'. MISSION

]

f.

' 1kf('f2lYOL-A. Schwencer, Chief Operating Reactors Branch al Division of Operating Reactors Attachnent:

Changes to the Technical Specifications Date of Issuance: September 8,1979

\\\\36 \\b8

ATTACHf1ENT TO LICENSE AMENDMENT NO. 18 FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 Revise Appendix A as follows:

Remove Pages Insert Pages 3/4 8-4 3/4 8-4 i

i M

1136 169

ELECIT!Ckt POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.8.1.1.2 Each dicsel generator shall be demonstrated OPERABLE:

a.

At,least once per 31 days on a STAGGERED TEST BASIS by:

1.

Verifying the fuel level in its day tank.

2.

Verifying the diesel starts from ambient condition and accelerates to at least 900 rpm in < 10 seconds.

3.

Verifying the generator is synchronized, loaded to > 1400 kw, and operates for > 60 minutes.

4 Verifying the diesel generator is aligned to provide standby power to the associated vital busses.

b.

At least once per 18 months during shutdown by:

1.

Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recomendations for this class of standby service, 2.

Verifying the generator capability to reject a load of 785 + 40 kw without tripping, 3.

Simulating a loss of offsite power in conjunction with a safety injection test signal, and:

a)

Verifying de-energization of the vital busses and load shedding from the vital busses.

b)

Verifying the diesel starts from ambient condition on the auto-start signal, energizes ti.e vital busses with permanently connected loads, energizes the auto-connected emergency loads through the load sequencer and operates for > 5 minutes while its generator is loaded with the emergency loads.

D M

SALEM-UNIT 1 3/4 8-3 1136 170

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) c)

Verifying that all automatic ciesel generatcr trips, except engine overspeed, lube oil pressure low, 4KV bus differential and generator differential, are automatically bypassed ucon loss of voltage on the emergency bus and/or seiety injection actuation signal.

4.

Verifying the diesel generator operates for 1 60 minutes while loaded to 1 2665 kw.

5.

Verifying that the auto-connected loads to each diesel generator do not exceed the 2000 ' sour rating of 2750 kw.

4.8.1.1.3 The diesel fuel oil storage and transfer system shall be demonstrated OPERABLE:

a.

At least once per 31 days by:

1.

Verifying the level in each of the above required 20,000 gallon fuel storage tanks.

2.

Verifying that both fuel transfer pumps can be started and transfer fuel from the 20,000 gallon storage tanks to the day tanks.

b.

At least once per 92 days by verifying that a sample of diesel fuel from each of the above required 20,000 gallon fuel storage tanks is within the acceptable limits specified in Table 1 of ASTM 0975-68 when checked for viscosity, water and sediment.

u=mc 1136 171 SALEM-UNIT 1 3/4 8-4 Amendment No.18