Forwards IE Insp Repts 50-413/79-16 & 50-414/79-16 on 790808-10.No Noncompliance Noted
ML19208D847
Person / Time
Site: Catawba  
Issue date: 08/23/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19208D848 List:
References
NUDOCS 7910010168
Download: ML19208D847 (2)


See also: IR 05000413/1979016

Text

[b

'

'

'

UNITED STATES

e

.

8')

g

NUCLEAR REGULATORY COMMISSION

[//

,

.'

//. m

REGION 11

[f

101 MARIETT A sT., N.W.. sulTE 310o

o,

ATLANTA, GEORGI A 30303

In Rep 1y Refer To:

AUG 2 31979

RII:DKW

'

50-413/79-16

50-414/79-16

Duke Power Company

Atta:

L. C. Dail, Vice President

Design Engineering

Post Office Box 33189

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by D. K. Walters of this office

on August 8-10, 1979 of activities authorized by NRC Construction Permit

Nos. CPPR-116 and CPPR-117 for the Catawba Nuclear Plant facility, Unit

Nos. I and 2, and to the discussion of our findings held with D. G. Beam

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the. inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

One new unresolved item resulted from this inspection and is discussed

in the enclosed report. This item will be examined during subsequent

inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written applicatica within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietaty information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Foom.

q

1cj10010l&8

    • Y6

'f 0 5 3 050

.

Duke Power Company

-2-

AUG 2 3 B19

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

l slrb

C. E. Murphy,

i

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-413/79-16

and 50-414/79-16

cc w/ enclosures:

D. G. Beam, Project Manager

Post Office Box 223

Clover, South Carolina 29710

.

1058 05l