Forwards IE Insp Repts 50-321/79-25 & 50-366/79-29 on 790723-27 & Notice of Violatin
ML19208D769
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/17/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19208D766 List:
References
NUDOCS 7909290518
Download: ML19208D769 (2)


See also: IR 05000321/1979025

Text

.

[p# REG jo

UNITED STATES

I

O

'g

NUCLEAR REGULATORY COMMISSION

e

n

3,

[

$

~.'.- E

REGION 11

"

8

101 MARIETTA sT., N.W., SUITE 3100

o,

E

ATLANTA, G EoRGI A 30303

%.....o

In Reply Refer To:

RII:DGH

50-321/79-25

50-366/79-29

Georgia Power Co:pany

ATTN:

J. H. Mil.'er, Jr.

Executive Vice Presi<ent

270 Peachtree Street

.

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by D. G. Hinckley of this office on

July 23-27, 1979, of activities authorized by NRC Operating License No. DPR-57

and I.icense No. NPF-5 for the Hatch 1 and 2 facilities, and to the discussion of

our findings held with M. Manry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and vbservations by the inspectors.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further nonc om-

pliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

790920b5/[P

105426%

.

-

Alle 17197f

.

Geargia Power Company

-2-

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

[. C.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-321/79-25

and 50-366/79-29

cc w/ enc 1:

M. Manry, Plant Manager

P. O. Box 442

Baxley. GA 31513

C. E. Belflower

Site QA Supervisor

P. O. Box 442

Eaxley, GA 31513