Responds to Re Nuclear Facility.Recirculation Pump Trip Was Installed During Oct 1978 Refueling Outage
ML19208D345
Person / Time
Site: Oyster Creek
Issue date: 08/01/1979
From: Gossick L
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Hughes W
HOUSE OF REP.
Shared Package
ML19208D346 List:
References
NUDOCS 7909280266
Download: ML19208D345 (1)


Text

-

i, t.

L.,

n arc o

o UNITED STATES fm

,og y ;

  • e 3 g NUCLEAR REGULATORY COMMISSION aE WASHINGTO N, D. C. 20555 t,M I

H f

AUG 1 1979 Docket No. 50-219 The Homrable William J. Hughes United States House of Representatives Washington, D. C.

20515

Dear Congressman Hughes:

This is in response to your letter of May 29, 1979 to Chairman Hendrie, regarding the Oyster Creek Nuclear Generating Station fer your use in responding to Robert A. Gasser's letter of May 22, 1979.

Mr. Gasser's letter questions the failure of Jersey Central Power &

Light Company (JCP&L) to inste.Il a recirculation pump trip as required by the NRC.

The recirculation pump trip was installed during the 1978 refueling outage (October 1978) and has been in use since that time.

You may assure your constituent that the NRC did "see fit to require and insure" that the recirculation pump trip was installed at the Oyster Creek Nuclear Generating Station and that JCP&L did install

'~

the recirc'ilation pump trip.

Sincerely, CRIGINAL S;GNED BY R. G. SMITH lee V. Gess;ck Execuhve Ri.:.cr fer Operanens 790928 6 1034