ML19208D289

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 79-20, Failure of Gte Sylvania Relay, Type PM Bulletin 7305,Catalog 5U12-11-AC w/120 Volt Ac Coil. No Action Required
ML19208D289
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/24/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
References
NUDOCS 7909280201
Download: ML19208D289 (2)


Text

/

UNITEC STATES 8

NUCLEAR REGULs JORY COMMISSION o

g ae RECiON 11 o\\

101 MARIETTA 5), N.W., SUITE 3100 o

ATLANTA, GE 1RGIA 30303 SEP E i 1979 n g;(

In Reply Refer To:

RII:JPO Q O-3 D Florida Power Corporation Attn:

W. P. Stewart, Manager Nuclear Operations P. O. Box 14042, Mail Stop C-4 St. Petersburg, Florida 33733 Gentlemen:

The enclosed IE Circular No. 79-20, is forwarded to you for information.

No written response is required. Should you have any questions related to your understanding of this matter, please contact this office.

Sincerely,

_. _ w k

N m

James P. O'Reilly Director

Enclosures:

1.

IE Circular No. 79-20 2.

List of IE Circulars Issued in the Last six months

~

105l 348 79092609o)

SEP 2 41979 Florida Power Corporation.

cc w/ enc 1:

G. P. Beatty, Jr.

Nuclear Plant Superintendent Post Office Box 1240 Crystal River, Florida 32629

/

1051 349

.- s4,.... -.... - -.. ---.---

... ~

Accession No.: 7908220118 SSINS No.: 6830 UNITED STATES NI! CLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C.

20555 September 24, 1979 IE Circular No. 79-20 FAILURE OF GTE SYLVANIA RELAY, TYPE PM BULLETIN 7305, CATALOG SU12-11-AC WITH A 120V AC COIL Description of Circumstances:

During inspection of relays in the Engineered Safeguards Actuation System at Metropolitan Edison Three Mile Island Nuclear Station Unit #1, relay 62X2B/RCIA failed to drop out when the coil was deenergized. The failed relay would not prevent component starting but would have reduced the 2 of 3 coincidence logic to 2 of 2, affecting Decay Heat Closed Cooling Pump A and Nuclear Services Closed Cooling Pump A or B.

The cause for failure was attributed to a notch in the armature operating rod. The notch occurs where the rod vibrates against the magnet assembly due to coil hum. A review of the history of thic component indicates that similar relays failed during 1977 through 1979 at least one of which was attributed to notching. An inspection of forty-eight (48) relays by this licensee indicated that twenty-five (25) of the relays had detectable notches ranging from 0.001 to 0.003 inches deep.

Recommendeu Actions for Licensees' Consideration:

1.

Ensure that all GTE Sylvani

"-lays Type PM Bulletin 7305, with a 120V AC Coil used in or affecting the operation of safety-related equipment are examined to ensure that the armature operating rod is not notched and is operating freely.

2.

Relays found with detectable notches on the operating rod should be corrected.

If correction cannot be accomplished then administrative controls should be initiated to assure demonstrated operation until the relay condition is corrected.

No written response to this Circular is required.

If you require additional information regarding this subject, contact the Director of the appropriate NRC Regional Office.

DUPLICATE DOCUMENT Entire document previously entered into system under:

1051 350 xNo 79cgg o//g No. of pages:

m O