Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19208C611
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/12/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
References
NUDOCS 7909270136
Download: ML19208C611 (2)


Text

'

'o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

g

.r REGION 11 o,

[

101 MARIETTA ST., N.W., SUITE 3100

%'...,

  • s TE%'k ATLANTA, GEORGIA 30303 SEP 121979 In Reply Refer To:

RII:JPO QW302; Florida Power Corporation Attn:

W. P. Stewart, Manager Nuclear Operations P. O. Box 14042, Mail Stop C-4 St. Petersburg, Florida 33733 Gentlemen:

Enclosed is IF Bulletin 79-23 which requires action by you with regard to your power reactor facility (ies) with an operating license or a construction permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, h

y

> NMV James P. O'Reilly Regional Director

Enclosures:

1.

IE Bulletin No. 79-23 2.

List of IE Bulletins Issued in the Last Six Months 1050 114 7909270/36

SEP 121979 Florida Power Corporation,

cc w/ encl:

G. P. Beatty, Jr.

Nuclear Plant Superintendent Post Office Box 1240 Crystal River, Florida 32629 4

1050 115

Accession No. 7908220104 SSINS No.:

6820 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 September 12, 1979 IE Bulletin No. 79-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:

Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility. Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.

Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.

The following nameplate data applies to the equipment installed at Turkey Point:

Emergency Diesel Generator General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommen?

are described below:

DUPLICATE DOCUMENT "A potential problem can exist if the nei Entire document Previously the primary windings of the excitation p' entered into system under-to as the control power transformer (CPT ANO f

1050 116 No.

f Pages:

+e es,n meme ei