c.
pnstop
- g
'o,,
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
s e REGION 11 g
D[
101 MARIETTA ST., N.W., SulTE 3100
%,*****,o ATLANTA.OEORGIA 30303 SEP 121979 TAa. it In Reply Refer To:
RII:JPG 50-413, 50-414 50-491, 50-492 50-493, % 4 M CJR89, 50-490 ?
~
Duke Power Company Attn:
L. C. Dail, Vice President Design Engineering P. O. Box 33189 Charlotte, North Carolina 28242 Gentlemen:
Enclosed is IE Bulletin 79-23 which requires action by you with regard to your power reactor facility (ies) with an operating license or a construction permit.
Should you have questions regarding this Bulletin or the actions required of you, please contact this office.
Sincerely, h
y k
'2 James P. O'Reilly Regional Director
Enclosures:
1.
List of IE Bulletins Issued in the Last Six Months
~
1050 103
'"0021 o,,,
SEP 121979 Duke Power Company.
cc w/ enc 1:
D. G. Beam, Project Manager Post Office Box 223 Clover, South Carolina 29710 J. T. Moore, Project Manager Post Office Box 422 Gaffney, South Carolina 29340 a
1050 104
4 Accession No. 7908220104 SSINS ho.:
6820 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 September 12, 1979 IE Bulletin No. 79-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:
Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility. Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.
Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in oserheating of the Exciter Power Transformers (EPTs) at sustained high load operation.
The following nameplate data applies to the enuipment installed at Turkey Point:
Emergency Diesel Generator General Motors (Electro-Motive Division)
Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommend N
1 are described below:
DUPLICATE DOCUMENT f
"A potential problem can exist if the neut Y
U Entire document pre,'
the primary windings of the excitation p I entered into systen-Tel to as the control power transformer (CPT),
O ANO l
A No. of Pages: _
1050 I d
-