Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19208C605
Person / Time
Site: Catawba, Perkins, Cherokee  Duke Energy icon.png
Issue date: 09/12/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
References
NUDOCS 7909270126
Download: ML19208C605 (2)


Text

c.

pnstop

  1. g

'o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

s e REGION 11 g

D[

101 MARIETTA ST., N.W., SulTE 3100

%,*****,o ATLANTA.OEORGIA 30303 SEP 121979 TAa. it In Reply Refer To:

RII:JPG 50-413, 50-414 50-491, 50-492 50-493, % 4 M CJR89, 50-490 ?

~

Duke Power Company Attn:

L. C. Dail, Vice President Design Engineering P. O. Box 33189 Charlotte, North Carolina 28242 Gentlemen:

Enclosed is IE Bulletin 79-23 which requires action by you with regard to your power reactor facility (ies) with an operating license or a construction permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, h

y k

'2 James P. O'Reilly Regional Director

Enclosures:

1.

IE Bulletin No. 79-23 2.

List of IE Bulletins Issued in the Last Six Months

~

1050 103

'"0021 o,,,

SEP 121979 Duke Power Company.

cc w/ enc 1:

D. G. Beam, Project Manager Post Office Box 223 Clover, South Carolina 29710 J. T. Moore, Project Manager Post Office Box 422 Gaffney, South Carolina 29340 a

1050 104

4 Accession No. 7908220104 SSINS ho.:

6820 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 September 12, 1979 IE Bulletin No. 79-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:

Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility. Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.

Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in oserheating of the Exciter Power Transformers (EPTs) at sustained high load operation.

The following nameplate data applies to the enuipment installed at Turkey Point:

Emergency Diesel Generator General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommend N

1 are described below:

DUPLICATE DOCUMENT f

"A potential problem can exist if the neut Y

U Entire document pre,'

the primary windings of the excitation p I entered into systen-Tel to as the control power transformer (CPT),