ML19208C570

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19208C570
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 09/12/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tallman W
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
References
NUDOCS 7909270090
Download: ML19208C570 (1)


Text

9 q

9 Rico s

o UNITED STATES E '% s, d'. i NUCLEAR REGULATORY COMMISSION i j%d

,c REGION I Os ' f4 g

631 PARK AVENUE D

KING OF PRUSSIA, PENNSYLVANIA 19406

%, ' %d

,o Dockei Nos. 50-443 50-444 SEP 121979 Public Service Company of New Hampshire ATTN:

Mr. W. C. Tallman President 1000 Elm Street Manchester, New Hampshire 03105 Gentlemen:

Enclosed is IE Bulletin 79-23 which requires action by you with regard to your power reactor facility (ies) with an operating license or a construction permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, xfe^&. L~

oyce'H. Grier

' Director

Enclosures:

1.

IE Bulletin No. 79-23 2.

List of IE Bulletins Issued in the Last Six Months cc w/encls:

John D. Haseltine, Project Manager 790927doW 1044 039

ENCLOSURE 1 Accession No. 790822010.4 -

SSINS No T 6020 ' '

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHI% TON, D.C.

20555 IE Bulletin No. 79-23 Date:

September ]2, 1979 Page 1 of 3 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSF0PMER Description of Circumstances:

Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at tileir Turkey Point facility.

Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential re: lay lockout on B and C phases; the B-EDG was manually stopped, thus inte.*rupting the test at that point in time.

Subsequent investigation and testing by the licensee revealed a desig, error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.

The following nameplate data applies to the equipment installed at Turkey Point:

Emergency Diesel Generator General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulatior-4160 V The manufacturer's findings and recommendations regarding the above problem are described below:

DUPLICATE DOCUMENT Entire document previously entered into system under:

7hAPM/

l 1042 040

^"

No. of pages:

<.