Text
- / te
.
,
"
'o
UNITED STATES
O
E\\,^,,','.j
NUCLEAR REGULATORY COMMISSION
'
,
a; c'
'/
r
REGION 11
o,
[
101 MARIETT A sT., N.W , sulTE 3100
ATLANTA, GEORGIA 30303
'
j
.....
In Reply Refer To:
JUL 2 41979
RII:DMM
50-327/79-38
Tennessee Valley Authority
Attn:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by D. M. Montgomery of this
office on July 9-12, 1979 of activities authorized by NRC Construction
Permit No. CPPR-72 for the Sequoyah Nuclear Plant facility, Unit No. 1,
and to the discussion of our findings held with C. E. Cantrell at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accorJance w e Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, 6 le of Federal Regulations, a copy of this letter and
the enclosed inspection :eport will be placed in the NRC's Public
Document Room.
If this report ccatains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified pericd, the report will be placed in the
Public Document Room.
Ib)
390h71
y 909 p04'70
JUL % 4 G76
_
,
.
?
'
Tennessee Valley Authority
~
-2-
.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
,
Sincerely,
)
Y
$$
,
T. Sutherland, Chief
Fuel Facility and
Materials Safety Branch
Enclosure:
Inspectica Report No. 50-327/79-38
'
,
a w/snelosure:
J. E.~Gilleland
Assistant Manager of Power
500C Chestnut Stree.t Tower'll
Chattanooga,' Tennessee 37401
.
x
G. G. Stack, Project Manager
Post Office Box 2000
Daisy, Tennessee ?J319
--
J. M. Ballentine
Plant Superintendent
Post Office Box 2000
,
'
'
.D.3isy, Teine ssee 37319
';
-
J, F. Cox
400 Commerc Street
'
'
W9D214
Knoreille, Tennessee 37902
,
,
r
.
,
'
D. L. Lambert, Pro,e'ct Engineer
-
400 Chestnut Street Tower II
thattanooga, Tennessee 37401
-
,
a
p e*
W
-
soo:ss
.
. . .
I
9
N .
.
=
+
p
_'
<
>
.s
,
t
-
,
,
,
.