ML19208B822

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-348/79-26 on 790709-13.No Noncompliance Noted
ML19208B822
Person / Time
Site: Farley 
Issue date: 07/25/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19208B823 List:
References
NUDOCS 7909210461
Download: ML19208B822 (2)


See also: IR 05000348/1979026

Text

k

  1. pn arcuq'o

UNITED STATES

.

NUCLEAR REGULATORY COMMISSION

Ej,"_,.g[g

.

REGION 11

' -

r

\\

101 M ARIETT A sT., N.W., sulTE '10o

  • k'%

o,,

ATLANTA, GEORGI A 30303

'

j'

  • ...+

In Reply Refer To:

RII:AKH

M 2 519F3

50-348/79-26

Alabama Power Company

ATTN:

F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by A. K. Hardin of this office on July 9-

13, 1979, of activities authorized by NRC License No. NPF-2 for the Farley Unit 1

facility, and to the discussion of our findings held with D. C. Poole at the con-

clusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported unre-

solved items. The status of these items is dt.~ussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written applicatirn within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

ILL

390ieg

790021096/ 4

.

.

JUL 2 51979

-2-

.

Alabama Power Company

.

Should you have any questions concerning this letter, we will be glad to discuss

them with vou.

Sincerely,

E. C.

Richard

. Lewis, Acting Chief

Reactor Operations and Nuclear

.

Support Branch

Enclosure:

Inspection Report No. 50-348/79-26

cc w/ enc 1:

A. R. Barton

Executive V4ce President

P. O. Box 2u41

Birmingham, AL 35291

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

C. Biddinger, Jr.

Manager-Corporate Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Manager

Drawer 470

Ashford, AL 36312

R. E. Hollands, Jr.

QA Supervisor

P. O. Box U

Ashford, AL 36312

J. T. Young

Vice President-Production

Post Office Box 2641

Birmingham, Alabama 35291

12_3

,

390fei4