ML19208B765

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-14,Suppl 2, Seismic Analysis for As-Built Safety-Related Piping Sys
ML19208B765
Person / Time
Site: Perkins  
Issue date: 09/07/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
References
NUDOCS 7909210354
Download: ML19208B765 (1)


Text

g..

'o,,

UNITED STATES I-7f6 8

NUCLEAR REGULATORY COMMISSION 407 s

o e

REGION II b[

101 MARIETTA ST., N.W., SUITE 3100

'7~

o, 9

ATLANTA, GEORGIA 30303 g*****o In Reply Refer To:

SEP 7 gg79 RII:JPO 50-413, 50-414 50-488, 50-489 50-490, 5k491 50-492, 50-493 Duke Power Company Attn:

1. C. Dail, Vice Presiden,e Design Engineering P. O. Box 33189 Charlotte, North Carolina 28241 Gentlemen:

The enclosed supplement to Bulletin No. 79-14 is forwarded to you to provide added guidance on the intent of the Bulletin. If you desire additional information regarding this matter, please contact this office.

Sincerely, James P. O'Reilly Director

Enclosures:

1.

Supplement 2 to IE Bulletin No. 79-14 2.

List of IE Bulletins Issued in the Last Six Months g

0 e.

.I.

C-7909210

Duke Power Company cc w/ encl:

D. G. Beam, Project Manager Post Office Box 223 Clover, South Carolina 29710 J.T.koore,ProjectManager Post Office Box 422 Gaffney, South Carolina 29340 I

U

< ?s.3b2

SSINS:

6820 Accesstion No.: 7908220109 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTCN, D.C.

20555 September 7, 1979 IE Bulletin No. 79-14 k

Supplement 2 SEISMIC ANALYSIS FOR AS-BUILT SAFETY-RELATED PIPING SYSTEMS Description of Circumstances:

IE Bulletin No. 79-14 was issued on July 2, revised on July 18, and first supplemented on August 15, 1979. The bulletin requested licensees to take certain actions to verify that seismic analyses are applicable to as-built plants. Supplement 2 provides the following additional guidance with regard to implementation of the bulletin requirements:

Nonconformances One way of satisfying the requirements of the bulletin is to inspect safety-related piping systems against the specific revisions of drawings which were used as.nput to the seismic analysis.

Some architect-engineers (A-E) however, m ending that their customers inspect these systems against the latest are rc rev'.siom. af the drawings and mark them as necessary to define the as-built ccafiguration of the systems. These drawings are then returned to the AE's offices for comparison by the analyst to the seismic analysis input. For licensees taking this approach, the seismic analyst will be the person who will identify nonconformances.

The first supplement to the bulletin provided guidance with regard to evaluation of nonconformances. That guidance is appropriate for licensees inspecting against later drawings.

The licensee should assure that he is promptly notified when the AE identifies a nonconformance, that the initial engineering judgment is completed in two days and that the analytical engineering evaluation is completed in 30 days.

If either the engineering judgement or the analytical engineering evaluation indicates that system operability is in jeopardy, the licensee is expected to meet the applicable technical specification action statement.

Visual Approximations Some licensees are visually estimating pipe lengths and other inspection elements, and have not documented which data have been obtained in that way.

Visual estimation of dimensions is not encoura ed for mos _mta W

where visual estimates are used, the ance requirements. Further, in doc DUPLICATE DOCUMENT o *

  • N* ~j C C ically identify those data that wea l,Entiredocumen into system under:

)

O h

bh ANO No. of pages:

h L- ___--

.........