ML19208B741

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-14,Suppl 2, Seismic Analysis for As-Built Safety-Related Piping Sys
ML19208B741
Person / Time
Site: McGuire, Mcguire  
Issue date: 09/07/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
References
NUDOCS 7909210299
Download: ML19208B741 (1)


Text

.

f fl0

/

'o,,

UNITED YTATk3 AY.357 8

NUCLEAR REGULATORY COMMISSION Spo g

o a

e REGIGN l>

\\..... o #

101 MARIETTA ST KW.; SUITE 3100 E

ATLANTA, GEORGIA 30303

!'In Reply Refer To:

${p 7

,070 RII:JPO 50-369, 50-370 50-269, 50-270 50-287 g

v?

\\

\\

vDuke; Power Company Atens W. O. Parker, Jr.

Vice Fresident, Steam Production P. O. Box 2178 Charlotte, North Carolina 28242 Gentlemen:

The enclosed supplement to Bulletin No. 79-14 is forwarded to you to provide added guidance on the intent of the Eulletin. If you desire edititonal information regarding this matter, please contact this

)'

of f'.ce.

Sincerely,

~ -.

- S N

James P. O'Reilly Director

Enclosures:

1.

Supplement 2 to IE Bulletin No. 79-14 2.

List of IE Bulletins Issued

(

in the Last Six Months s

(h! [ g#% '7 7 '()

O 4 Ufit)?.s r I, C g g go9 c10 i

Duke Power Company.-

cc w/ enc 1:

M. D. McIntosh, Project Manager Post Office Box 488 Cornelius, North Carolina 28031 J. C. Bogers, Project Manager Post 01fice Box 33189 Charlotte, North Carolina 28242 J. E. Smith, Station Manager Post Office Box 1175 Seneca, Sonti Carolina 29678 t

1 " *)

g..lg}sife < } *

  • sf 4 <

s

  • T.:
  • a..

SSINS:

6820 Accesstion No.: 7908220109 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 September 7, 1979 IE Bulletin No. 79-14 k

Supplement 2 SEISMIC ANALYSIS FOR AS-BUILT SAFETY-PILATED PIPING SYSTEMS Description of Circumstances:

IE Bulletin No. 79-14 was issued on July 2, revised on July 18, and first supplemented on August 15, 1979. The bulletin requested licensees to take certain actions to verify that seismic analyses are applicable to as-built plants. Supplement 2 provides the following additional guidance with regard to implementation of the bulletin requirements:

Nonconformances One way of satisfying the requirements of the bulletin is to inspect safety-related piping systems against the specific revisions of drawings which were used as input to the ceismic analysis. Some architect-engineers (A-E) however, are recommending that their customers inspect these systems against the latest revisions of the drawings and mark them as necessary to define the as-built configuration of the systems. These drawings are then returned to the AE's offices for comparison by the analyst to the seismic analysis input. For licensees taking this approach, the seismic analyst will be the person who will identify nonconformances.

The first supplement to the bulletin provided guidance with regard to evaluation of noaconformances. That guidance is appropriate for licensees inspecting against later drawings.

The licensee should assure that he is promptly notified when the AE identifies a nonconformance, that the initial engineering judgment is completed in two days and that the analytical engineering evaluation is completed in 30 days.

If either the engineering judgement or the analytical engineering evaluation indicates that system operability is in jeopardy, the licensee is expected to meet the applicable technical specification action statement.

Visual Approximations Some licensees are visually estimating pipe lengths and other inspection elements, and have not documented which data have been obtained in that way.

Visual estimation of dimensions is n where visual estimates are used, the ance requirements. Further, in docui DUPLICATE DOCUMENT

. gy ically identify those data that were Entire document previously entered into system under:

ANO No. of Pages: