ML19208B704
| ML19208B704 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/10/1979 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| TXX-3026, NUDOCS 7909210228 | |
| Download: ML19208B704 (1) | |
Text
7Zc-TENAS UTILITIES GENERATING COMPANY 2001 ItRYAN TOWER a DALLAS.TENAS 70201 August 10, 1979
...J.j. 7..'".7. m.,
.e
...m.
Mr. W. C. Seidle, Chief Reactor Construction & Engineering Suppcrt Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION POSSIBLE COOLING PROBLEM WITH DIESEL GENERATOR FILE N0.
10110
Dear Mr. Seidle:
On June 14, 1979, we verbally informed your Mr. R. G. Taylor of a possible cooling problem with the diesel generators.
We considered this "potentially" reportable under 10 CFR 50.55(e).
We are continuing our investigation and evaluation and will notify you as soon as we have reached a conclusion.
Very truly yours, h
I R. d. Gary /
RJG:dla cc:
NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 ff/M.M3 2102 28 79