ML19208B704

From kanterella
Jump to navigation Jump to search
Notifies of Continued Investigation Re Possible Cooling Problem W/Diesel Generator
ML19208B704
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/10/1979
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
TXX-3026, NUDOCS 7909210228
Download: ML19208B704 (1)


Text

7Zc-TENAS UTILITIES GENERATING COMPANY 2001 ItRYAN TOWER a DALLAS.TENAS 70201 August 10, 1979

...J.j. 7..'".7. m.,

TXX-3026

.e

...m.

Mr. W. C. Seidle, Chief Reactor Construction & Engineering Suppcrt Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION POSSIBLE COOLING PROBLEM WITH DIESEL GENERATOR FILE N0.

10110

Dear Mr. Seidle:

On June 14, 1979, we verbally informed your Mr. R. G. Taylor of a possible cooling problem with the diesel generators.

We considered this "potentially" reportable under 10 CFR 50.55(e).

We are continuing our investigation and evaluation and will notify you as soon as we have reached a conclusion.

Very truly yours, h

I R. d. Gary /

RJG:dla cc:

NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 ff/M.M3 2102 28 79