TXX-3026, Notification That Investigation & Evaluation Re Possibility of Cooling Problem W/Diesel Generators Is Continuing
| ML19242D058 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/10/1979 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| TXX-3026, NUDOCS 7908140446 | |
| Download: ML19242D058 (1) | |
Text
"EX.\\S ITILITIES GENERATING COMP.\\NY n,1 1610 A N I f Th I'll + lt\\l.1_\\%. 'I l' A AS 7T2()1 August 10, 1979 a;am TXX-3026
" L:'.. .:"
Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Tiuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMAtCHE PEAK STEAM ELECTRIC STATION 1931-33 2300 MW INSTALLATI0:;
POSSIBLE COOLING PROBLEM WITH DIESEL GENERATOR FILE NO.
10110
Dear Mr Seidle:
On June 14, 1979, we verbally informed your Mr. R. G. Taylor of a possible cooling problem with the diesel generators. We considered this "potentially" reportable under 10 CFR 50.55(e).
We are continuing our investigation and evaluation and will notify you as soon as we nave reached a conclusion.
Very truly yours,
,A R. 4. Gary RJG:dla cc:
NRC Region I'! - (0 + 1 copy)
Director, Inspection & Enforcement - (15 copies) c/o Distribution Ser. ices Branch, DDC, ACM.
U 3.
.uclear Regulatory Commission
'!ashin'; tan, D. C.
20555
, ' n?
9??
i' L.) #i 7 9 0b l 4 0 W /,