Forwards IE Insp Repts 50-518/79-13,50-519/79-13, 50-520/79-13 & 50-521/79-13 on 790619-22.No Noncompliance Noted
ML19208B606
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 07/26/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19208B607 List:
References
NUDOCS 7909210061
Download: ML19208B606 (2)


See also: IR 05000518/1979013

Text

TC

g [/ Q

.(#

o,

UNITED ST ATES

NUCLEAR REGULATORY COMMISSION

g g,

i '"# ( j

y y of

,

~'

c

REGION 11

101 M ARIETT A sT., N.W.. SUIT E 3100

hC

hhD

ATLANTA, GEORGIA 30303

%

In Reply Refer To:

JUL 2 61979

RII:WBS

50-518/79-13

50-519/79-13

50-520/79-13

50-521/79-13

Tennessee Valley Atthority

ATTN:

H. G. Parris

Manager of Power

500A Chastnut Street Tower II

Chattanooga, TN 37401

Centlemen:

This refers to the inspectica conducted by W. B. Swan of this office on June 19-22,

1979, of activities authorized by NRC Construction Permit Nos. CPPR-150, CPPR-151,

CPPR-152 and CPPR-153 for the Hartsville Nuclear Plant facilities, and to the

discussion of our findings held with R. T. Hathcote at the conclusion of the

,

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective exarinatior.s of procedures and representative records, interviews

-

.

-

with personnel, and observations by the inspector.

. Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If t!is

report contair s any inf(armation that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application withia 20 days

to this. office to withhold such information from public disclosure. Any such

applicatiou must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary inforraation identified in the application is contained in a

separate part of the document.

If we do not hear from you in thi:, regard

within the specified period, the report will be placed in the Public Document

Room.

.

384084

.

7909210 04/

.

JUL 2 s 1979

Tennessee Valley Authority

-2-

.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

91

C9L

-

(

C. E. Murphy, Chief

f Reactor Construction and Engineering

Support Branch

Enclosure-

Inspection Report Nos. 50-518/79-13,

50-519/79-13, 50-520/79-13 and 50-521/79-13

cc w/ enc 1:

J. E. Gi11 eland

Assistant Manager of Power

500C Chestnut Street Tower II

Chattanooga, TN 37401

R. T. Hathcote, Project Manager

P. O. Box 2000

Hartsville, TN 37074

J. F. Cox

400 Commerce Street

W10C131 C

Knoxville, Tennessee

37902

J. E. Wills, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

bOlOi3d

.