g [/ Q
.(#
o,
UNITED ST ATES
NUCLEAR REGULATORY COMMISSION
g g,
i '"# ( j
y y of
,
~'
c
REGION 11
101 M ARIETT A sT., N.W.. SUIT E 3100
hC
hhD
ATLANTA, GEORGIA 30303
%
In Reply Refer To:
JUL 2 61979
RII:WBS
50-518/79-13
50-519/79-13
50-520/79-13
50-521/79-13
Tennessee Valley Atthority
ATTN:
H. G. Parris
Manager of Power
500A Chastnut Street Tower II
Chattanooga, TN 37401
Centlemen:
This refers to the inspectica conducted by W. B. Swan of this office on June 19-22,
1979, of activities authorized by NRC Construction Permit Nos. CPPR-150, CPPR-151,
CPPR-152 and CPPR-153 for the Hartsville Nuclear Plant facilities, and to the
discussion of our findings held with R. T. Hathcote at the conclusion of the
,
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective exarinatior.s of procedures and representative records, interviews
-
.
-
with personnel, and observations by the inspector.
. Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If t!is
report contair s any inf(armation that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application withia 20 days
to this. office to withhold such information from public disclosure. Any such
applicatiou must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary inforraation identified in the application is contained in a
separate part of the document.
If we do not hear from you in thi:, regard
within the specified period, the report will be placed in the Public Document
Room.
.
384084
.
7909210 04/
.
JUL 2 s 1979
Tennessee Valley Authority
-2-
.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
91
C9L
-
(
C. E. Murphy, Chief
f Reactor Construction and Engineering
Support Branch
Enclosure-
Inspection Report Nos. 50-518/79-13,
50-519/79-13, 50-520/79-13 and 50-521/79-13
cc w/ enc 1:
J. E. Gi11 eland
Assistant Manager of Power
500C Chestnut Street Tower II
Chattanooga, TN 37401
R. T. Hathcote, Project Manager
P. O. Box 2000
Hartsville, TN 37074
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville, Tennessee
37902
J. E. Wills, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401