Text
/
%,
UNITED STATES
8'
/ ,o
NUCLEAR REGULATORY COMMISSION
$.
M'
$
REGION lli
DO
I
o,1 (
8
799 ROOSEVELT ROAD
g*
GLEN ELLYN, ILLINOIS 60137
- ....
JUL 191979
Docket No.
50-373
Docket No.
50-374
Commonwealth Edison Company
ATTN:
Mr. Byron Lee, Jr.
Vice President
P.O. Box 767
Chicago, IL 60690
Gentlemen:
This refers to the inspection conducted by K. R. Naidu and J. H. Neisler
of this office on June 27-28, 1979, of activities at La Salle County
Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-99
and No. CPPR-100 and to the discussion of our findings with Mr. L. J. Burke
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of a
selective examination of procedures and representative records, observations,
and interviews with personnel.
During this inspection, certain of your activities appeared to be in
noncompliance with NRC requirements, as described in the enclosed Appendix A.
The item is a deficiency and your staff has initiated corrective action;
consequently, no reply is required.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter, the
enclosures, and your response to this letter will be placed in the NRC's
Public Document Room, except as 'ellows.
If the enclosures contain
information that you or your contractors believe to be proprietary, you
must apply in writing to this office, within twenty days of your receipt
of this letter, to withhold such information from public disclosure. The
application must include a full statement of the reasons for which the
information is considered proprietary, and should be prepared so that
proprietary information identified in the application is contained in an
enclosure to the application.
,
.
v d (s('A *t
7909210 M b
.
.
Commonwealth Edison Company
-2-
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
Afh
Gaston Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Reports No. 50-373/79-26
and No. 50-374/79-18
cc w/ enc 1:
Mr. L. J. Burke, Site Project
Superintendent
Mr. T. E. Quaka, Quality
Assurance Supervisor
Mr. R. H. Holyoak, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
.
e