APPENDIX A NOTICE OF VIOLATION Boston Edison Company 1 Docket No. 50-293 Based on the results of an NRC inspection conducted on April 10-13, 1979, it appears that one of your activities was not conducted in full compliance with the Code of Federal Regulations and your Facility License No. DPR-35 as indicated below.
This item has been categorized as a deficiency.
Technical Specification 6.8.A. states in part, " Written procedures and administrative policies shall be established, implemented,...
Procedure 8.5.1.1., Core Spray Pump Operability Test and Flow Rate Test, written to satisfy Technical Specification 4.5.A.1.d., requires that the tested pumps meet the acceptance criteria of at least 3,600 gpm with a discharge pressure of at least 252 psig.
10 CFR 50, Appendix B, Criterion XI states in part, " Test results shall be documented and evaluated to assure that test requirements have been satisfied."
Contrary to the above, data from the September 7,1978, surveillance tast contained capacity values of 3,575 gpm and 262 psig for Core Spray Pump 215A.
Documentation to substantiate the performance of a retest could not be located.
Data to date, from subsequent surveillance tests have satisfied the acceptance criteria.
\\