Urges Firm Maint of Schedule for Implementation of All Mods Associated W/General Design Criterion 3 Re Fire Protection. Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis
ML19208A584
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/28/1979
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
References
NUDOCS 7909170033
Download: ML19208A584 (3)


Text

k

  1. m a:5%'o Y4 UNITED STATES E 5', s-q (' gg NUCLEAR REGULATORY COMMISSION

/.. E WASHINGTON, 0. C. 20555

  • % * *V [o,5

^

AUGUST 2 8 1979

+

..+

Docket Nos, 50-325 and 50-324 Mr. J. A. Jones 1 Q

- N Executive Vice President Unt L3 I

Carolina Power & Light Company 336 Feyetteville Street Raleigh, North Carolina 27602

Dear Mr. Jones:

In May 1976, we issued guidelines reflecting the NRC's policy regarding the implementation of General Design Criterion 3 - Fire Protection. Since that time, you have performed a fire hazards analysis for your facility and have compared its fire protection program with the NRC guidelines.

In late 1976, we set October 1980 as the date fer completing the implementation of all modifications associated with this program. This implementation schedule recognized that such modifications should be completed as soon as practical, with due consideration of the nature of the modifications. For example, minor modifications, adoption of administrative controls and additional portable equipment would be completed within six months; however, major nodifications would require a year or more to complete and some modifications would be coordinated with refueling outages.

By their Memorandum and Order in the matter of the Union of Concerned Scientists' Petition for Emergency and Remedial Action, dated April 13, 1978, the Commission directed the staff to use their best efforts to maintain this schedule, and also directed that the Commission be advised if any slippage is anticip'ated, along with suggested corrective actions.

Amendment Nos.11 and 37 v:ere issued to DPR-71 and DPR-62 on November 22, 1977 uhich established a schedule for completion of fire protection nodifications and open items at the BSEP facility. Due to unforeseen schedule slippages, DPR-71 and DPR-62 were modified on April 6,1979 by Amendment Nos. 23 and 47 to allow revised implementation dates. We urge you to apply your best efforts 951001 19091'70033

Mr. J. A. Jones to maintain your schedules for completion of all of the fire protection modifications at your facility and to submit, on an expedited basis, any infornation that is still outstanding with regard to open items and required design details, i ncerely,

~3 u,Ict T.

1se Division of Operating Reactors Office of Nuclear Reactor Regulation cc:

see next page 36.i.0G,?

Mr. J. A. Jones Carolina Power & Light Company cc:

Richard E. Jones, Esquire Carolina Power & Light Company 336 Fayet'teville Street Raleigh, North Carolina.27602 George F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge 1800 M Street, N. W.

Washington, D. C.

20036 John J. Burney, Jr., Esquire Burney, Burney, Sperry & Barefoot 110 North Fifth Avenue Wilmington, North Carolina 28401 Southport - Brunswick County Library 109 W. Moore Street Southport, North Carolina 28461 351003