Forwards IE Insp Rept 50-456/79-08 & 50-457/79-08 on 790621.No Noncompliance Noted
ML19208A228
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/16/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19208A229 List:
References
NUDOCS 7909130249
Download: ML19208A228 (2)


See also: IR 05000456/1979008

Text

/p* ** c

'o

UNITED STATES

'

l'

gg ' ,7,

NUCLEAR REGULATORY COMMISSION

$

,hf E

REGION 111

TIC

h

!

799 noOSEVELT ROAD

gv[/

g

,

coeu rttvu. ittisois soia7

.....

~

Jbi.161979

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. E. R. Schweibinz of this

of fice, on June 21, 1979, of activities at Braidwood Nuclear Power Station,

Units 1 and 2, authorized by NRC Construction Pern;its No. CPPR-132 and

No. CPPR-133 and to the discussion of our findings with Mr. Cosaro,

Mr. Homoly and others of the Braidwood staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observations,

and interviews with personnel.

No items of noncompliance with NRC requirenents were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's "Eules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to 'oe proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to withhold

such information from public disclosure. The application must include a

full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

n s e: ssa

s> kf a 11.# fi

7 9 f) 9 ' 'l O

$

/

'

JUL 161979

Commonwealth Edison Company

-2-

.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-456/79-08

and No. 50-457/79-08

cc w/ enc 1:

Mr. R. Cosaro, Project

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

- g q (7

4 k )1' If^'