ML19207B464

From kanterella
Jump to navigation Jump to search
Forwards LER 79-052/03L-0
Date released: 08/09/2019 Download: ML19207B464


LER 79-052/03L-0 on 790728:during Startup,Rods 26-15 & 18-23 Had No Position Indication at Notchs 38 & 30,respectively. Caused by Faulty Prototypic Inlet Piping Probe in Drywell. Problems Will Be Corrected During Next Outage
ML19207B469
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/24/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207B469 (1)
Forwards LER 79-052/03L-0
ML19207B463
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/24/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207B463 (1)