05000334/LER-1979-025-03, /03L-0 on 790624:during Records Review,Biasing Circuit for Channel 2 Temp Change Signal Summator Produced Output Signal Setpoint Approx 25 Degrees Too Low. Caused by Failure of Instrument Loop Signal Summator

From kanterella
(Redirected from ML19207B458)
Jump to navigation Jump to search
/03L-0 on 790624:during Records Review,Biasing Circuit for Channel 2 Temp Change Signal Summator Produced Output Signal Setpoint Approx 25 Degrees Too Low. Caused by Failure of Instrument Loop Signal Summator
ML19207B458
Person / Time
Site: Beaver Valley
Issue date: 08/23/1979
From: Werling J
DUQUESNE LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19207B453 List:
References
LER-79-025-03L, LER-79-25-3L, NUDOCS 7908290492
Download: ML19207B458 (1)


LER-1979-025, /03L-0 on 790624:during Records Review,Biasing Circuit for Channel 2 Temp Change Signal Summator Produced Output Signal Setpoint Approx 25 Degrees Too Low. Caused by Failure of Instrument Loop Signal Summator
Event date:
Report date:
3341979025R03 - NRC Website

text

..._

LICENSEE EVENT REPORT-CONTROL BLOCK: l 'l l

l l

l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATIONI i

6 IP l A l a lv ls Il Iglo 10 l-lo lo lo 10 lo l-lo lo l@l4 l1 l1 l1 l1 l@l l.1@

o i

7 8 9 L8CENSEE CODE 14 15 LICENSE NUMSEM 25 26 LICENSE T YPE JQ

$ 7 CAT b8 CON'T lTITl Qu'R$

L l@l 0 l 5 l 0 l 0 l 0 l 3 l 3 l 4 @l 0 l 6 l 2 l 4 l 7 l 9 l@l 0l 8 l 2l 3 l 7 l 9 l@

7 8

60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o

2 l During a records review on 7/24/79, it was discovered that the results of a l

o 3 g surveillance test performed on 6/24/79 were unsatisfactory. The biasing circuit for l

ITTTl I the Channel 2 Delta T-Tavg signal summator was producing an output signal setpoint j

ITTT1 I approximately 25 degrees less than required. This failure was in the conservative l

ITTiG l direction and would have resulted in the channel tripping sooner than required.

J IIIII l l

o a !

l i

8 9 80 E

CODE SUSCO E COMPONENT CODE SUSC dE S

E IIII]

lI l A lh Wh l E 'h l Il Nl Sl Tl Rl Ulh Wh l Zlh 8

9 10 11 32 13 18 19 20 SEQUENTIAL OCCURRENCE REPOf1T REVISION LE R/RO EVENT YEAR REPORT NO.

CODE TYPE N O.

h8E,POy l7 l9l l-l l0l2l5l l/l l'0 l 3 i lL l

[--J W

g 26 22 23 24 26 27 28 29 30 31 32 KE AC ON ON PL NT ME HOURS SS IT D POR 8.

SUPPLIER MAN FACTUREP lCl@ W @

l Z l@

lZl@

l0l0l0l0l lNl@

l Y l@

Nl@

l W l 1 l 2 l 0 l@

3J 34 35 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h Qg l The incident resulted from a failure of the instrument loop signal summator.

The l

gl summator was replaced and the loop was calibrated successfully.

I ITTTll' I

LLL3_j I l

1 4 l

l 8 9 80 STA S

% POWER QTHER STATUS IS O RY DISCOVERY CESCRIPTION W h l0l0l0l@l N/A l

l B,]l Surveillance test l

1 5

ACTIVtTY CO TENT REttASE@o OP RELEASE lZl@l AuOuNToP ACTiviTv h l LOCATION OP RELEASE W

"/A l

N/A l

1 G

8 9 10 11 44 45 PERSONNSL EXPOSURES 80 NUv8ER 10 l 0 l 0 lhl TYPE @l DESCRIPTION Zl N/A l

1 7

PERSON ~E L iNJES oESCRiPriON@

NUu8ER 11.RJ l 010101@l N/A l

8 9 11 12 80 Lots OP OR DAMACE TO PACILtTY 79082909 0 853 323 l

l@l N/A 1

9 i

8 9 10 80

DESCRIPTION

ISSUED @l

'N/A l

lllllllllllll$

[ Nj 2

o 1

8 3 to 68 69 80 5

~

NAME OF PREPARER PHONE: