ML19207B319

From kanterella
Jump to navigation Jump to search
Forwards LER 79-049/03L-0
Date released: 08/09/2019 Download: ML19207B319


LER 79-049/03L-0 on 790724:drywell 0-2 Monitor Air Dryer Showed -1259 Reading During Normal Operation After Routine Preventive Maint.Caused by Ice Buildup on Chiller Coils Resulting in Reduced Sample Flow
ML19207B323
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/21/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207B323 (2)
Forwards LER 79-049/03L-0
ML19207B318
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/21/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207B318 (1)