Text
M
//c
-
/pm arcg'o
UNITED STATES
!'
, ,, g
NUCLEAR REGULATORY COMMISSION
,
- .- %f _ c
REGION 11
o, i
f
101 MARIETT A sT., N.W.. SUITE 3100
j'
ATLANTA, GEORGIA 30303
'
JUL 101979
In Reply Refer To:
'
RII:ABR
50-327/79-32
50-328/79-17
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This rners to the inspection conducted by A. B. Ruff of this office on June 19-22,
1979, of activities authorized by NRC Construction Permit Nos. CPPR-72 and CPPR-73
for the Sequoyah 1 and 2 facilities, and to the discussion of our findings held with
G. G. Stack at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclow 3 inspection report.
.l; thin these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necesstry that you make a written application within 20 days to this office to
withhold such information f rom public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietarf, and shculd be prepared so that proprietary infor-
mation iden'.ified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Shtuld you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
M
Charles E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
781014
Enclosure:
See Page 2
Q/O
gg
F
JUL 1 01979
.
Tee -ssee Valley Authority
-2-
.
Enclosure:
Inspection Report Nos. 50-327/79-32
ana 50-328/79-17
cc w/ encl:
J. E. Gi11 eland
Assistant.Mjnager of Power
500C Chestnut Stree Tower II
Chattanooga, TN 37401
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville, TN 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
781015