Forwards IE Insp Repts 50-327/79-32 & 50-328/79-17 on 790619-22.No Noncompliance Noted
ML19207B268
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/10/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19207B269 List:
References
NUDOCS 7908240210
Download: ML19207B268 (2)


See also: IR 05000327/1979032

Text

M

//c

-

/pm arcg'o

UNITED STATES

!'

, ,, g

NUCLEAR REGULATORY COMMISSION

,

.- %f _ c

REGION 11

o, i

f

101 MARIETT A sT., N.W.. SUITE 3100

j'

ATLANTA, GEORGIA 30303

'

JUL 101979

In Reply Refer To:

'

RII:ABR

50-327/79-32

50-328/79-17

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This rners to the inspection conducted by A. B. Ruff of this office on June 19-22,

1979, of activities authorized by NRC Construction Permit Nos. CPPR-72 and CPPR-73

for the Sequoyah 1 and 2 facilities, and to the discussion of our findings held with

G. G. Stack at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclow 3 inspection report.

.l; thin these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necesstry that you make a written application within 20 days to this office to

withhold such information f rom public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietarf, and shculd be prepared so that proprietary infor-

mation iden'.ified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Shtuld you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

Charles E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

781014

Enclosure:

See Page 2

Q/O

gg

F

JUL 1 01979

.

Tee -ssee Valley Authority

-2-

.

Enclosure:

Inspection Report Nos. 50-327/79-32

ana 50-328/79-17

cc w/ encl:

J. E. Gi11 eland

Assistant.Mjnager of Power

500C Chestnut Stree Tower II

Chattanooga, TN 37401

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

J. F. Cox

400 Commerce Street

W10C131 C

Knoxville, TN 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

781015