ML19207B256
| ML19207B256 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/06/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Clayton F ALABAMA POWER CO. |
| Shared Package | |
| ML19207B257 | List: |
| References | |
| NUDOCS 7908230682 | |
| Download: ML19207B256 (2) | |
See also: IR 05000348/1979025
Text
%h
(
o
f aarco
'o
UNITED STATES
8\\ 3 ., ( f' ,7,
NUCLEAR REGULATORY COMMISSION
.
$.g-
.(
$
REGION 11
'*
o, h
101 MARIETT A sT., N.W., SUITE 3100
' b-
ATLANTA, GEORGIA 303o3
.....
.
JUL 0 61979
In Reply Refer To:
RII:WPA
50-348/79-25
_
Alabama Power Company
ATTN:
F. L. Clayton, Jr.
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by W. P. Ang of this office on June 20-
22, 1979, of activities autborized by NRC License No. NPF-2 for the Farley
Nuclear Plant, Unit I facility, and to the discussion of our findings held with
W. G. Hairston at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspectica report.
Within these areas, the inspection consi:ted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
,..
..i
(,
,
7908280
-
.
JUL 0 61979
'
Alabama Power Company
-2-
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
f
'
-
Charles E. -Murphy,-Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report No. 50-348/79-25
cc w/ enc 1:
A. R. Barton
Executive Vice President
Post Office Box 2641
Birmingham, AL 35291
H. 1. Thrash
Manager-Nuclear Generation
Post Office Box 2641
Birmingham, AL 35291
C. Biddinger, Jr.
Manager-Corporate Quality Assurance
Post Office Box 2641
Birmingham, AL 35291
W. G. Hairston, III
Plant Manager
Drawer (70
Ashford, AL 36312
R. E. Hollands, Jr.
QA Supervisor
Post Office Box U
Ashford, AL 36312
J. T. Young
Vice ? resident - Production
Post Cffice Box 2641
Birmitgham, AL 35291
e
'
'
. . , ,