ML19207B251
| ML19207B251 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/25/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Clayton F ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML19207B252 | List: |
| References | |
| NUDOCS 7908230677 | |
| Download: ML19207B251 (2) | |
See also: IR 05000348/1979022
Text
on-~
l i c-
o
- cp *" "' G%,'o,
UNITED STATES
!'
_ '
%
NUCLE AR REGULATORY COMMISSION
- e
5
REGION il
0 .k' ' 'h 3
' '
o,
f
101 MARILTT A sT , N W., sulTE 3100
'
'I
ATLANTA. GEORGIA 30303
j
InReply... Refer To:
RII: PAT
JUN 2 51979
50-348/79-22
Alabama Power Company
Atta:
F. L. Clayton, Jr.
Senior Vice President
Post Office Box 2641
Birmingham, Alabama 35291
Gentlemen:
This refers to the inspection conducted by P. A. Taylor of this office
on June 4-5, 1979,of activities authorized by NRC License No. NPF-2 for
the Farley facility, Unit No.
1, and to the discussion of our findings
held with W. G. Hairston at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice"
Part 2, Title 10, Code of Federal Regulations, a copy of tt.is letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necesso., that you
make a written application within 20 days to this of fice to eithhold
such information from public disclosure.
Any such application must
include a full sta'.ement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
s
-
l
) -
6
00gggn &k -
7
,
'
Alabama Power Company
-2-
JUN
51979
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
/
E. C.
zp
e.is, Chief
R. C.
w
Reactor Operations and
Nuclear Support Branch
Enclosure:
Inspecticn Report No. 50-348/79-22
cc w/ enclosure:
A. R. Barton
Executive Vice President
Post Office Box 2641
Eirmingham, Alab:ma 35291
H. O. Thrash
Manager-Nuclear Generation
Post Office Box 2641
Birmingham, Alabama 35291
C. Biddinger, Jr.
Manager-Corporate Quality Assurance
Post Office Box 2641
Bi rmingham, Alabama 35291
R. E. Hollands, Jr.
QA Supervisor
Post Office Box U
Ashford, Alabama
36312
W.
G. Hairston, III
Plant Manager
P. O. Drawer 470
Ashford, Alabama 36312
s
-e
.
'g
'