g' '

/ .I ....b.

Carolina Power & Light Company August 20, 1979 FILE: NG-3513 (B) SERIAL: GD-79-2076 M' . Victor Stello, Jr. , Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWlCK STEAM ELECTRIC PI ANT, UNIT NOS. 1&2 LICENSE NOS. DPR-71 & 6.^

DOCKET NOS. 50-325 & 50-324 SUPPLEf1ENTARY MONTHLY OPERATIONS REPORT

Dear Mr. Stello:

A follow-up revi s of the Brunswick Steam Electric Plant Monthly Operations Report for July, dated August 10, 1979, indicated that unit shutdown and power reductions No. 13 was incorrectly listed as No. 14. In addition, the information provided in columns labeled "No." through " Component Code" was that of No. 14. Attached is a revised page to replace the incorrect page in that report.

Carolina Power & Light Company regrets that this error has occurred and hopes that no problems have resulted.

If you have any questions regarding this matter, please contact my staff.

Yours very truly,

/,g / w'd H. R. Banks Manager Nuclear Generation SBT:jmb*

Attachment cc: Mr. R. A. Hartfield Mr. J. P. O'Reilly

  • /M202 L;

411 fayettevme Street

  • P. O. Box 1551
  • Raleigh. N C. 27602 1

.. . . . , , ~ . . .

7908230(/

w REVI~ ION O '

D 'D) 0 5 0-O'l ?L __

'g cv1 _

UNil Sl!U1 DOWNS \ND FOhER REDUCTIONS DOCKET NO.

UNIT NAME Arimetd ci- "n 1 0 9 DATE Anetmt - 1979 v A

}k JL -Q REPORT MONTil Julv COMPLE1ED By TELEPIIONE Eulis 4. Willis 919-457-9521

_. E E

-, 5? 'h 4 S '4 1 A en see [ -+,, l:, Cau se & Correctise

% Daic "-

5E 3 iis f aen: 3?

2 hy Action to f 2 3g5 Report = zL E- Pment Recurrence

- c L 6

013 790718 F 17.7 A 3 N/A CB GENERA Reactor Scram an APRM flow biased upscale. The APRM flow biased up-scale was caused while placing the B recirculation loop in service following a trip of the B recircula-ting pump M-G set. The I?-G set had tripped on low lube oil pressure following a motor and breaker failure on one of two operating M-G set lube oil pumps. The standby lube oil pump failed to start on loss of the operating pump.

(1) Checked all recirculation flow units and transmitters. All were within limits but lowest one (Unit C) was readjusted. (2) Performed functional test on flow Unit C.

Results satis factory.

I 3 2 4 I- I u scJ Reason M et h od : E slubit G - Instructions S Ss heJ u'ed A-Fquipinent Failure ( Exrla:n) 1 -Man ual for Preparation of Data

. ILMaintenance or Test 2-Manual Serare. I ntrs Sheets tor Licensee I N C.Refueline 3- Automatic Serain. Esent Report (I l' R) I ile (NURI G I

kb D-RecuiatJrs Rest riction 4-Other (l:splani) 0101)

I -Op'erator Irainsiig & l.icciise 1 xainin.itiori t F Adiiuriistratise 5 C G-Operational 1:iror ( E xplain ) E slubit ! - Same Source

, (4/77) Q ll Olher (l.spland

  • I