ML19206B143
| ML19206B143 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/30/1977 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Herbein J METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19206B146 | List: |
| References | |
| NUDOCS 7905070474 | |
| Download: ML19206B143 (1) | |
Text
-
CsW M stir >
.p8 "8%c, UNITED STATES
+
o, NUCLEAR REGULATORY COMMisslON P
/
REGION I 3 ~;.'.
f
$21 PARK A VENUE
/
KING or PRuss A, PENNsV1.VANI A 19406 Docket No. 50-320 s ? 3 0 1377 Metropolitan Edison Ccmpany Attn: Mr. J. G. Herbein Vice President P. O. Box 542 Reading, Pennsylvania 19603 Gentlemen:
Subject:
Building Spray Pump Head Curves (Your letter of September 21,1977)
Thank you for your letter, referenced above, which forwarded a final report pursuant to 10 CFR 50.55(e) regarding the subject matter.
This matter will be reviewed during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, e
bf l bert T. Carlson, Chief o
Reactor Construction and Engineering Support Branch cc:
R. L. Wayne, QA Manager, Design and Construction T. M. Crimins, Jr., Safety & Licensing Manager G. P. Miller, Superintendent R. W. Heward, Jr., Project Manager R. C. Arnold, Vice President, Design & Constructio.
Gerald Charnoff, Esquire Miss Mary V. Southard, Chairman Citizens for a-Safe Environment n -: )
m.
U,-
L.
I t
e
{
($
7905070<pt/'
w a g